Falmer railway station
Falmer | |
---|---|
Falmer railway station in 2005 | |
Location | |
Place | Falmer |
Local authority | Brighton and Hove |
Grid reference | TQ347086 |
Operations | |
Station code | FMR |
Managed by | Southern |
Number of platforms | 2 |
DfT category | E |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2010/11 | 1.001 million |
2011/12 | 1.249 million |
2012/13 | 1.250 million |
2013/14 | 1.317 million |
2014/15 | 1.336 million |
History | |
8 June 1848 | Opened |
1 August 1865 | Resited |
1890 | Rebuilt |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Falmer from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Falmer railway station is on the outskirts of Brighton, south-east England. It is operated by Southern and lies on the East Coastway Line.
The station serves the village of Falmer as well as the University of Sussex campus and the University of Brighton Falmer Campus. It also serves Falmer Stadium, the new home of Brighton & Hove Albion F.C. (opened August 2011). The buildings on the down (eastbound) platform side include a well-preserved, unusual example of a signal-box.
The original station was approximately 1 mile east of its present location, and opened on 8 June 1846. It was moved to its present location, much closer to the village, on 1 August 1865, and rebuilt in 1890.[1] The buildings on the down (eastbound) platform date from this time, but modern replacements have been installed on the westbound side.
Service
The typical off-peak service is:
- 4tph (trains per hour) to Brighton westbound
- 2tph to Seaford eastbound
- 1tph to Ore via Hastings and Eastbourne eastbound
- 1tph to Lewes eastbound
Additional matchday-only trains operate to and from Falmer from Brighton and Lewes to serve the Falmer Stadium.
In addition, most matchday services are strengthened with extra carriages, although when matches occur midweek, there isn't always enough stock to strengthen all services. The strengthening of these services has caused the platforms at Falmer to be extended to 8 car to accommodate these longer trains.
A queuing system is in operation in both directions after full-time at the stadium.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Moulsecoomb | Southern East Coastway Line |
Lewes |
References
- ↑ Mitchell, Vic and Smith, Keith (1985). South Coast Railways - Brighton to Eastbourne., plate 42. Middleton Press, Midhurst. ISBN 0-906520-16-9
External links
- Train times and station information for Falmer railway station from National Rail
Coordinates: 50°51′43″N 0°05′14″W / 50.86194°N 0.08722°W