Kolkata Metro Line 7
Kolkata Metro Line 7 | |
---|---|
Overview | |
Type | Rapid transit |
System | Kolkata Metro |
Status | Planned |
Locale | Kolkata India |
Termini |
Joka (south) Baranagar (north) |
Stations | 23 |
Daily ridership | 500000 (projected) |
Website | KMRC |
Operation | |
Operator(s) | KMRC |
Character |
|
Depot(s) | Joka |
Technical | |
Line length | 38.10 kilometres (23.67 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | 750 V DC[1] using third rail |
Operating speed | 80 km/h (designed) |
Stations
The proposed stations are as follows :
Line 7 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Location | Opening | Connections | Layout | Coordinates | Notes | |||
English | Bengali | Hindi | ||||||||
1 | Swami Vivekananda | স্বামী বিবেকানন্দ | Baranagar | Under construction | Kolkata Metro Line 1 Kolkata Metro Line 5 Baranagar Road Railway Station | Elevated | Also known as Baranagar | |||
2 | Palpara | পালপাড়া | Palpara | Planned | Underground | |||||
3 | Sinthi | সিঁথি | Sinthee | Planned | Underground | |||||
4 | Cossipore | কাশীপুর | Cossipore | Planned | Underground | |||||
5 | Paikpara | পাইকপাড়া | Paikpara | Planned | Underground | |||||
6 | Shyambazar | শ্যামবাজার | Shyambazar | 15 February 1995 | Kolkata Metro Line 1 | Underground | ||||
7 | Khanna | খান্না | Khanna | Planned | Underground | |||||
8 | Maniktala | মানিকতলা | Maniktala | Planned | Underground | |||||
9 | Rajabazar | রাজাবাজার | Rajabazar, Kolkata | Planned | Underground | |||||
10 | Sealdah | শিয়ালদহ | Sealdah | Under construction | Kolkata Metro Line 2 | Underground | ||||
11 | Entally | এন্টালী) | Entally | Planned | Underground | |||||
12 | Nonapukur | নোনাপুকুর | Nonapukur | Planned | Underground | |||||
13 | Mullick Bazar | মল্লিক বাজার | Mullick Bazar | Planned | Underground | |||||
14 | Park Circus | পার্ক সার্কাস | Park Circus | Planned | Underground | |||||
15 | Ballygunge | বালিগঞ্জ | Ballygunge | Planned | Underground | |||||
16 | Rashbehari Avenue | রাসবেহারী এভেনিউ | Rashbehari Avenue | Planned | Underground | |||||
17 | Lake Gardens | লেক গার্ডেনস | Lake Gardens | Planned | Underground | |||||
18 | New Alipore | নিউ আলিপুর | New Alipore | Planned | Underground | |||||
19 | Majerhat | মাঝেরহাট | Majerhat | Under construction | Kolkata Metro Line 3 | Elevated | ||||
20 | Kavi Sukanta | কবি সুকান্ত | Kalikapur | Under construction | Elevated | Also known as Kalikapur | ||||
21 | Jyotindra Nath Nandi | যতীন্দ্র নাথ নন্দী | Mukundapur | Under construction | Elevated | Also known as Mukundapur | ||||
22 | Satyajit Ray | সত্যজিৎ রায় | Bagha Jatin/Peerless Hospital | Under construction | Elevated | Also known as Bagha Jatin | ||||
23 | Kavi Subhash | কবি সুভাষ | New Garia | 7 October 2010 | Kolkata Metro Line 1 and New Garia Railway station (Eastern Suburban Railways) | At Grade | Also known as New Garia | |||
See also
- Kolkata Metro
- List of Kolkata metro stations
- Kolkata Metro Rolling Stock
- List of rapid transit systems
- Kolkata tram
- Kolkata Lightrail
- Kolkata Monorail
- Kolkata Suburban Railway
References
External links
This article is issued from Wikipedia - version of the 12/3/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.