Nengo Bridge Hydroelectric Power Station

Nengo Bridge Hydroelectric Power Station
Map of Uganda showing the location of
Nengo Bridge
Country Uganda
Location Nengo Bridge, Rukungiri District
Coordinates 00°48′54″S 29°50′00″E / 0.81500°S 29.83333°E / -0.81500; 29.83333Coordinates: 00°48′54″S 29°50′00″E / 0.81500°S 29.83333°E / -0.81500; 29.83333
Status Proposed
Owner(s) Jacobsen Elekro
Dam and spillways
Impounds Mirera River
Reservoir
Normal elevation 1,150 m (3,770 ft)
Power station
Commission date 2017 (Expected)
Type Run-of-the-river
Installed capacity 6.7 MW (9,000 hp)

Nengo Bridge Hydroelectric Power Station, often referred to as Nengo Bridge Power Station is a planned 6.7 megawatts (9,000 hp) mini-hydroelectric power station in Uganda, the third-largest economy in the East African Community.

Location

The power station is located across the Mirera River between Rukungiri District and Kanungu District at the location of Nengo Bridge, along the road between Rukungiri and Kanungu.[1] This location lies approximately 13 kilometres (8.1 mi), by road, southwest of Rukungiri.[2]

Overview

Nengo Bridge Power Station is run of the river, mini-hydropower installation, with planned capacity of 6.7 MW.[3] Jacobsen Elektro, a Norwegian power development company, through its Ugandan subsidiary, Jacobsen Elektro Uganda Limited, owns the development rights to the power station.[4] Jacobsen Elektro also owns the 50-Megawatt Namanve Thermal Power Station in Mukono District, which they developed in 2008.[5]

Construction costs

As of October 2014, the exact construction budget for the power plant and the high-tension power lines that will evacuate the generated electricity to where it will be integrated into the national grid is not publicly known. As a comparison, Kanungu Power Station with capacity of 6.6 megawatts (8,900 hp), was developed by a different company between 2008 and 2011 at a total cost of US$14 million.[6] Kanungu Power Station in the town of Kanungu, lies about 13 kilometres (8.1 mi), by road, southwest of Nengo Bridge.

Construction time table

The power station is one of the nine renewable energy projects in Uganda that were awarded production licenses in October 2014 by the Electricity Regulatory Authority (ERA). Construction is expected to start in December 2014, and last approximately two years.[7]

See also

References

  1. Kushaba, Anthony (14 May 2012). "Kanungu District Cut Off As Nengo Bridge Collapses". Uganda Radio Network (URN). Retrieved 23 October 2014.
  2. "Map Showing Rukungiri And Kanungu With Distance Marker". Globefeed.com. Retrieved 23 October 2014.
  3. Wesonga, Nelson (17 December 2012). "64MW To Boost Power Grid, Avert Shortage". Daily Monitor (Kampala). Retrieved 23 October 2014.
  4. Kasita, Ibrahim (25 November 2013). "Eight Firms To Benefit From US$58 Million Renewable Energy Deal". New Vision (Kampala). Retrieved 23 October 2014.
  5. JEC (5 November 2008). "Namanve 50MW Thermal Power Plant, Uganda". Jacobsen-Elektro.Com (JEC). Retrieved 23 October 2014.
  6. Rumanzi, Perez (22 November 2011). "Kanungu Mini-Hydro Dam Starts Work Today Amid Power Outages". Daily Monitor (Kampala). Retrieved 23 October 2014.
  7. Sanya, Samuel (22 October 2014). "ERA Licenses 9 Renewable Energy Projects". New Vision (Kampala). Retrieved 23 October 2014.
This article is issued from Wikipedia - version of the 2/16/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.