Line 2, Suzhou Rail Transit

Line 2, Suzhou Rail Transit
Overview
Type Rapid transit
System Suzhou Rail Transit
Status In operation
Termini Qihe
Sangtiandao
Stations total 35 stations, first phase are 22 stations (6 Elevated Stations, 16 Underground Stations), second phase are 13 stations.
Operation
Owner Suzhou Rail Transit Co., Ltd
Operator(s) Suzhou Rail Transit Co., Ltd
Character Elevated and Underground
Technical
Line length 40.4 kilometres (25.1 mi)
Track length 79.2m
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification overhead wire
Shihu Road station under construction

Line 2 is the main north-south line of Suzhou Rail Transit. The length of first phase is 26.557 km, among them, 6.57 km is elevated, 19.146 km is underground and 0.67 km is open wide. The line's first phase started from Suzhou North Railway Station (高铁苏州北站) and ended in Baodaiqiao South Station (宝带桥南站) near Baodai Bridge (宝带桥). The line goes across five districts of Suzhou, including 22 stations(17 underground, 5 overhead). The first phase part was started to operation on December 28, 2013.[1]

The length of second phase is 14.347 km, which started from Qihe Station (骑河站) to Fuxiang Lu Station (富翔站) for north expand section, and Yinzhong Lu Station (尹中路站) to Sangtiandao Station (桑田岛站) for east expand section. The second phase part was started to trial operation on September 24, 2016.[2]

Stations

Shilu Station
Interchange signage in Guangji Nanlu Station
Station Name
English
Station Name
Hanzi
Platform Types
Transfer
Location
Qihe 骑河 island (und 2) Xiangcheng
Fuxiang Lu (Fuxiang Road) 富翔路 island (und 2)
Suzhou North Railway Station 高铁苏州北站 island (und 2)
Dawan 大湾 side (ele 3)
Fuyuan Lu (Fuyuan Road) 富元路 side (ele 3)
Likou 蠡口 side (ele 3)
Xutu Gang (Xutu Harbor) 徐图港 side (ele 3)
Yangchenghu Zhonglu (Middle Yangchenghu Road) 阳澄湖中路 side (ele 3)
Lumu 陆慕 island (und 2)
Pinglonglu East (East Pinglong Road) 平泷路东 island (und 2)
Pinghe Lu (Pinghe Road) 平河路 island (und 2) Gusu
Suzhou Railway Station 苏州火车站 island (und 2)  4  (not open)
Shantang Jie (Shantang Street) 山塘街 island (und 2)
Shi Lu (Shi Road) 石路 island (und 2)
Guangji Nanlu (South Guangji Road) 广济南路 island (und 3)  1  (In operation)
Sanxiang Square 三香广场 island (und 2)
Laodong Lu (Laodong Road) 劳动路 island (und 2)
Xujiang Lu (Xujiang Road) 胥江路 island (und 2)
Tongjing Park 桐泾公园 island (und 2)
Youlian 友联 island (und 2) Wuzhong
Panli Lu (Panli Road) 盘蠡路 island (und 2)  3  (not open)
Xinjia Qiao (Xinjia Bridge) 新家桥 island (und 2)
Shihu Donglu (East Shihu Road) 石湖东路 island (und 2)  4  (not open)
Baodaiqiao South (South Baodai Bridge) 宝带桥南 island (und 2)
Yinzhong Lu (Yinzhong Road) 尹中路 island (und 2)
Guoxiang 郭巷 island (und 2)
Guoyuan Lu (Guoyuan Road) 郭苑路 island (und 2)
Yinshan Lake 尹山湖 island (und 2)
Dushuhu South (South Dushu Lake) 独墅湖南 island (und 2) Gusu
(Suzhou
Industrial
Park)
Dushuhu Neighbor Center 独墅湖邻里中心 island (und 2)
Yueliang Wan (Moon Bay) 月亮湾 island (und 2)
Songtao Jie (Songtao Street) 松涛街 island (und 2)
Jingu Lu (Jingu Road) 金谷路 island (und 2)
Jinshang Lu (Jinshang Road) 金尚路 island (und 2)
Sangtian Dao (Sangtian Island) 桑田岛 island (und 2)

Operations

Line 2 train

Intervals

Weekdays & Weekends
PeriodTimeIntervals
weekdays morning rush hours(Peak)7:45 — 9:006m10s
weekdays evening rush hours(Peak)17:00 — 19:006m10s
weekends daily rush hours(Peak)11:00 — 20:406m10s
Other hours(Normal)Exclude above rush hours6m50s

[3]

Fares

Fares start at 2.00 Yuan (¥) and can take 6 kilometers (km), 6 km to 16 km every additional 1.00 Yuan (¥) can take 5 km, 16 km to 30 km every additional 1 Yuan (¥) can take 7 km, 30 km and above every additional 1 Yuan (¥) can take 9 km, so the whole journey of Line 2 is 8 Yuan (¥).

References

This article is issued from Wikipedia - version of the 10/17/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.