Downsview Park (TTC)
Location |
1212 Sheppard Ave West, Toronto, Ontario Canada | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | 43°45′14″N 79°28′42″W / 43.75389°N 79.47833°WCoordinates: 43°45′14″N 79°28′42″W / 43.75389°N 79.47833°W | ||||||||||||||||||||
Platforms |
TTC Subway: 1 island[1] GO Transit: 2 side[1] | ||||||||||||||||||||
Tracks | 2 TTC and 2 GO Transit | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Platform levels | 3[1] | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Architect | Aedas | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Status | Under construction | ||||||||||||||||||||
History | |||||||||||||||||||||
Opening | 2018[2] | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Downsview Park is an intermodal transit facility under construction on the University branch of the Yonge–University line of the subway system in Toronto, Ontario, Canada. It is located on the south side of Sheppard Avenue West where the GO Transit Barrie line crosses, and is expected to open after the end of 2017.
It is a fully integrated multi-modal transit facility serving both TTC and GO trains. In contrast, other interchanges between TTC subway and GO Transit rail lines have separate structures for each agency. The TTC subway platform will be built underground on an east-west axis parallel to Sheppard Avenue West, and the GO Transit commuter rail station will be built at the surface on a north-south axis. An intermediate TTC concourse level will be located below ground between the two. GO Transit has committed to cost sharing at this station. Upon its opening, this station will replace the York University GO Station located a short distance to the north; that station will then be closed. A southerly extension of Bakersfield Street on the west side of the station will provide vehicle access and passenger drop off.[1]
Name
The station was originally expected to be named Sheppard West[3] and is still officially referred to by that name during construction.[4]
Approval was given in 2010 for the station to be named Downsview Park, subject to the satisfactory resolution of negotiations between the Toronto Transit Commission, the City of Toronto, and Parc Downsview Park related to property acquisition, and to rename the existing Downsview station to Sheppard West.[5]
Construction
Architecture firm Aedas was commissioned to design the station; their initial plan provides twinned entrances on opposite sides of the rail corridor, each with green roofs that resemble landing strips or wings.[6]
The official ground breaking ceremony for the Spadina Extension was held on 27 November 2009,[7] however tunnelling operations did not commence until June 2011.[8]
It is estimated that 31 December 2017 would be the earliest achievable date to deliver the project.[2]
Nearby landmarks
Nearby landmarks include Downsview Park, which is Canada's National Urban Park and played host to World Youth Day in 2002 and the SARSstock concert in 2003. The Park is site of an airstrip used by an airplane manufacturer Bombardier Aerospace and formerly used as Canadian Forces Base Downsview. Other points of interest include the Chesswood hockey arenas, and the industrial lands north of Sheppard.
Surface connections
A transfer is required to connect between the subway and surface bus routes. [9]
- 84B/C/D Sheppard West
- 101 Downsview Park
- 107 Keele North
References
- 1 2 3 4 "Sheppard West Subway Station Open House" (PDF). Toronto-York Spadina Subway Extension. Toronto Transit Commission. Retrieved 16 January 2013.
- 1 2 A. Byford, CEO (26 March 2015). "Toronto-York Spadina Subway Extension – Schedule and Budget Change" (PDF). Toronto Transit Commission. Retrieved 6 April 2015.
The TYSSE project is currently 70 per cent complete. However, it has been determined that the publicly stated opening date of the end of 2016 and the approved budget are not achievable. This report recommends that a comprehensive project “reset” involving a new third-party project manager be undertaken to deliver the project by December 31st, 2017
- ↑ Tess Kalinowski (27 November 2009). "TTC breaks ground on subway extension". Toronto Star. Retrieved 16 January 2013.
- ↑ "Sheppard West Station (TTC official site)". Toronto Transit Commission. Retrieved 16 January 2013.
- ↑ "Toronto-York Spadina Subway Extension, Station Names" (PDF). Toronto Transit Commission. 30 September 2010. Retrieved 16 January 2013.
- ↑ "Sheppard West Station, Approval Of Conceptual Design" (PDF). Toronto-York Spadina Subway Extension Project. Toronto Transit Commission. 24 September 2009. Retrieved 16 January 2013.
- ↑ "Toronto-York Spadina Subway Extension breaks ground". Railway Gazette. 30 November 2009. Retrieved 16 January 2013.
- ↑ "Tunnel boring for Toronto-York Spadina Subway Extension begins". Toronto Transit Commission. 17 June 2011. Retrieved 16 January 2013.
- ↑ http://ttc.ca/TTC_Surveys/Subway_Access_Adjust.jsp
External links
- Sheppard West Station (TTC official site)
- Map indicating alignment of extension and location of stations