MV Samish

Samish arriving in Anacortes in spring 2016.
History
Name: MV Samish
Owner: Washington State Department of Transportation
Operator: Washington State Ferries
Port of registry: Seattle, Washington, United States
Route: Anacortes/San Juan Islands
Ordered: Spring 2012
Builder: Vigor Industrial, Seattle, Washington
Cost: $126.45 million (approximate)[1]
Laid down: March 8, 2013
Christened: May 20, 2015
Completed: April 10, 2015
Maiden voyage: June 14, 2015
In service: June 14, 2015
Status: Operational
General characteristics
Class and type: Olympic-class auto/passenger ferry
Displacement: 4320 long tons at design load waterline
Length: 362 ft 3 in (110.4 m)
Beam: 83 ft 2 in (25.3 m)
Draft: 16 ft 6 in (5.0 m)
Depth: 24 ft 6 in (7.5 m)
Decks:
  • 2 vehicle
  • 2 passenger (1 Passenger Cabin, 1 Sun Deck)
  • 1 crew
Deck clearance: 15 ft 6 in (4.7 m)
Installed power: Total 6,000 hp (4,500 kW) from 2 x EMD 12-710G7C Diesel Engines
Speed: 17-knot (31 km/h)
Capacity:
  • 1500 passengers
  • 144 vehicles
Crew: 14 (12 with Sun Deck closed)
Notes: All specifications are subject to change. Vessels in design and construction phase.[2]
Samish parked at Colman Dock in Downtown Seattle shortly after she was accepted by Washington State Ferries in April 2015.
The M/V Samish rounds Lopez Island, heading for Anacortes from Friday Harbor. Taken from the M/V Hyak.

The MV Samish is the second vessel of the Olympic-class auto ferries built by Vigor Industrial for the Washington State Ferries system.[3]

Funding for a second Olympic-class was authorized in the spring 2012 session of the Washington State Legislature and the keel laying and first weld took place on March 8, 2013.

The name Samish was decided by the Washington State Transportation Commission on November 13, 2012 (the same day of the naming of the MV Tokitae) after a public outreach process. The vessel is named after a the Samish Indian Nation, a Coast Salish tribe whose name means “giving people”.[4]

On December 21, 2013, the ship's superstructure was rolled out from Nichols Brothers Boat Builders and sent to Seattle on December 23 to be joined with the superstructure already under construction.

The Samish was accepted by Washington State Ferries on April 10, 2015 and was officially christened on May 20 in Anacortes. The ship underwent two months of sea trials and crew training before entering service on the Anacortes/San Juan Islands route at the start of the Summer 2015 sailing season on June 14.[5] The vessel replaced the M/V Hyak.

The Samish was pulled from service on February 21, 2016, after the discovery of a quarter-sized hole in the hull below the water line, later found during a drydock inspection to be linked to corrosion. The ferry was expected to re-enter service by March 10 after some minor patchwork.[6][7]

The Samish has a sun deck, open during the summer season only.

References

  1. Washington State Department of Transportation. "Ferries - Olympic Class (144-Car) Ferries". Retrieved 21 September 2014. Samish, the second 144-car ferry: The total cost of the vessel is approximately $126.45 million.
  2. 144 Auto Ferry Plans
  3. "WSDOT - Project - Ferries - Olympic Class (144-Car) Ferries".
  4. Staff report (15 November 2012). "New state ferry named after Samish tribe". Goskagit.com.
  5. "Welcome aboard, Samish! New Olympic Class ferry joins WSF fleet". Washington State Ferries. 10 April 2015. Retrieved 13 April 2015.
  6. Friedrich, Ed (February 25, 2016). "State's newest ferry has a hole in it". Kitsap Sun. Retrieved February 25, 2016.
  7. Lindblom, Mike (February 26, 2016). "New ferry Samish out of service after hole found in hull". The Seattle Times. Retrieved February 26, 2016.
This article is issued from Wikipedia - version of the 9/10/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.