MacArthur Causeway
MacArthur Causeway County Causeway | |
---|---|
The entirety of the causeway, connecting Downtown and South Beach | |
Carries |
6 lanes of SR 836 / US 41 / SR A1A |
Crosses | Biscayne Bay |
Locale | Miami to Miami Beach |
Official name | General Douglas MacArthur Causeway |
Maintained by | FDOT |
Characteristics | |
Design | Causeway, beam |
Material | Slabs, girders, fill |
Total length | 3.5 miles (5.6 km) |
Longest span | 0.4 miles (0.64 km) |
Clearance above | 68 feet (21 m) |
History | |
Designer | Frederic R. Harris, Inc., American Bridge Company |
Opened | February 17, 1920[1] |
The General Douglas MacArthur Causeway is a six-lane causeway which connects Downtown, Miami, Florida and South Beach, Miami Beach via Biscayne Bay.
The highway is the singular roadway connecting the mainland and beaches to Watson Island and the bay neighborhoods of Palm Island, Hibiscus Island, and Star Island. The MacArthur Causeway carries State Road 836 and State Road A1A over the Biscayne Bay. Interstate 395 ends at Fountain Street, the entrance to Palm Island Park which has a traffic light as well as bus stops.
History
In the late 1910s, with the deteriorating wooden Collins Bridge (now, the Venetian Causeway) as the only direct land route between mainland Miami and the barrier islands of Miami Beach, construction on the roadway began in 1917. The roadway, dedicated as the County Causeway, was completed in 1920. Watson Island was reclaimed surrounding the western end of the roadway, completed in 1926.
Having undergone several lane and structural expansions following opening of the original two-lane road, the State Road Board and Dade County Commission voted to rename the causeway in honor of World War II General Douglas MacArthur in 1942.[2] The causeway was accessible from mainland Miami via Biscayne Boulevard and intersecting side streets through the 1990s, when replacement of the western- and easternmost spans and construction of direct highway access to I-395 began. The eastbound lanes of the bridges were completed in 1995, and westbound lanes finished in 1997.
Gallery
- Large portion of the causeway. Fisher Island and Port of Miami are in the background. Watson Island is in the foreground.
- MacArthur Causeway eastbound from Miami to Miami Beach (in far background).
- Macarthur Causeway at night as seen from Watson Island
Wikimedia Commons has media related to MacArthur Causeway. |
Wikinews has related news: Miami police shoot, kill naked man chewing face of male victim |
References
- ↑ Lavender, Abraham (2002). Miami Beach in 1920. Mount Pleasant, SC: Arcadia Publishing. p. 160. ISBN 0-7385-2351-8.
- ↑ "Causeway Our Thanks for Bataan". The Miami News. April 6, 1964. p. 1A. Retrieved October 20, 2010.
External links
- MacArthur Causeway at Structurae, 2006
Coordinates: 25°46′39.76″N 80°9′51.24″W / 25.7777111°N 80.1642333°W