Oberhausen–Duisburg-Ruhrort railway
Oberhausen–Duisburg-Ruhrort | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route number: | 447 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length: | 9 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge: | 1435 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum speed: | 100 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Legend
|
The Oberhausen–Duisburg-Ruhrort railway is a line in the German state of North Rhine-Westphalia. It runs from Oberhausen via Duisburg-Meiderich to Duisburg-Ruhrort.
The line is now classified as a main line, although it is not electrified and west of Duisburg-Meiderich Sud station it is entirely single-track.
History
The Cologne-Minden Railway Company (Cöln-Mindener Eisenbahn-Gesellschaft, CME) opened the first railway in the Ruhr with the completion of its trunk line in 1847. This allowed coal mined in the Ruhr to be brought to consumers in the Lower Rhine. It entered into a contract with the Ruhrort-Crefeld District Gladbach Railway Company (Ruhrort–Crefeld−Kreis Gladbach Eisenbahngesellschaft, RCG) to vuild a line to Ruhrort and to establish a train ferry between Ruhrort and Homberg. The RCG agreed to build a line from Homberg to Mönchengladbach. The CME opened its branch line from Oberhausen Station via Meiderich to Ruhrort on 14 October 1848. Under the contract the train ferry was to become operational within four years of the completion of the line.
Development
After the Bergisch-Märkische Railway Company (Bergisch-Märkische Eisenbahn-Gesellschaft, BME) took over the RCG, together with the Aachen-Neuß-Düsseldorf Railway Company (Aachen-Neuß-Düsseldorfer Eisenbahngesellschaft) of the Royal Directorate of the Aachen-Düsseldorf-Ruhrort Railway Company (Königliche Direction der Aachen-Düsseldorf-Ruhrorter Eisenbahn) in 1866, it built a line to Ruhrort, starting from its Mülheim-Styrum station. This meant that BME lines connected to the ferry terminals on both shores, and so the CME line to Oberhausen abruptly lost its usefulness.
After the Duisburg-Hochfeld rail bridge was opened over the Rhine on the Osterath–Dortmund Süd line, the old Ruhrort–Homberg train ferry became completely run down and the line lost its national significance; instead, it was used for the transport of goods to the steel industry and the port of Duisburg-Ruhrort.
Current situation
The railway lines built during the 19th century in areas that are now incorporated in the city of Duisburg do not reflect the current passenger traffic flows of the current population and this line has only limited usefulness for passenger transport.
In the past freight mainly ran on the line between Duisburg-Ruhrorter Hafen (harbour) freight yard and the large Oberhausen West freight yard (formerly the Oberhausen RHE station). The Duisburg-Wedau–Bottrop Süd line of the former Rhenish Railway Company (Rheinische Eisenbahn-Gesellschaft, RHE) connected the two freight yards. Today the harbour yard is only connected to the east to the Duisburg-Wedau–Bottrop Süd line.
Rail service
The Regionalbahn service RB 36 (Ruhrort-Bahn) was, until recently, operated by the Prignitzer Eisenbahn (PEG), owned by Arriva. The travel time for the whole line is twelve minutes. There are connections to other trains at Oberhausen Hauptbahnhof.
The PEG trains are operated with Bombardier Talent diesel multiple units (class 643.2) on one track, with an average speed is 45 km / h. The Ruhrort line runs on weekdays at 30-minute intervals and at weekends at 60-minute intervals. The Ruhrort line is part of the network of the Verkehrsverbund Rhein-Ruhr (Rhine-Ruhr Public Transport Association).
In December 2010, the line was taken over by NordWestBahn.[1]
External links
- Description of line 2274 in the NRW railway archive of André Joost
References
- ↑ "Railway Gazette: News in Brief". Retrieved 2011-01-02.