Makassar-class landing platform dock

Makassar class
Class overview
Name: Makassar
Builders:
  • DaeSun Shipbuilding (Busan, Rep.of Korea)
  • PT PAL (Surabaya, Indonesia)
  • SIMA (Callao, Peru)
Operators:
Preceded by: Tanjung Dalpele
Cost: USD$37.5 million ~ USD$45 million
Building: 2
Planned: 2
Completed: 4
Active: 4
General characteristics
Type: Landing Platform Dock
Tonnage:
  • 8400 tons
  • 10300 tons (for Philippine version)[1]
Displacement:
  • 7,300 tons standard displacement
  • 11,394 tons full displacement
Length:
  • 122 meters ~ 125 meters (for Indonesian version)
  • 122 meters (for Peruvian version)[2]
  • 123 meters (for Philippine version)
Beam:
  • 22 meters
  • 21.8 meters (for Philippine version)
Height: 56 meters
Draft:
  • 4.9 meters
  • 5 meters (for Philippine version)[1]
Decks: (Tank Deck); 6.7 meter,(Truck Deck); 11.3 meter
Propulsion:
  • CODAD, 2 shafts
  • 2 × MAN B&W 8L28/32A diesel rated at 2666 BHP/1960 kW@ 775 RPM
Speed:
  • Maximum: 16 knots
  • Cruising: 14 knots
  • Economy: 12 knots
Range: 30 days, up to 10,000 Nm
Endurance: +45 days
Boats & landing
craft carried:
2 x LCVP
Capacity: up to 40 infantry vehicles
Troops: 218 troops
Complement: accommodations up to 518 persons
Crew: 126 crew
Time to activate: 3
Armament:

'A' position 1 x Bofors 40mm SAK40/L70 'B' position: 2 x 20mm Oerlikon

'B' position: 2 x Mistral Simbad
Aircraft carried: Up to 5 helicopters Military transport aircraft
Aviation facilities: 2 spot helideck Mil Mi-17

The Makassar class is a class of 4 Landing Platform Docks designed for the Indonesian Navy by Daesun Shipbuilding & Engineering Co. of South Korea and based on the earlier Tanjung Dalpele class. The US$150 million contract was signed in December 2004[3] and the first two units were built in Busan, South Korea. The remaining two were built at Indonesia's PT PAL shipyard in Surabaya with assistance from Daesun.

The contract for the 3rd and 4th LPD to be built in Indonesia was signed with PT PAL on March 28, 2005. On 19 October 2006, the first of the two Indonesian-built units, was laid down in a ceremony by Admiral Slamet Subiyanto, Chief of Staff, Indonesian Navy.[4] The 3rd and 4th units had been designed to function as flagships with provisions for a command and control system, 57mm gun and air defense systems.

Exports

Besides Indonesia, the class of ship is being built for two other foreign customers:

The Peruvian Navy selected the Makassar class for the Buque Multipropósito program from Dae Sun Shipbuilding and Engineering Co. in 2012.[5] First ship of the class was laid down in the SIMA Callao shipyard on July 13, 2013;[6] A second unit is also planned.

The Philippine Navy selected a variant of the Makassar class design from PT PAL, called the Tarlac-class for its Strategic Sealift Vessel (SSV) programme following competitive bidding in 2013, and the contract for two units was signed on 23 January 2014.[7] The first unit was laid down at Surabaya on 22 January 2015.[1]

Ships of class

Name Pennant Country Laid Down Launched Commissioned
KRI Makassar 590 Indonesia Indonesia 07-Dec-2006 29-Apr-2007
KRI Surabaya 591 Indonesia Indonesia 07-Dec-2006 23-Mar-2007 01-Aug-2007
KRI Banjarmasin 592 Indonesia Indonesia 19-Oct-2006 28-Aug-2008[8] 28-Nov-2009[9]
KRI Banda Aceh 593 Indonesia Indonesia 07-Dec-2007 19-Mar-2010[10] 21-Mar-2011
BAP Paita -- Peru Peru 12-Jul-2013[6] 2016 (projected)
BAP Pisco -- Peru Peru planned 2017 (projected)
BRP Tarlac 601 Philippines Philippines 22-Jan-2015 18-Jan-2016 01-Jun-2016
BRP Davao Del Sur 602 Philippines Philippines 5-Jun-2015 26-Sep-2016 2017 (projected)

References

Wikimedia Commons has media related to Makassar-class landing platform dock.


This article is issued from Wikipedia - version of the 11/29/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.