Canada Dock Branch

Canada Dock branch

The Canada Dock branch passes beneath the Merseyrail Northern Line near Balliol Road, entering the dock complex.
Overview
Status Operational
Locale United Kingdom (Liverpool
North West England)
Stations 0
Operation
Opened 1866
Owner Network Rail
Technical
Line length 4 mile 59 chain (7.62 kilometre)
Number of tracks Double track throughout
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Loading gauge W10
Route map

The Canada Dock Branch is a 4-mile 59 chain (7.62 kilometre) long railway line in Liverpool, England. The line runs from the large Edge Hill rail junction in the east of Liverpool to Seaforth Dock to the north. The line was originally built by the London and North Western Railway terminating at Canada Dock, with a latter branch extension added to Alexandra Dock and links onto the MDHC railway lines. The line is not electrified.

History

The line opened in 1866 between Edge Hill and Canada Dock. On 5 September 1881 a line to Alexandra Dock was opened branch from the mainline at Atlantic Junction in a cutting below Kirkdale Station. On 1 May 1886 a junction with the Liverpool, Crosby and Southport Railway was opened from the Alexandra Branch.

By 31 May 1948 all the passenger stations on the line had closed. The line continued to be used by regular Liverpool Lime Street to Southport services, which operated primarily to provide a convenient Southport connection to London trains. The service was withdrawn in October 1977.[1] A new Merseyrail underground station below the mainline Lime Street station gave access from Southport via the Merseyrail Northern Line and Wirral Line.

The extension to Hornby and Gladstone Docks was abandoned in September 1973, and reconnected in September 1985 for the transport of grain and coal.[2]

Today

The line is currently a busy freight-only diesel-traction line and is sometimes called the Bootle Branch or Seaforth Container Terminal Branch (SCT) providing the sole remaining rail connection to the Port of Liverpool.

Approximately 70% of the North West of England's freight runs through Liverpool. The Olive Mount chord at Edge Hill junction was re-opened in December 2008 and approximately doubled the Canada Dock branch's throughput of freight from the Port of Liverpool to the West Coast Main Line. The reinstatement of the chord is essential for existing port operations, ready for the 100% increase in freight when the planned Post-Panamax, Liverpool2 container terminal is ready at Seaforth Dock. The new container terminal will berth the world's largest container ships, transporting up to 14,000 containers per ship. There will be further demand on the rail link into the port because of the increased use of imported eco wooden pellets for Drax and other power stations.[3] A high throughput on the Canada Dock branch line, the only line now remaining into the port of Liverpool is essential for efficient port operation.

It is hoped the increase of rail use on the Canada Dock branch line will remove large road vehicles from congested areas, such as Switch Island, giving many local environmental benefits.

The future

Due to the construction of Liverpool2 container terminal at the port of Liverpool the line will increase in freight traffic. The line is also being seriously assessed for reopening to passengers with Everton F.C. and Liverpool F.C. stadia both along the line's route.

On 16 July 2007 the Liverpool Daily Post reported that Liverpool F.C. may partially fund the reopening of the line to passenger services providing a direct rail link to the proposed Stanley Park Stadium however this project has since been dropped by the club.[4] This was highlighted on the Network Rail North West development plan as a potential project to be undertaken by Network Rail, rather than Liverpool F.C..

The Department for Transport's Rail electrification document of July 2009, states that the route to Liverpool Docks will be electrified. The Canada Dock Branch Line is the only line into the docks.[5] From the document:

70. Electrification of this route will offer electric haulage options for freight.
There will be an alternative route to Liverpool docks for electrically-operated freight trains, and better opportunities of electrified access to the proposed freight terminal at Parkside near Newton-le-Willows.

The electrification of this branch line would greatly assist in recommissioning passenger trains, as costs would be reduced. The electrification of the Liverpool and Manchester line will reduce travel time from around 45 minutes to 30 minutes due to the greater acceleration achieved by electric trains, clearing lines quickly, and the raising of the speed limit along the line from 75 to 90 mph.[5][6] These advantages will cascade onto the Canada Dock branch line. Class 319 dual-voltage, 3rd rail and overhead wires, EMUs will be fully refurbished and transferred from the Thameslink route to operate between Liverpool, Wigan and Manchester.[5] The dual voltage trains can operate on Merseyrail's 3rd rail network giving greater scope for route planning.

The Route Utilisation Strategy document makes note of the benefits of dual-voltage Electric multiple unit trains, which can be utilised on both the third rail Merseyrail network and future electrified lines which are likely to use overhead wires.

There is also a serious suggestion to introduce passenger services on this line in the Local Transport Plan for Merseyside.[7] This was again mentioned in Merseytravel's 30-year plan of 2014.[8]

In May 2016 it was announced that the line would be doubled in the trains using the line to the port. Combined with improved signalling at Earlstown, the improvements will enable up to 48 trains a day to enter the port. Work on the line is expected to be completed by 2019.[9]

Canada Dock Branch
Merseyrail map 
This 1909 map shows the line as the red line from Edge Hill to Canada Dock via Tuebrook. The branch after Kirkdale station is to Alexandra Dock. 

References

  1. "Disused Stations - Spellow"Disused Stations Site Record
  2. Johnston, Howard (January 1986). "Around the regions: Midland - Liverpool". Rail Enthusiast. No. 52. EMAP National Publications. p. 58. ISSN 0262-561X. OCLC 49957965.
  3. "Liverpool port progresses biomass development". Argus. 12 March 2013. Retrieved 27 November 2015.
  4. "New rail link crucial for 80,000-seat stadium plan". Liverpool Daily Post. 16 July 2007. Archived from the original on 27 September 2007. Retrieved 16 July 2007.
  5. 1 2 3 "Britain's Transport Infrastructure Rail Electrification" (PDF). Department for Transport. Archived from the original (PDF) on 8 April 2010.
  6. "Network RUS Electrification" (PDF). October 2009. Retrieved 20 October 2013.
  7. "Chapter 15: The Enhanced Programme - Major Schemes" (PDF). Transport Merseyside. Retrieved 3 July 2008.
  8. Shennan, Paddy (28 August 2014). "Merseytravel plan to open or reopen host of new stations". Liverpool Echo. Retrieved 30 August 2014.
  9. "Rail upgrades promised as part of Port of Liverpool developments"Rail Technology Magazine article, 16 May 2016

Further reading

Wikimedia Commons has media related to Canada Dock Branch.
This article is issued from Wikipedia - version of the 11/6/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.