Satara-Akluj-Latur Highway
Satara-Akluj-Latur Highway | |
---|---|
Route information | |
Maintained by MSRDC | |
Length: | 321 km (199 mi) |
Major junctions | |
From: | Satara |
To: | Latur |
Location | |
States: | Maharashtra |
Major cities: | Satara, Mhaswad, Akluj, Latur |
Highway system | |
Satara–Akluj-Latur Highway is a Maharashtra National Highway, as its area lies in the state of Maharashtra only, but built on the National Highway basis. This is a part of the Marathwada Integrated Road Development Project launched by the Govt. of Maharashtra by the former Hon. Chief Minister Mr. Devendra Fadanvis.
Development
Express Highway, based on the govt approval and the formal announcement by state govt authorities, this highway is a project connecting two major cities Satara & Latur in Maharashtra to the NH 52 via the same link-route and in less time than the SH 77. Though said so, ironically, if developed with 4 lane basis, as declared earlier by the State Public Works Dept., this highway can save more than 1.5 hrs of time between Latur and Mumbai.
Though approved on 18 Nov 2015,[1] its major development would be started in early 2017 and it would be completed by the end of 2020. The Satara – Akluj sector is already started with full flow of traffic, while the Tembhurni- Yedshi- Latur sector is still under construction and expected to be completed soon (by the end of 2020). It is expected to share the major direct road traffic between these cities, including all traffic from SH 77 and SH 3.
Importance of the Project
- The length passes through backward regions of Marathwada.
- The time from Latur to Mumbai will be reduced by 1.5 hrs.
- It will reduce travel time considerably and will be cost effective.
- It connects Industrial places at Satara, Yedshi, Latur, and Additional Latur .
- It connects Tourist places such as Satara, Yedshi and Latur.
- It will boost employment through development of Industries in backward regions.
Built and Development
Though this is a state highway, it is built on the National Highway basis. A list of National Highways in India by highway number is available as is the list of State Highways in Maharashtra.
The Highway is just 10% completed throughout and the remaining work is supposed to be done by the end of 2020. Maharashtra govt is trying to operate this highway through a private party for a period of over 30 years in order to recover the cost of this highway.[2]
Major Cities Bypassed
This highway bypasses the other major cities in Maharashtra state, on SH 77 and on SH 3, though it passes through their areas. It directly connects Yedshi to Osmanabad.
Passing through Districts Areas
This Highway passes through almost 4 districts of Maharashtra,including:
Covered Regions and Area
The total length of this highway is 321 km (430 Miles),[3] from Satara to Latur, excluding the portions of SH 77 and SH 3 it covers at Nanded and Latur-Yedshi sectors respectively. This highway also covers the part portions of the Maharashtra State Highways at certain areas, which are now being rebuilt with National Highway Standards.
Major route
Its major route is as follows:
Junctions
- At Satara with NH 48 connecting Kolhapur – Belgaon
- At Tembhurni with NH 65 connecting Solapur – Hyderabad
- At Yedshi with NH 52 connecting Solapur – Aurangabad – Dhule
- From Latur to Yedshi via SH 77
- From Yedshi to Tembhurni via Maharashtra State Highway 77
- At Latur with NH 361 connecting Tuljapur – Nanded – Nagpur
- At Latur with NH 6 connecting Ambajogai – Kail – Beed – Aurangabad – Dhule – Vadodara
Trivia
References
- ↑
- ↑ https://www.msrdc.org/site/upload/1733corrigendum2.pdf
- ↑ http://finmin.nic.in/the_ministry/finance_minister/BGnote_MoF_EEC7112006.pdf
See also
- List of National Highways in India (by Highway Number)
- List of national highways in Maharashtra
- Indian National Highways Network