Mut Wind Farm
Mut Wind Farm | |
---|---|
Location of Mut Wind Farm in Turkey | |
Official name | Mut Rüzgâr Enerji Santrali |
Country | Turkey |
Location | Mt. Magras, Mut, Mersin Province |
Coordinates | 36°44′N 33°15′E / 36.733°N 33.250°ECoordinates: 36°44′N 33°15′E / 36.733°N 33.250°E |
Status | operational |
Commission date | 2010 |
Construction cost | US$50 million |
Wind farm | |
Type | onshore |
Avg. site elevation | 1,370 m (4,495 ft) |
Hub height | 80 m (262 ft) |
Rotor diameter | 90 m (295 ft) |
Power generation | |
Units operational | 11 |
Nameplate capacity | 11 x 3 MW |
Average generation | 100 million MWh |
The Mut Wind Farm (Turkish: Mut Rüzgâr Enerji Santrali) is a wind power plant consisting of eleven wind turbines situated on Mt. Magras at Özlü village in Mut district of Mersin Province in southern Turkey. The wind farm went into service in 2010 .[1]
Geography
The farm is constructed on Mount Magras, a part of Toros Mountains range to the north of Mut district in Mersin Province. Mount Magras is actually the top of a 1,370 m (4,490 ft) canyon to the south of Göksu River valley and the town of Göksu. The wind turbines are erected just to the northeast of the village Özlü and the farm is sometimes called the Özlü Wind Farm.
Technical details
There are eleven turbines each 80 m (260 ft) high with rotor diameter of 90 m (300 ft). Maximum power output of each turbine is 3 MW and the total annual energy production is about 100 MWh.[2] The energy is fed to Gezende Dam situated about 25 km (16 mi) southwest of Mut wind farm.
Project
The US$50 million project was carried out by Ağaoğlu Energy Group, and it is further planned to increase the number of turbines to 40.
See also
References
- ↑ "Ağaoğlu, rüzgarı neden satıyor?" (in Turkish). Patronlar Dünyası. 2012-04-03. Retrieved 2012-06-24.
- ↑ Interview from Mut page (Turkish)