Line 4, Changchun Rail Transit

Line 4, Changchun Rail Transit

Chechang Station
Overview
Type Rapid transit
System Changchun Rail Transit
Status Operational
Locale Changchun, Jilin, China
Termini Northern Stop of Changchun Railway Station
Chechang
Services 1
Operation
Opened 30 June 2011
Owner Shenyang
Operator(s) Changchun Rail Transit Corporation
Character Elevated and Underground
Technical
Line length 16.3 km (10.13 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 4 of the Changchun Rail Transit (Chinese: 长春轻轨四号线; pinyin: Chángchūn Qīngguǐ Sì Hào Xiàn) a rapid transit line running from north to south Changchun. It was opened on 30 June 2011. It is currently 16.3 km long with 16 stations.[1]

Stations

Station Name
English
Station Name
Hanzi
Transfer
Location
Northern Stop of Changchun Railway Station 长春站北站 Changchun Railway Station Kuancheng
Beiyataidajie 北亚泰大街
Weihuanggong 伪皇宫
Dongdaqiao 东大桥 Nanguan
Dongxinlu 东新路 Erdao
Jilindalu 吉林大路
Gongpinglu 公平路
Ziyoudalu 自由大路
Pudonglu 浦东路
Dongnanhudalu 东南湖大路
Beihailu 北海路
Weixinglu 卫星路  3  (Linhejie) - adjacent station
Shironglu 世荣路 Nanguan
Nansanhuan 南三环
Nanxihuan 南四环
Chechang 车场

See also

References

  1. "长春轻轨4号线 9月末或10月初开始售票运行". 中国吉林网. Retrieved 2012-10-04.
This article is issued from Wikipedia - version of the 10/17/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.