Pantex Plant

Pantex Plant

The Pantex Plant is the primary United States nuclear weapons assembly and disassembly facility and maintains the safety, security and reliability of the nation’s nuclear weapons stockpile.[1] The facility is located on a 16,000 acre (65 km2) site 17 miles (27 km) northeast of Amarillo, in Carson County, Texas in the Panhandle of Texas. The plant is managed and operated for the United States Department of Energy by Consolidated Nuclear Security and Sandia National Laboratories. Consolidated Nuclear Security, LLC (CNS) is composed of member companies Bechtel National, Inc., Lockheed Martin Services, Inc., Orbital ATK, Inc, and SOC LLC, with Booz Allen Hamilton, Inc. as a teaming subcontractor.[2] CNS also operates the Y-12 National Security Complex.[2]

As a major national security site, the plant and its grounds are strictly controlled and off-limits to all civilians, and the airspace above and around the plant is prohibited to civilian air traffic by the FAA as Prohibited Area P-47.

History

Conventional weapons being assembled at Pantex in 1944
Bunkers at Pantex used for temporary staging of nuclear weapons.

The Pantex Plant was originally constructed as a conventional bomb plant for the United States Army during the early days of World War II. The Pantex Ordnance Plant was authorized February 24, 1942. Construction was completed on November 15, 1942 and workers from all over the U.S. flocked to Amarillo for jobs.

Pantex was abruptly deactivated when the war ended and remained vacant until 1949, when Texas Technological College in Lubbock (now Texas Tech University) purchased the site for $1.[3] Texas Tech used the land for experimental cattle-feeding operations.

In 1951, at the request of the Atomic Energy Commission (now the National Nuclear Security Administration (NNSA)), the Army exercised a recapture clause in the sale contract and reclaimed the main plant and 10,000 acres (40 km2) of surrounding land for use as a nuclear weapons production facility. The Atomic Energy Commission refurbished and expanded the plant at a cost of $25 million. The remaining 6,000 acres (24 km2) of the original site were leased from Texas Tech in 1989.

The Pantex Plant was operated by Procter & Gamble from 1951 to 1956, Mason & Hanger from 1956 to 2001, and Babcock & Wilcox from 2001 to 2014.[4]

The plant employed about 3,600 people in 2010 and had a budget of $600 million for fiscal year 2010.[5]

Environmental Concerns

Technicians perform final assembly on a nuclear warhead

Controversy

Labor troubles

Labor troubles arose in 2007 following the implementation of stricter physical and performance requirements for armed security personnel following the September 11th attacks. The worker's union for the Pantex guards protested that the new standards were unfairly strenuous to middle-aged personnel nearing retirement.[12] In protest 500 guards walked off the job and went on strike in April 2007 and were replaced with a temporary guard force.[13] The strike ended with a negotiated settlement after 34 days. Guards also went on strike in a pay dispute in 1981, and unionized production and maintenance workers struck in 1970 and 2015. [14]

Security incidents

The plant was put on lockdown in January 2010 when a Pantex lab worker reported seeing two men wearing camouflage and carrying rifles exit a vehicle a "couple of miles" from the plant. The men were found to be employees on their day off, goose hunting on private property. No charges were filed.[15]

See also

Wikimedia Commons has media related to Pantex Plant.

Footnotes

  1. Pantex Plant Mission Retrieved November 9,2016
  2. 1 2 "About". CNS – Consolidated Nuclear Security, LLC. 2015. Retrieved 2016-07-15.
  3. 1 2 ATSDR - PHA - Pantex Plant, Amarillo, Carson County, Texas
  4. "History – About Pantex – Pantex Plant". www.pantex.com. Retrieved 2016-07-15.
  5. "Pantex Info" (PDF). Pantex Info. U.S. Department of Energy/National Nuclear Security Administration. Retrieved 26 November 2011.
  6. "Update for the Pantex Weapons Facility: Final Report (2005-124)". CDC - NIOSH Publications and Products - Mortality. June 6, 2014. Retrieved 2016-07-15.
  7. NPL Sites in Texas | National Priorities List (NPL) | US EPA Archived July 25, 2008, at the Wayback Machine.
  8. "US Superfund Information". US Superfund Information. Environmental Protection Agency. Retrieved 26 November 2011.
  9. EPA report on Pantex
  10. Nesmith, Jeff (December 15, 2006). "Watchdog: Firm nearly detonated nuke bomb". Arizona Daily Star. Retrieved October 5, 2011.
  11. The Peace Farm Retrieved November 9, 2016
  12. Fit to Guard Weapons?. US News and World Report. April 30, 2007.
  13. "Guards Go on Strike at Nuclear Weapons Plant". Washington Post. Retrieved August 27, 2016.
  14. "Negotiations paused as Pantex strike continues". Washington Post. Retrieved August 27, 2016.
  15. Texas Nuclear Weapons Plant On Lockdown

 This article incorporates public domain material from the Centers for Disease Control and Prevention document "Pantex Plant".

Coordinates: 35°18′42″N 101°33′35″W / 35.311568°N 101.559725°W / 35.311568; -101.559725

This article is issued from Wikipedia - version of the 11/13/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.