ORP Ślązak (2015)
History | |
---|---|
Poland | |
Name: | ORP Ślązak |
Builder: | Stocznia Marynarki Wojennej |
Laid down: | 28 November 2001 |
Launched: | 2 June 2015 |
Status: | Fitting out |
General characteristics | |
Displacement: |
|
Length: | 95.2 m (312 ft) |
Beam: | 13.5 m (44 ft) |
Draught: | 3.60 m (11.8 ft) |
Propulsion: |
|
Speed: | 30 kn (56 km/h) |
Complement: | up to 97 |
Sensors and processing systems: |
|
Armament: |
|
Aircraft carried: | flight deck, no hangar |
The ORP Ślązak (pendant 241) will be an Offshore Patrol Vessel of the Polish Navy, formerly known as Gawron-class corvette. The ship is named Ślązak (Polish: Silesian). It is a licence variant of the MEKO A-100 project developed by Blohm + Voss.
Construction
In 1997 Poland was invited to join NATO and became the member state on 12 March 1999. In December 1997 representatives of the Ministry of National Defence and the Polish Navy has selected a conceptual design for future multipurpose corvettes. Inquiries were sent to four foreign shipyards from UK, USA, Germany and Sweden. The commission decided to go with German MEKO A-100 Corvette design by Blohm + Voss. The technical project was approved in 2001.[2] A final agreement with Stocznia Marynarki Wojennej (Naval Shipyard in Gdynia) was signed on 27 November 2001 for construction of one Projekt 621 (shipyard designation Gawron) corvette, a second (optional) and five consecutive (optional). At the same time the shipyard has signed a licensing agreement worth PLN 60 million for the use of the MEKO A-100 concept.[3] The keel of the first ship was laid on 28 November 2001 in the presence of Poland's Prime Minister Leszek Miller.[4]
In 2000 and 2002 Polish Navy commissioned two ex-US Navy Oliver Hazard Perry-class frigates and on 23 December 2002 financing was cut to a single corvette.[5] Unlike multirole combat aircraft acquisition financed separate of National Defence budget, the program wasn't a priority for the Armed Forces and suffered from insufficient funding. The cost was initially set at PLN 250 million per ship. In 2003 estimated total cost of a single Gawron-class corvette was estimated at PLN 850 million, in 2005 at around PLN 1.1 billion. Finally in 2012 the figures have grown to PLN 1.5 billion (EUR 360 mln).[3][6]
In 2007 a shipyard awarded Italian Avio a USD 10 million deal to provide CODAG propulsion system.[7] In 2008 the hull was at 80% completion when financial crisis broke up. In 2009 the defence budget was cut by 5 billion PLN.[8] This led to postpone the decision to order the combat systems worth PLN 824 million that was negotiated with Thales in 2008.[9] The ships planned armament included RIM-162 ESSM and RIM-116 RAM surface-to-air missiles, RBS-15 Mk 3 anti-ship missiles and MU90 Impact torpedoes.[6] On 16 September 2009 the hull already with engines, turbines, generators, line shafts and air-conditioners completed technical launching for the first time. At the same time the Ministry Of Defence decided to suspend corvette financing.[10] In April 2011 the court declared Naval Shipyard's bankruptcy.[11] On 24 February 2012 Gawron program was cancelled.[12] At that time the hull was largely completed at the cost of 402 million PLN (~US$130m), but equipping it with combat systems would have cost an additional 1 billion PLN (~US$320m).[13] On 23 September 2013 an annex to 2001 construction conctract was signed to complete the sole unit as patrol vessel.[14] Due to design changes the program codename was changed to Projekt 621M. ORP Ślązak modular design and systems allows to upgrade it to the corvette configuration in the future.[15]
In December 2013 Thales Group was selected as mission suite supplier for 100 million euro worth contract.[16] A contract with Thales for delivery of the integrated combat system for the Ślązak was signed in March 2014. The deal include TACTICOS Combat Management System, SMART-S Mk2 surveillance radar, STING-EO Mk2 fire control radar, MIRADOR electro-optical observation and fire control system and LINK 11/16 tactical data link system.[17]
On 2 July 2015 ORP Ślązak patrol vessel was christened during official launching ceremony, becoming the first new Polish-built Navy ship in 21 years,[18] since ORP Wdzydze (TRB 646) minesweeper launching in 1994. It was expected to be commissioned in November 2016,[19] however in 2016 commission was delayed until 2018.[20]
References
- Projekt 621 (typ Gawron) okretywojenne.mil.pl (Polish)
- ORP “Ślązak” Launched. defence24.com
- ↑ ORP Ślązak zwodowany i zważony - wraca do hangaru. (Polish)
- ↑ Okręt Gawron – kulisy cz I. 17 August 2012. (Polish)
- 1 2 Okręt Gawron kulisy cz. II. 17 August 2012. (Polish)
- ↑ Miało być 7 statków, będzie jeden. Być może. Śledczy badają, jak buduje się jednostkę Marynarki Wojennej. 18 November 2011. (Polish)
- ↑ To pierwszy od lat nowy okręt naszej marynarki. wyborcza.pl. (Polish)
- 1 2 ORP Slazak / Gawron / Projekt 621 (Meko A 100). globalsecurity.org
- ↑ Włoska siłownia Gawrona. 16 February 2007. (Polish)
- ↑ Projekt korwety Gawron dla PMW. (Polish)
- ↑ Zapaść wojska - biurokracja przetrwa.
- ↑ Okręt Gawron kulisy cz. III. (Polish)
- ↑ Gdynia: Ogłoszono upadłość Stoczni Marynarki Wojennej. (Polish).
- ↑ "Tusk terminates 'senseless' warship project" (in Polish).
- ↑ "Wojsko do remontu, koniec z Gawronem" (in Polish). Gazeta Wyborcza.
- ↑ PODPISANIE UMÓW NA OKRĘTY DLA MARYNARKI WOJENNEJ.
- ↑ ORP „Ślązak” zwodowany. Defence24.pl, 2 July 2015. (Polish)
- ↑ Thales uzbroi Ślązaka 13 December 2013.
- ↑ Thales to supply mission suite for Polish Patrol Vessel ORP ŚLĄZAK. March 14, 2014
- ↑ Defence Minister: We need to expand Polish Navy. 02.07.2015
- ↑ Wodowanie ORP Ślązak. 3 July 2015. (Polish)
- ↑ ORP Ślązak opóźniony o dwa lata. Budowa trwa już 15 lat!. (Polish)