Line 18, Chengdu Metro
Line 18, Chengdu Metro | |
---|---|
Overview | |
Type | Rapid transit |
System | Chengdu Metro |
Status | Under constrution |
Locale | Chengdu, China |
Termini |
Chengdu South Railway Station Chengdu Tianfu International Airport |
Stations | 14 |
Services | 1 |
Operation | |
Planned opening | Mid 2020 |
Owner | City of Chengdu |
Operator(s) | Chengdu Metro Corporation |
Character | Underground and Elevated |
Technical | |
Line length | 59.27 km (36.83 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Line 18 of the Chengdu Metro (Chinese: 成都地铁18号线; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) or New Airport Express Line (Chinese: 新机场快线; pinyin: Xīn Jīchǎng Kuàixiàn) runs from Gaoxin District to Jianyang City. It starts at Chengdu South Railway Station and ends at Chengdu Tianfu International Airport. The total length is 59.27 km. Line 18's color is teal. New Airport Express Line began constrution on late 2015, ends on mid 2020.[1] from Chengdu South Railway Station to Chengdu Tianfu International Airport.
New Airport Express Line Stations
- Chengdu South Railway Station (Transfer or consturationed )
- Jincheng Square (Transfer )
- Century City (Transfer )
- Muhua Road (Consturationed transfer )
- Fuzhou Road (Consturationed transfer or not consturationed Line 11or Planned Meishan Line)
- Xinling Lake (Consturationed transfer )
- Tianfu New Railway Station (Consturationed transfer or planned Line 19)
- Huonan
- Huanqiou
- Shancha Lake
- Chengdu Tianfu International Airport (Planned Transfer Line 14Line 16Line 19orLine 20)
See also
References
- ↑ "成都轨道交通18号线一期设计时速140公里 连接新机场" [Chengdu Rail Transit Line 18 Phase 1 design tempo 140km/h Content New Airport] (in Chinese). Netease Nowe. 7 June 2016. Retrieved 2016-07-04.
This article is issued from Wikipedia - version of the 10/17/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.