Tymień Wind Farm

Tymień Wind Farm
Location of Tymień Wind Farm in Poland
Official name Park Wiatrowy Tymień
Country Poland
Location Tymień, West Pomeranian Voivodeship
Coordinates 54°12′02″N 15°51′08″E / 54.20056°N 15.85222°E / 54.20056; 15.85222Coordinates: 54°12′02″N 15°51′08″E / 54.20056°N 15.85222°E / 54.20056; 15.85222
Status Operational
Commission date 2005
Owner(s) Energa
Operator(s) Koszalin Power Plant

Tymień Wind Farm a group of wind turbines located in the vicinity of Tymień, West Pomeranian Voivodeship near Kołobrzeg, in the district of Koszalin.

The investment cost amounted to PLN 235 million zł. The recipient of energy is Koszalin Power Plant forming part of the group Energa. Built in 2006, by 2008 it was the largest wind farm in the country, with power up to 50 MW, higher than the open in 2003 wind farm in Zagórze near Wolin 30 MW. Currently, the largest wind park in Poland is the Margonin wind farm of 120 MW (60 wind turbines, each with a capacity of 2.0 MW), developed by the company Neolica Poland Sp. z oo owned by Energias de Portugal (EdP).