West Hill Dam
West Hill Dam Reserve, US Army Corps of Engineers | |
---|---|
Massachusetts State Parks and Federal Reserves | |
West Hill Dam during a flood in October, 2005 | |
Country | United States |
State | Massachusetts |
County | Worcester |
Location | Hartford Ave East, Uxbridge, Massachusetts, USA |
- coordinates | 42°5′29″N 71°36′7″W / 42.09139°N 71.60194°WCoordinates: 42°5′29″N 71°36′7″W / 42.09139°N 71.60194°W |
- elevation | 450 ft (137 m) |
Managed by | US Army Corps of Engineers |
Nearest city | Uxbridge, Massachusetts |
Location of the West Hill Dam | |
Website : http://www.nae.usace.army.mil/recreati/whd/whdhome.htm US | |
West Hill Dam Reserve is a United States Army Corps of Engineers flood control project with a recreational park and wildlife management area located at Uxbridge, Massachusetts. The West Hill Dam Project was completed in 1960. It is located on the West River, one of the branches of the Blackstone River which flows from Worcester, MA to Providence, RI. The West River originates in Grafton, Massachusetts, at Cider Mill Pond and Silver Lake, near Upton, Massachusetts, and the Upton State Forest. The dam is unusual in that it isn't filled unless there is a flood. West Hill Dam was built after devastating floods during the 1950s; it is intended to protect the Blackstone Valley from future destructive flooding. The cities and towns downriver from Uxbridge, including Millville, Blackstone, Woonsocket, North Smithfield, Cumberland, Lincoln, Central Falls, Pawtucket and Providence, Rhode Island, suffered extensive flooding from the Blackstone during Hurricane Diane in 1955. Hurricane Donna tested this new dam in 1960 as the eyewall passed over. The West Hill Dam is located in the Blackstone River Valley National Heritage Corridor near the Blackstone River and Canal Heritage State Park. Park rangers provide visitor assistance and offer scheduled interpretative programs. Fishing, hunting, and wildlife viewing opportunities are available year-round. The park has a recreation area, 34 picnic sites, one playground, a swimming area and five miles of hiking trails. West Hill Dam (where the Army Corps project is based) is also the field office for the Charles River Natural Valley Storage Area. It consists of scattered wetlands in the upper and middle Charles River watershed, between the towns of Bellingham and Needham. The wetlands provide flood storage area, fisheries, wildlife management, and recreation. The Charles River is, of course, the well-known watercourse that flows into Boston Harbor.
Geography of West Hill Dam
West Hill is the westernmost hill in Mendon. Nearly all of its western slope is in Uxbridge, and this is where the dam is located. The town of Northbridge is immediately to the north of this site and includes some of the reservoir trapped behind the West Hill Dam. West Hill and West Hill Dam are in the northeastern part of Uxbridge township. The actual summit of West Hill is in the adjacent town of Mendon. The federal reserve contains 567 acres in the townships of Uxbridge, Northbridge, and Upton, Massachusetts. The New England town or township is a unique municipality unit unlike those of any other geographic region of the United States.
Historic Context and Location
The West Hill area was one of fourteen sites of Praying Indian Villages, established by the missionary, John Eliot around 1650. Early water powered mills, including some downsream on the West River, and Blackstone River, helped jumpstart America's industrial revolution in this river valley region. The Blackstone Valley is a New England upland region with elevations from approximately two hundred feet to over six hundred feet above sea level. West Hill Dam is located about thirty-four miles west-southwest of Boston, and about fifteen miles southeast of Worcester.
See also
- West River (Massachusetts)
- Uxbridge, Massachusetts
- Northbridge, Massachusetts
- Army Corps of Engineers
- Blackstone Valley
- Blackstone River and Canal Heritage State Park
- Charles River Natural Valley Storage Area
- West Hill Dam, Master Plan