Stelco Lake Erie Works

U. S. Steel Canada Lake Erie Works
Lake Erie Works

Stelco Lake Erie Works; image current as of September 3, 2011
Steel
Greenfield steel mill
Location 111 Rainham Road
Nanticoke, Ontario
N0A 1L0
Serving canal Welland Canal
Serving railway Southern Ontario Railway
Further ownership
Coordinates 42°48′38″N 80°04′22″W / 42.810672°N 80.072694°W / 42.810672; -80.072694
Construction
Completed June 1, 1980[1]
Employees 1250[2]
Main contractor Peter Gordon[3]
References
Stelco Lake Erie Works

U. S. Steel Canada Lake Erie Works (formally known as Stelco Lake Erie Works) is a greenfield steel mill located in Nanticoke, Ontario, Canada.[4]

All the employees who work for this operation are unionized by United Steelworkers Local 8782; which is a local that is exclusive to the employees of the former Stelco Lake Erie Works.[5] The site has been a source of jobs for many people in both Haldimand County and Norfolk County for more than 30 years. Ever since the first elements of steel were manufactured during the summer of 1980, this steel mill has produced materials for major industrial workplaces like General Motors and the other major North American manufacturing companies. A lockout and resulting lay-off of non-striking workers shut the plant down completely in 2009, with the plant not reopening until near the end of April 2010. Another lockout occurred on April 28, 2013 that finally ended on September 1 of that year with the steelworkers having a contract until 2018.

Summary

The current owner of this business venture is U.S. Steel Canada, which is a wholly owned subsidiary of United States Steel[6] and the fifth largest steelmaker in the world. U.S. Steel Canada purchased Stelco in 2007 for an exact sum figure of $1,100,000,000 ($1,257,470,710.96 in today's money).[7] The merger between the final independent Canadian company and the American steel conglomerate was finalized on August 27 of that year.[8] This operation has a focus on making steel for the automotive sector. As North America's newest greenfield steel mill and one of its most efficient mills in North America, this facility is a lifeline for its employees.

Stelco Lake Erie Works generally operates in a region of Southern Ontario where there are no wind generators planned until 2013.[9] Its electricity is provided mostly by the nearby coal-power plant (which is scheduled to close in 2014, due to an Ontario government regulation to get rid of coal power as a supplement to their hydro energy[10] as no decision has yet been made as of June 2012 on converting it to biomass or natural gas[11] ) and through the hydroelectric grid centered around Niagara Falls at the Sir Adam Beck Hydroelectric Power Stations.

During peak manufacturing periods for this integrated steel mill, Stelco Lake Erie Works releases about 21.5 kilograms or 47 pounds of mercury into the nearby air in a single year. Approximately 4 kilograms or 8.8 pounds of mercury pollution can also be found in nearby Lake Erie; affecting local fish and shellfish alike.[12] This causes problems for nearby residents who have to go to specialized doctors to treat their medical conditions. Conditions that are either caused or influenced by the high levels of regional mercury pollution includes sterility (both male and female), various cancers, asthma along with other respiratory diseases.

Lockouts

2009-10 lockout

The drastic move to move all U.S. Steel operations back to the United States ended up costing about 1500 Canadian jobs.[13] Both the Nanticoke Lake Erie Works and its sister Hamilton Works were shut down in 2009 due to lock-out;[14] leaving many people in the area with little or no disposable income to spend on consumer goods and items. A tentative agreement at Lake Erie Works was made on April 8, 2010 after an eight-month lockout[15][16] and a vote ratification was made on April 15, 2010 at 11:15 P.M.[17]

Lake Erie Works finally re-opened after the eight-month lockout on April 23, 2010,[17] re-employing about 1100 people. Approximately 400 people never got their jobs back at Stelco Lake Erie Works simply because they were either too old, moved on to other careers, turned to welfare, or went back to college. Most other local jobs lost during the global recession of the period were eventually restored; resulting in a major drop in the local unemployment rate for the summer of 2010.[18]

2013 lockout

Negotiations to extend the union contract for workers of Stelco Lake Erie Works failed on April 25, 2013. As a result, the company made their official decision to lock out all workers starting on the morning of April 28, 2013.[19] Unlike the previous lockout, failure to accept changes in wage structure was the primary reason for causing the lockout rather than the unhealthy global economy.[20] Stelco Lake Erie Works was very profitable prior to the lockout and was far from being the "bankrupt" company that U.S. Steel wanted to portray the company as to members of the mainstream media.[21]

Reduced vacation time, consolidated pay schedules and the eradication of pay raises consistent with inflation are the secondary reasons behind the lockout. One thousand people are affected by this lockout and are free to seek Employment Insurance at home through the Internet. The parent company (U.S. Steel) offered some information about "getting tough on Canadian labor during a soft economic climate." Haldimand County has been affected by this turn of events because they failed to diversify their mix of industries.[22] Norfolk County, however, has managed to mitigate some of the employment issues by becoming increasingly reliant on the economy of the Greater Toronto Area instead of the industrial muscle of the Hamilton area. Employers from that region have started to use innovative business venture plans from the globalized economy to bring 2600 residents back into the labor force.[23] Even as the lockout reaches the status of a "provincial labor dispute," certain members of the Canadian Parliament have indicated that the motives of U.S. Steel directly violate the Investment Canada Act; which prevents foreign companies from investing beyond a certain size if they do not present a "net benefit to Canada." As of 2010, Canadian policy is to consider over a foreign investment of more than $299 million to be a "significant" amount for the Canadian economy.[24]

Threatening the cost of living allowance with the changing of the base year from 1971 to 2002 was also one of the main reasons that the Stelco Lake Erie Works employees went on lockout.[25] Earning a $45,000 per year paycheck on the 1971 base year for the company's "cost of living allowance" (which would be $273,014.35 in today's money) is more substantial than a yearly paycheck using the 2002 base year for the same plan. The adjusted paycheck with inflation for the 2002 base COLA year would be $57,060.00 for an entire year of labor. Since the 1970s was a rather inflationary era[26] and the 2000s were an era of light inflation, it helps to consider that the cost of gas rose faster from 1971 to 1980 than it did from 2001 to 2010.

On September 1, 2013, 71% of voting union members acceded to the company's way of thinking and signed a five-year contract that would guarantee work until September 1, 2018. While basic salaries have remained the same, there has been a cut in vacation premiums that allowed them to get paid while on vacation.[27]

References

  1. Canadian Geographic. June 1980. Missing or empty |title= (help)
  2. Steve Arnold (2012-08-24). "U.S. Steel recalls workers, plans hiring blitz". Hamilton Spectator. Retrieved 2013-01-02. U.S. Steel has recalled all of its laid-off Hamilton workers and is posting plans to hire another 72 staff for its Canadian operations. The good news, however, doesn’t include restarting the Hamilton blast furnace.
  3. The Hamilton Spectator. "'Not a typical steel boss'". Retrieved 31 August 2012.
  4. Lake Erie Steel (11 January 2007). "Profile of Lake Erie Steel". Retrieved 29 March 2012.
  5. United Steelworkers. "Profile of United Steelworkers Local 8782". Retrieved 31 August 2012.
  6. Steel News (27 August 2007). "U. S. Steel to Acquire Stelco". Retrieved 29 March 2012.
  7. Joe Mandak (August 2007). "U.S. Steel Buying Canada's Stelco For $1B". Manufacturing.net. Retrieved March 2012. Check date values in: |access-date= (help)
  8. CBC News (27 August 2007). "Then there were none: Stelco agrees to U.S. Steel takeover". Retrieved 29 March 2012.
  9. Daniel Pearce (2011). "Green projects receive go-ahead". Brantford Expositor. Retrieved 2012-01-24. The big news, however, was in Haldimand County. That community was awarded a project that could see up to 100 wind turbines along the lake-shore in the Nanticoke area. As well, the proposal that includes the Port Dover windmills extends into Haldimand, where another 40 or more turbines could be located. mirror
  10. Ecojustice (11 October 2006). "Ontario abandons coal phase-out, guts smog and climate change plans". Retrieved 5 November 2010.
  11. Nanticoke generation brochure at Ontario Power Generation Archived June 12, 2010, at the Wayback Machine.
  12. The Oakville Beaver (29 December 2001). "Mercury pollution here is a problem" (PDF). Retrieved 31 August 2012.
  13. Financial Post (May 06, 2009)
  14. Toronto Star (March 4, 2009) Archived June 16, 2010, at the Wayback Machine.
  15. U.S. Steel and locked-out workers reach an agreement (April 8, 2010)
  16. The Global and Mail (14 April 2010). "U.S. Steel, union reach deal to end lockout". Retrieved 29 March 2012.
  17. 1 2 Steel Market Update (15 April 2010). "USW Ratifies Contract with U.S. Steel". Retrieved 29 March 2012.
  18. Daniel Pearce (July 2010). "Major drop in Norfolk unemployment rate". Simcoe Reformer. Retrieved March 2012. Check date values in: |access-date= (help)
  19. Jodi L. Koch (U.S. Steel Canada). "Signed Letter of Intent to Lock Out" (PDF). Retrieved 26 April 2013.
  20. Simon Clarke (U.S. Steel Canada). "Company's final proposal" (PDF). Retrieved 26 April 2013.
  21. Bill Ferguson (USW 8782). "Who is Trevor Harris Anyway?" (PDF). Retrieved 4 May 2013.
  22. The Hamilton Spectator. "U.S. Steel locking Nanticoke workers out Sunday". Retrieved 30 April 2013.
  23. Daniel Pearce (June 2013). "Optimism being felt in Norfolk". Simcoe Reformer. Retrieved June 2013. Check date values in: |access-date= (help)
  24. http://www.ic.gc.ca/eic/site/ica-lic.nsf/eng/h_lk00050.html
  25. U. S. Steel Canada wants fair agreement at The Simcoe Reformer
  26. Frum, David (2000). How We Got Here: The '70s. New York: Basic Books. pp. 292–293. ISBN 0-465-04195-7.
  27. Steelworkers head back to work after agreeing to five-year deal with U.S. Steel at the Brantford Expositor
This article is issued from Wikipedia - version of the 11/14/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.