New Cut, Bristol

New Cut, Bristol
River
The river Avon, in the New Cut, looking west towards Southville and St Pauls church, Bedminster.
Country England
State Bristol
Tributaries
 - left River Malago
Source River Avon
 - location Netham Weir, Bristol, England
 - elevation 27 ft (8 m)
 - coordinates 51°27′06″N 2°33′09″W / 51.45167°N 2.55250°W / 51.45167; -2.55250
Mouth River Avon
 - location Rownham, Bristol, England
 - elevation 9 ft (3 m)
 - coordinates 51°26′53″N 2°37′30″W / 51.44806°N 2.62500°W / 51.44806; -2.62500Coordinates: 51°26′53″N 2°37′30″W / 51.44806°N 2.62500°W / 51.44806; -2.62500
Length 3.2 mi (5 km)

The New Cut is an artificial waterway which was constructed between 1804 and 1809 to divert the tidal river Avon through south and east Bristol, England. This was part of the process of constructing Bristol's Floating Harbour, under the supervision of engineer William Jessop. The cut runs from Totterdown Basin at the eastern end of St Phillip's Marsh, near Temple Meads, to the Underfall sluices at Rownham in Hotwells and rejoining the original course of the tidal Avon.

The length of the cut is approximately 1.8 miles (2.9 km) and with the addition of short sections of the original course of the river Avon at either end, connecting Netham weir and Totterdown basin, and the Underfall sluices to the mouth of the Entrance lock at Cumberland Basin, the overall watercourse length is 3.2 miles (5.1 km). No ships have navigated the cut on a regular basis since the 1930s, but it is still possible for boats to proceed as far as Netham weir with care.

Construction

One of Jessop's 1802 plans (not adopted) for the New Cut, as a shorter addition south of the western portion of the original harbour
The New Cut at low tide, seen from Gaol Ferry Bridge.

The Bristol Docks Company was formed to construct the Floating Harbour following the passage of an Act of Parliament in 1803, sponsored by the City Corporation and the Merchant Venturers. The engineer William Jessop had originally proposed a smaller scheme, which would have involved a shorter cut from Prince Street, near the city centre, to Rownham. However this would have meant that ship owners could have avoided using the new Floating Harbour and the scheme was amended to include a greater area of the river Avon, thus necessitating the longer cut which is in existence today.[1]

Work commenced on the construction on 1 May 1804 at 5am at a ceremony conducted by the directors of the Bristol Docks Company.[1] Excavation was made through the predominant Redcliffe Sandstone, a Triassic rock that can be seen in cuttings all along the New Cut.[2] It has been proposed that the labour force included French prisoners of war, but there is apparently no evidence confirming this.[3][4]

A report to the company stated that in the first year of excavation 780,625 cubic yards (596,831 m3) of earth and rock had been removed at a cost of £120,138 12s. 1d.[5] The initial estimates of £300,000 for the whole docks scheme proved insufficient and further acts had to be passed to raise the capital to £600,000. The Avon was diverted into the New Cut in January 1809 and on 2 April the first ships passed up the cut and entered the harbour at the Bathurst Basin.[6]

On 1 May 1809 the docks project was certified as complete and a celebratory dinner was held on Spike Island for a thousand of the navvies, navigational engineers who had worked on the construction, at which "two oxen, roasted whole, a proportionate weight of potatoes, and six hundredweight of plum pudding" were consumed, along with a gallon of strong beer for each man. When the beer ran out a mass brawl between English and Irish labourers turned into a riot which had to be suppressed by the press gang.[6]

New Cut, Bristol

Legend
River Avon
Clifton Suspension Bridge
Colliter's Brook
Entrance Lock
A370 road Plimsoll Bridge
Cumberland Basin
Ashton Avenue Bridge
Stop Gate
Merchant's Road Bridge
Underfall sluices
Floating Harbour
Vauxhall Bridge
Gaolferry Bridge
River Malago
Bathurst Basin lock (disused)
Commercial Road Bridge
A38 road Bedminster Bridge
Langton Street Bridge
A4 road Bath Road Bridge
Great Western Main Line
Totterdown lock (disused)
Albert Road Bridge No1
Marsh Junction Railway Bridge
Albert Road Bridge No2
St Phillips Causeway
Feeder Canal
Netham Weir
St Annes Bridge
Netham Lock
River Avon

As originally envisaged, the New Cut was navigable as far as the Totterdown basin, where barges could enter the Feeder Canal and proceed up river from Netham lock to Bath, Somerset. Totterdown lock was in-filled and decommissioned during World War II as the authorities were worried that bombs falling on the lock would cause all of the water in the harbour to drain out.[7] The lock providing entrance to the Bathurst Basin, and thus to the Floating Harbour, was also filled in during World War II.[8]

Packet boats operated regular services to Cardiff and Swansea from the Bathurst Basin until the 1930s, so the two bridges built across the cut below this point, the Vauxhall Bridge (pedestrian) and Ashton Swing Bridge (road and rail),[9] were originally swing bridges to allow for the passage of the steamers, but are now fixed.[10] Shipyards sprang up on the New Cut in the 19th century. Acraman's had a yard built in St Philip's Marsh near the Feeder Canal in 1839, where they built chain-propelled floating bridges for the Gosport-Portsmouth crossing which were too wide to pass through the floating harbour. The next year Acraman's opened a second more expansive yard in Bedminster, a well equipped yard which built a number of early steam ships. The first saw occasional shipbuilding until 1874, but the second passed to John Payne Ltd in 1862 and as the Vauxhall Yard launched dozens of small vessels directly into the New Cut, until they closed in 1925.[11]

No boats have regularly navigated the New Cut since the swing bridges were closed, although there are occasional inspection trips to check the state of the bridges and during the summer of 2009 special trips were run to celebrate the 200th anniversary.[12] The cut is also regularly used by canoeists.[13] In 1992, the Bristol Development Corporation secured an Act of Parliament to construct a new weir across the New Cut downstream of the Bathurst Basin to provide a constant height of water above that point and improve the development potential of adjacent land. Although enacted, none of the powers granted were used and the weir was never built.[14]

References

  1. 1 2 Latimer (1887), pp. 13–15
  2. "Wildlife and Geology – Bristol Area". River Avon Trail. Avon Valley Partnership. Retrieved 13 August 2009.
  3. "River Avon Trail Interpretation Project Bulletin" (PDF) (Press release). Avon Valley Partnership. May 2004. Retrieved 26 November 2013.
  4. "Heritage Trails The New Cut Prince St Bridge to Cumberland Basin". bristolfloatingharbour.org.uk website. bristolfloatingharbour.org.uk. Retrieved 26 November 2013.
  5. Buchanan, R. A. (1969). "The Construction of the Floating Harbour in Bristol, 1804-9" (PDF). Transactions. The Bristol and Gloucestershire Archaeological Society. 88: 196. Retrieved 14 August 2009.
  6. 1 2 Latimer (1887), pp. 15–17
  7. "Totterdown Lock, Bristol". National Monuments Record. English Heritage. Retrieved 12 August 2009.
  8. "The New Cut 2". Bristol Floating Harbour. Retrieved 17 November 2015.
  9. "Ashton Swing Bridge". Bristol Railway Archive. Retrieved 12 August 2009.
  10. "A brief history of the Cut". Friends of the New Cut. The Southville Centre. Archived from the original on 9 October 2007. Retrieved 13 August 2009.
  11. Farr, Graeme (1977). Shipbuilding in the Port of Bristol National Maritime Museum Maritime Monographs and Reports. p15
  12. "Conferences, lectures and events of interest". Bristol Industrial Archaeological Society. Retrieved 13 August 2009.
  13. Brandon, Kayle; Bunting, Heath (2007). "The Avon Canoe Pilot" (PDF). Port City: on mobility and exchange. commissioned by Arnolfini. Retrieved 16 August 2009.
  14. "Avon Weir Act 1992 (c. v) (c. 5)". Office of Public Sector Information. Retrieved 13 August 2009.

Works cited

Wikimedia Commons has media related to New Cut.

  1. Prince's Wharf, including M Shed, Pyronaut and Mayflower adjoining Prince Street Bridge
  2. Dry docks: SS Great Britain, the Matthew
  3. St Augustine's Reach, Pero's Bridge
  4. Bathurst Basin
  5. Queen Square
  6. Bristol Temple Meads railway station
  7. Castle Park
  8. Redcliffe Quay and Redcliffe Caves
  9. Baltic Wharf marina
  10. Cumberland Basin & Brunel Locks
  11. The New Cut
  12. Netham Lock, entrance to the Feeder Canal
  13. Totterdown Basin
  14. Temple Quay
  15. The Centre
  16. Canons Marsh, including Millennium Square and At-Bristol
  17. Underfall Yard
  18. Bristol Bridge
This article is issued from Wikipedia - version of the 11/25/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.