The Tres Amigas SuperStation is a planned project to unite North America’s two major power grids (the Eastern Interconnection and the Western Interconnection) and one minor grid (the Texas Interconnection), with the goal to enable faster adoption of renewable energy and increase the reliability of the U.S. grid.[1] The project will use superconducting wires from Massachusetts-based American Superconductor Corp for electrical distribution and to interconvert alternating current (AC) and direct current (DC) power.

Proposed by Tres Amigas, LLC in 2009, the project is in the process of finalizing funding. Permits and construction contracts are in place.[2] CEO Phillip G. Harris is the former CEO of PJM Interconnection, an East Coast regional transmission organization (RTO).

Overview

The Tres Amigas SuperStation project proposes to tie the East Coast, West Coast and Texas grids together via three 5 GW superconductive high-voltage direct current power transmission lines,[3] which permit a controlled flow of energy while also functionally isolating the independent AC frequencies of each side. The design is scalable to 30 GW.[4] Tres Amigas would use high-temperature superconductor (HTS) wire[1] supplied by American Superconductor Corp.

The Tres Amigas SuperStation plans to act as a power market hub, enabling the buying and selling of electricity among three of North America's largest interconnections[5] above the amount available today. ERCOT has 5 DC ties to the other grids, totaling 1,100 MW.[4]

The project will provide solar, wind and other renewable developers with the transmission infrastructure needed to transport clean electricity to population centers.[6]

Location

The two major and three minor NERC Interconnections, and the nine NERC Regional Reliability Councils.

The Tres Amigas super station will be located on a 22-square-mile (57 km2) state plot of land near Clovis, New Mexico,[7] leased for 99 years at $9 million per year.[8]

Cost

Early estimates of the cost put the project budget at around $1 billion,[7] and later at $2 billion.[9]

Project schedule and status

Proposed in 2009.[10] In 2011, Tres Amigas SuperStation (TAS) awarded Alstom Grid a €150m (£132.4m) contract for a 750MW, 345kV DC converter scheme [11] for a VSC connecting PNM and Xcel Energy in 2014.[4][9] Construction was planned to begin in Summer 2012.[4][9][12]

President Ben Shelly of the Navajo Nation has expressed interest in investing $12 million in the project.[13]

In 2010, Scandia Wind Southwest LLC, a venture led by Norwegian wind power developers, proposed to build an initial 2,250 megawatts of wind power in the Texas Panhandle, with a potential capacity of 10,000 MW.[14]

Phase 1, the connection of East Coast and West Coast grids, could cost $400 million, and all 3 phases could then cost $1.2 billion.[15]

In 2013, two key announcements confirmed the ongoing progress of the project, and an expected commercial load date of 2016.[16]

The company will move its headquarters to downtown Albuquerque, in the former Petroleum Club building.

As of 2015, the project has not started.[17]

See also

References

External image
Official bronze sculpture KKathy Larsen
Transmission as art, New Mexico-style Platts 11 August 2010. Retrieved 31 March 2012
This article is issued from Wikipedia - version of the 11/15/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.