Line 3, Qingdao Metro
Line 3, Qingdao Metro | |
---|---|
Overview | |
Type | Rapid transit |
System | Qingdao Metro |
Status | North section is operating, south section is under construction |
Locale | Qingdao, China |
Termini |
Shuangshan (current) Qingdao Railway Station (future) Qingdaobei Railway Station |
Stations | 22 (10 operating) |
Services | 1 |
Operation | |
Opened | December 16, 2015 |
Owner | Government of Qingdao |
Operator(s) | Qingdao Metro Corporation |
Character | Underground |
Rolling stock | Chinese Type B |
Technical | |
Line length |
24.8 km (15.41 mi) (operating: 12 km (7.46 mi)) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
The Line 3 of Qingdao Metro (Chinese: 青岛地铁三号线) is an underground metro line in Qingdao. The north section began operation on December 16, 2015,[1] and the south section will begin operation in 2016.
Stations
Station name | Transfer | Location | |||
---|---|---|---|---|---|
English | Simplified Chinese | ||||
Qingdao Railway Station | 青岛站 | 1 (planned) | Shinan | ||
People's Hall | 人民会堂 | 4 (planned) | |||
Huiquan Plaza | 汇泉广场 | ||||
Zhongshan Park | 中山公园 | ||||
Yan'an 3rd Road | 延安三路 | ||||
May Fourth Square | 五四广场 | 2 (planned) | |||
Jiangxi Road | 江西路 | 5 (planned) | |||
Ningxia Road | 宁夏路 | ||||
Dunhua Road | 敦化路 | ||||
Cuobuling | 错埠岭 | 4 (planned) | Shibei | ||
Qingjiang Road | 清江路 | ||||
Shuangshan | 双山 | ||||
Changsha Road | 长沙路 | ||||
Metro Building | 地铁大厦 | ||||
Haier Road | 海尔路 | Licang | |||
Wannianquan Road | 万年泉路 | ||||
Licun | 李村 | 2 (planned) | |||
Junfeng Road | 君峰路 | ||||
Zhenhua Road | 振华路 | ||||
Yongping Road | 永平路 | ||||
Qingdaobei Railway Station | 青岛北站 | 1 (planned) | |||
References
- ↑ "Qingdao subway system to launch in December". December 14, 2015. Retrieved December 16, 2015.
This article is issued from Wikipedia - version of the 11/27/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.