Line 4, Ningbo Rail Transit
Line 4, Ningbo Rail Transit | |
---|---|
Overview | |
Type | Rapid transit |
System | Ningbo Rail Transit |
Status | Under construction |
Locale | Ningbo, Zhejiang, China |
Termini |
Cicheng Dongqian Lake |
Stations | 25 |
Operation | |
Opened | 2020 |
Owner | Ningbo |
Operator(s) | Ningbo Rail Transit Co.,Ltd. |
Character | Underground / Elevated |
Technical | |
Line length | 36.11 km (22.44 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 4 of Ningbo Rail Transit (Chinese: 宁波轨道交通4号线) is a rapid transit line under construction in Ningbo. It starts from Cicheng Town, Jiangbei District, and ends near Dongqian Lake in Yinzhou District.[1] Construction of Line 4 started on November 30, 2015.[2]
Route
Line 4 starts from Cicheng Station in Cicheng Town in east-west direction as an elevated line. Then it turns south into the North External Ring Viaduct where it turns east-west. After reaching Jiangbei Avenue, it starts to turn underground and deviates from the viaduct to Zhuangqiao Railway Station where it turns south, crosses Yaojiang River and reaches Ningbo Railway Station. Then Line 4 goes along Changchun Road, Xingning Road until it reaches Canghai Road and become north-south again. After reaching Shounan Road it turns into southeast direction and reaches Dongqian Lake, its destination.[1]
Stations
Station name[note 1] | Transfer | Location | |
---|---|---|---|
English | Chinese | ||
Cicheng | 慈城 | Jiangbei | |
Cicheng South | 慈城南 | ||
Changxing Road Station | 长兴路 | ||
Jinshan Road District | 金山路 | ||
Olympic Sports Center | 奥体中心 | ||
Hongtang Middle Road | 洪塘中路 | ||
Hongda Road | 洪大路 | ||
Zhuangqiao Railway Station | 庄桥火车站 | ||
Lijiang Road | 丽江路 | ||
Shuangdong | 双东 | ||
Xinzhi | 新芝 | 6 (plan) | Haishu |
Daqing Bridge | 大卿桥 | 1 | |
Liuxi | 柳西 | ||
Ningbo Railway Station | 宁波火车站 | 2 | |
Xingning Bridge West | 兴宁桥西 | ||
Xingning Bridge East | 兴宁桥东 | Yinzhou | |
Baihe | 白鹤 | ||
Children's Park | 儿童公园 | 3 (u.c.) | |
Ningbo East Railway Station | 宁波东站 | ||
Huancheng South Road | 环城南路 | ||
Songjiang East Road | 嵩江东路 | ||
South University Park | 南高教园区 | 5 (u.c.) | |
Jinda South Road | 金达南路 | ||
Dongqian Lake Avenue | 东钱湖大道 | 7 (plan) | |
Dongqian Lake | 东钱湖 | ||
- ↑ Station names might be changed in construction.
References
Wikimedia Commons has media related to Line 4, Ningbo Rail Transit. |
- 1 2 Ningbo Environment Protection Design Group. Report of Environment Impact of Line 4, Ningbo Rail Transit. Ningbo. November 2014.
- ↑ "又一条地铁来了!宁波轨交4号线今开工 工期5年". cnnb.com.cn (in Chinese). November 30, 2015.