List of Marseille Metro stations

Marseille Metro system map.
The following is the list of the current 28 stations[1] on the Marseille Metro system in Marseille, France.
List of Marseille Metro Stations
Line 1
Chartreux Metro station
- La Fourragère
- St Barnabé
- Louis Armand
- La Blancarde (transfer with SNCF and Marseille tramway)
- La Timone
- Baille
- Castellane (transfer with Line 2)
- Estrangin - Préfecture
- Vieux-Port - Hôtel de ville
- Colbert - Hôtel de région
- St Charles (main SNCF station, transfer with Line 2)
- Réformés Canebière (transfer with Marseille tramway)
- Cinq avenues Longchamp
- Chartreux
- St Just - Hôtel de département
- Frais Vallon
- La Rose
Line 2
- Bougainville
- National
- Désirée Clary
- Joliette (transfer with Marseille tramway)
- Jules Guesde
- St Charles (main SNCF station, transfer with Line 1)
- Noailles (transfer with Marseille tramway)
- Notre Dame du Mont - Cours Julien
- Castellane (transfer with Line 1)
- Périer
- Rond point du Prado
- Sainte-Marguerite Dromel
A 0.9 km extension of Line 2 north of Bougainville, to a new (terminus) station at Capitaine Geze, is projected to open in 2015.[1]
See also
References
External links
- Official web site of the RTM , " régie des transports de Marseille "
This article is issued from Wikipedia - version of the 2/5/2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.