Shangtang Station
A train leaving Shangtang Station
Shangtang Station (Chinese: 上塘站; pinyin: Shàngtáng Zhàn) is a station on Line 4 of the Shenzhen Metro.
Station layout
Exits
Exit |
Destination |
Exit A |
Tenglong Road north-east |
Exit B |
Tenglong Road north-west |
Exit C |
Tenglong Road south-west |
Exit D |
Tenglong Road south-east |
References
|
---|
|
|
|
Future development |
---|
| Line 1 | |
---|
| Line 3 | |
---|
| Line 4 |
- (towards Futian Checkpoint) Qinghu
- Qinghua
- Zhucun
- Centurial Square West
- Jiangwei New Village
- Guanlan Centre
- Songyuan
|
---|
| Line 5 | |
---|
| Line 6 |
- Shenzhen North
- Hongshan
- Shangtang
- Shaping
- Shilong Park
- Baoshi East Rd.
- Tianxin
- Guangming High-Tech Area
- Guanguang Rd.
-
Guangming < | Guangming New City
- Longda Highway
- Gongming Chinese-English School
- Gongming Square
- Xiacun
- Gongming West
- Shanmen
- Songgang Hospital
- Songgang
| Zhenmei Rd. |
|
---|
| Line 8 |
- Liantang
- Wutongshan
- Shatoujiao
- Haishan
- Yantian Port
- Shenwai
- Yantian
|
---|
| Line 12 |
- Songgang
- Gonghe Village
- Shajing 3rd Village
- Shajing West
- Western Industrial City
- Shajing South
- Fuqiao Industrial Zone
- Fuyong North
- Airport North
- Xiashiwei
- Airport East
- Xinghua
- Zhongwu Village
- Taoyuan
- Baotian
- Chentian
- Liutang
- Shangchuan
- Lingzhi
- Bao’an Middle School
- Nantou
- Taoyuan
- Guimiao
- Chuangye Rd.
- Lixiang
- Sihai
- Gongye 6th Rd.
- Sea World
|
---|
| Line 16 |
- Universiade
- Longxiang Ave.
- Longcheng West
- Tianbantou
- Tianlongpu
- Longgang Bus Station
- Heaven Vigor Garden
- Longcheng Mid Rd.
- Longyuan Rd.
- Shuanglong
- Longnan
- Longdong Village Comm.
- Tongle Village
- Shenzhen East
- Pingshan Primary School
- Pingshan Middle School
- Dongzong
- Xinwu
- Zhukang
- Yuanlingzi
- Donglian
- Kangzi
- Xinqiao Industrial Zone
|
---|
| Long-term planning |
Line 13 |
Line 14 |
Line 15 |
Line 10 |
Waterlands Resort towards Kangzi |
Futian towards Kangzi |
Qianhai Road towards Shiyan |
Futian towards Pinghu | |
---|
| Stations that are proposed, under planning or under construction are shown in italics with gray font color. |
|
|
■: Interchange for the numbered line. Line 7 and Line 9 will open on 28 December 2016. |
Coordinates: 22°38′16″N 114°0′49″E / 22.63778°N 114.01361°E / 22.63778; 114.01361