Tafila Wind Farm

Tafila Wind Farm
Location of Tafila Wind Farm in Jordan
Country Jordan
Location Tafilah Governorate
Coordinates 30°42′02″N 35°40′42″E / 30.7005°N 35.6783°E / 30.7005; 35.6783Coordinates: 30°42′02″N 35°40′42″E / 30.7005°N 35.6783°E / 30.7005; 35.6783
Status Operational
Construction began 2013
Commission date 2015
Construction cost $287 million
Owner(s) Jordan Wind Project Company
Operator(s) Vestas
Wind farm
Type Onshore
Avg. site elevation 1400-1700 m
Rotor diameter 112 meters
Rated wind speed 12 m/s
Power generation
Units operational 38
Nameplate capacity 117 MW
Average generation 400 GWh
Website
http://www.jordanwind.com

Tafila Wind Farm is 117 MW wind farm located in Tafilah Governorate, Jordan. The farm consists of 38 turbines, inaugurated in December 2015 by King Abdullah II. It is considered to be the first of its kind in the Kingdom and the region.[1] The venture aims to diversify energy resources in Jordan and boost the renewable energy contribution in the total energy mix.[2]

View of the wind farm
View of the wind farm

See also

References

  1. "Jordan News Agency (Petra) |King inaugurates Tafila Wind Farm Project". petra.gov.jo. Retrieved 2016-10-14.
  2. "الملك يدشن مشروع رياح الطفيلة (صور)". وكالة عمون الاخبارية. Retrieved 2016-10-14.
This article is issued from Wikipedia - version of the 11/11/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.