USS Manchineel (AN-54)

History
United States
Name: USS Manchineel
Namesake: A poisonous tropical American tree of the spurge family of shrubby plants having a blistering milky juice and apple shaped fruit
Ordered: as Sumac (YN-73)
Builder: Pollock-Stockton Shipbuilding Co., Stockton, California
Laid down: 8 June 1943 as Manchineel (YN-73)
Launched: 1 January 1944
Commissioned: 26 April 1944 as USS Manchineel (AN-54)
Decommissioned: 11 March 1946, at Mare Island Navy Yard
Renamed: Manchineel, 3 April 1943
Reclassified: AN-54, 20 January 1944
Struck: 12 April 1946
Fate: transferred to the U.S. Maritime Commission, 18 June 1947
General characteristics
Class and type: Ailanthus-class net laying ship
Displacement: 1,460 tons
Length: 194' 6"
Beam: 34' 7"
Draft: 11' 8"
Propulsion: diesel electric, 2,500hp
Speed: 12.1 knots
Complement: 56 officers and enlisted
Armament: one single 3"/50 gun mount, three twin 20mm gun mounts

USS Manchineel (AN-54/YN-73) was an Ailanthus-class net laying ship which served with the U.S. Navy in the South Pacific Ocean during World War II. She managed to survive the war without incident, and returned to the United States post-war for decommissioning.

Launched at Stockton, California

YN 73, originally named Sumac, was renamed Manchineel 3 April 1943; laid down 8 June 1943 by Pollock-Stockton Shipbuilding Company, Stockton, California; launched 1 January 1944; sponsored by Mrs. Warren Atherton; redesignated AN-54 20 January 1944; and commissioned 26 April 1944, Lt. William B. Brown, USNR, in command.

World War II service

South Pacific operations

Following shakedown off San Pedro, California, Manchineel departed 22 June for the South Pacific Ocean, arriving Pearl Harbor 1 July. She operated off Pearl Harbor until 5 September when she sailed for the Marshall Islands, arriving at Majuro Atoll the 15th. After removing the nets around the atoll, Manchineel continued on to Kwajalein 22 September, arriving 4 days later for net tending duties until 20 May 1945.

The net laying ship then steamed for the Gilbert Islands, arriving Tarawa 23 May to pick up six pontoon barges for tow to Majuro. The trip took 6 long days of retrieving and dragging the water filled pontoons. Manchineel returned to Kwajalein 2 June to resume net operations.

Except for a week at Eniwetok in July, Manchineel remained in the Kwajalein area through the announcement of Japan’s surrender 15 August.

Post-war decommissioning

On 10 October the ship departed for the U.S. West Coast via Pearl Harbor, arriving San Francisco, California, 3 November for mooring duty.

Manchineel decommissioned 11 March 1946, was stripped at Mare Island Naval Shipyard, and was struck from the Navy list 12 April. On 18 June 1947 Manchineel was transferred to the U.S. Maritime Commission and delivered to Walter H. Wilms following sale 2 days earlier.

References


This article is issued from Wikipedia - version of the 11/1/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.