New York State Thruway

"NYST" redirects here. For the theatre at Lincoln Center, see New York State Theater.

New York State Thruway
Governor Thomas E. Dewey Thruway

Map of New York with the Thruway mainline in red. Other components of the Thruway system are in brown; former components are in gray
Route information
Maintained by New York State Thruway Authority
Length: 496.00 mi[1] (798.23 km)
Mainline only
Existed: June 24, 1954[2] – present
Component
highways:
I-87 from The Bronx to Albany
I-90 from Albany to Ripley
Major junctions
South end: I-87 in The Bronx
 
West end: I-90 in North East, PA
Highway system

The New York State Thruway is a system of limited-access highways located within the state of New York in the United States. The system, known officially as the Governor Thomas E. Dewey Thruway for former New York Governor Thomas E. Dewey, is operated by the New York State Thruway Authority (NYSTA) and comprises 569.83 miles (917.05 km) of highway. The tolled mainline of the Thruway extends for 496.00 miles (798.23 km) from the New York City line at Yonkers to the Pennsylvania state line at Ripley by way of Albany, Syracuse, and Buffalo. According to the International Bridge, Tunnel and Turnpike Association, the Thruway is the fifth busiest toll road in the United States.[3]

A tolled highway connecting the major cities of New York was first proposed as early as the 1940s. The first section of the Thruway, between Utica and Rochester, opened on June 24, 1954. The remainder of the mainline and many of its spurs connecting to highways in other states and provinces were built in the 1950s. When the Interstate Highway System was created in 1957, much of the Thruway system was included as portions of Interstate 87 (I-87), I-90, and I-95. Other segments became part of I-190 and I-287 shortly afterward. Today, the system comprises six highways: the New York–Ripley mainline, the Berkshire Connector, the Garden State Parkway Connector, the New England Thruway (I-95), the Niagara Thruway (I-190), and the Cross-Westchester Expressway (I-287). The portion of I-84 in New York was part of the Thruway system from 1991 to 2010.

The Thruway utilizes both open (barrier-based) tolling and closed (ticket-based) tolling. Tickets are used on the Thruway mainline between Harriman and the eastern suburbs of Buffalo and from the southern suburbs of Buffalo to the Pennsylvania state line. The Berkshire Connector also utilizes a ticket-based tolling system. The portion of the mainline south of Harriman, the New England Thruway, and the Niagara Thruway have open tolling systems, with all three highways containing at least one toll barrier. The last two components—the Garden State Parkway Connector and the Cross-Westchester Expressway—and the section of the mainline in and around Buffalo are toll-free.

Route description

The New York State Thruway in Yonkers

The New York State Thruway system is a collection of six individual components across the state of New York that connect the state to four neighboring states (Connecticut, Massachusetts, New Jersey, and Pennsylvania) as well as the Canadian province of Ontario. Together, the highways extend for 569.83 miles (917.05 km),[1] making the Thruway system one of the largest toll highway systems in the United States.[4] The longest of the six components is the 496-mile (798 km) mainline. Of the 570 miles in the Thruway system, 560.85 miles (902.60 km) (98.4%) carries at least one Interstate Highway designation.[1] Only three sections of the system are not part of the Interstate Highway System; these are the Garden State Parkway Connector in Rockland County, a 6-mile (10 km) portion of the Berkshire Connector between exit 21A on the mainline near Selkirk and exit B1 in Schodack, and a short section of the mainline within exit 24 in Albany that is located between where I-87 departs the roadway and I-90 enters it. They are designated as New York State Route 982L (NY 982L), NY 912M, and NY 915H, respectively, all unsigned reference routes.[5] The speed limit, enforced by the New York State Police, is 65 miles per hour along most of the Thruway.[6]

I-90, which comprises the bulk of the mainline and the Berkshire Connector, runs for 365.55 miles (588.30 km) along the Thruway: 17.70 miles (28.49 km) as part of the Berkshire Connector and 347.85 miles (559.81 km) on the mainline. I-87 comprises the remaining 148.15 miles (238.42 km) of the mainline, including an 18.86-mile (30.35 km) concurrency with I-287 north of New York City. I-287 covers another 29.76 miles (47.89 km) (including the 18.86 miles (30.35 km) shared with I-87), while I-190 spans 21.24 miles (34.18 km) and I-95 covers 15.01 miles (24.16 km).[1]

All highways maintained by the New York State Thruway Authority (NYSTA) lack the reference markers that exist on all New York State Department of Transportation-maintained roads, as would be expected. In their place, NYSTA-controlled roadways use small, square tenth-mile markers with a white background and blue numbering.[7] These markers differ from the white-on-green reference markers used by NYSDOT on state-maintained highways, which are 10 inches (254 mm) high and 8 inches (203 mm) wide and display a limited amount of mileage information on their third row.[8]

Mainline

South of Albany

The mainline of the Thruway begins, both in terms of exit numbers and mileposts, at the boundary between the New York City borough of the Bronx and the Westchester County city of Yonkers.[1] Here, I-87 changes from the Major Deegan Expressway to the Thruway as the mainline proceeds northward through Yonkers and southern Westchester County. It connects with Central Park Avenue (NY 100) at exit 1, the first of 12 exits within the county. The first few exits serve various local streets, with exit 2 providing access to Yonkers Raceway and exit 3 serving the Cross County Shopping Center. At exit 4, I-87 connects to the Cross County Parkway, an east–west parkway providing access to the Saw Mill River, Bronx River, and Hutchinson River parkways, all of which run parallel to the Thruway through Yonkers. The Hutchinson River and Bronx River parkways leave to the northeast midway through Yonkers, while the Saw Mill and Sprain Brook parkways follow the Thruway out of the city.[9]

Tappan Zee Bridge (I-87 and I-287)

All three highways take generally parallel tracks to Elmsford, where I-87 directly intersects the Saw Mill River Parkway at exit 7A. Not far to the north is exit 8, a semi-directional T interchange with I-287 (the Cross-Westchester Expressway). I-287 joins the Thruway here, following I-87 west across the Hudson River into Rockland County on the Tappan Zee Bridge. I-87 and I-287 remain overlapped for 15 miles (24 km) through the densely populated southern portion of Rockland County, meeting the Palisades Interstate Parkway and the New York segment of the Garden State Parkway at exits 13 and 14A, respectively. The Thruway continues generally westward to Suffern, where I-87 and I-287 split at a large semi-directional T interchange (exit 15) near the New Jersey border. At this point, I-287 heads south into New Jersey while I-87 and the Thruway turn northward into the valley of the Ramapo River.[9]

The Thruway continues north through the river valley toward Harriman, where it encounters the Woodbury toll barrier, the southeastern end of the mainline's major closed ticket system. The barrier is located on the mainline within exit 16 (NY 17), a trumpet interchange. Along with the mainline barrier in Harriman, a separate toll plaza exists on the exit 16 ramp midway between the Thruway and NY 17 exit 131 (NY 32). Now a completely tolled highway, the Thruway heads northward, roughly paralleling the Hudson River to the river's west as it serves the city of Newburgh, the village of New Paltz, and the city of Kingston, indirectly connecting to the short I-587 in the latter.[9]

Past Kingston, the highway runs closer to the river as it parallels U.S. Route 9W (US 9W) through the towns of Saugerties, Catskill, Coxsackie, and Ravena. Just north of Ravena, the Thruway meets the west end of the Berkshire Connector, a spur linking the Thruway mainline to the Massachusetts Turnpike 25 miles (40 km) to the east. The highway continues into Albany, where it connects to Troy via I-787 at exit 23 and intersects I-90 at exit 24.[9] The latter of the two junctions is the busiest of the Thruway's exits, serving an estimated 27 million vehicles a year.[10] I-87 leaves the Thruway mainline here while I-90 merges into it, following the Thruway northwestward toward Schenectady.[9]

Albany to Syracuse

The New York State Thruway (I-87) looking east from Nordkop Mountain in Suffern

South of Schenectady, but still in Albany County, the Thruway and I-90 meet I-890, a loop route of I-90 that directly serves the downtown district of Schenectady, at exit 25. The Thruway, meanwhile, bypasses the city to the south and west, intersecting I-88 at exit 25A in Rotterdam before reuniting with I-890 at exit 26 west of Scotia. From this point west to Utica, the mainline of the Thruway parallels the Erie Canal and the Mohawk River, crossing over the waterbodies at Mohawk. In between Schenectady and Utica, I-90 and the Thruway serve several riverside communities, including the cities of Amsterdam (exit 27 via NY 30) and Little Falls (exit 29A, NY 169) and the villages of Fonda (exit 28, NY 30A), Canajoharie (exit 29, NY 5S and NY 10), and Mohawk (exit 30, NY 28).[9]

Like Schenectady before it, the Thruway bypasses downtown Utica, following an alignment north of the city while I-790 serves it directly. I-790 breaks from the Thruway at exit 31 and runs along two carriageways flanking the mainline on both sides for 1.5 miles (2.4 km) before turning southward onto the North–South Arterial. The adjacent highways become NY 49, which parallel the Thruway for another 2 miles (3.2 km) northwestward. At the end of this stretch, the Thruway turns slightly southwestward, crossing over the Mohawk River and the Erie Canal while NY 49 continues northwestward along the northern bank of the waterbodies toward Rome. On the other side of the river, the Thruway curves back to the west, proceeding to exit 32 in Westmoreland.[9]

I-90, part of the New York State Thruway, looking east near Syracuse

Not far to the west, the Thruway has a junction with NY 365 at exit 33 in Verona. Here, the Thruway connects to the cities of Rome and Oneida and serves the Turning Stone Resort & Casino via NY 365. The highway continues onward through a sparsely populated area between Verona and Syracuse, passing roughly 5 miles (8 km) south of Oneida Lake as it connects to the village of Canastota by way of NY 13 at exit 34. As the highway approaches exit 34A (I-481) outside of Syracuse, the surroundings become more developed. The level of development rises sharply west of I-481 as the Thruway enters Salina, a northern suburb of Syracuse. Within Salina, I-90 and the Thruway intersect I-81, which connects the Thruway to both downtown Syracuse and Syracuse Hancock International Airport.[9]

Syracuse to Buffalo

West of Salina, the Thruway passes north of Liverpool and Onondaga Lake before intersecting I-690 and its northern continuation, NY 690, at exit 39 in Van Buren. At this point, the amount of development along the Thruway sharply declines as it heads generally westward through a marshy area of Onondaga County. I-90 and the Thruway reconnect to the Erie Canal (here part of the Seneca River) at the western county line. Now in Cayuga County, the highway serves Weedsport via exit 40 and NY 34 and passes north of Port Byron prior to entering Seneca County and the Montezuma National Wildlife Refuge. Here, the canal leaves the Thruway for good, turning northwestward to follow the NY 31 corridor to Rochester and beyond.[9]

Advance signage for exit 45 (I-490)

The portion of the Thruway between Montezuma and the Rochester area is one of mostly rural nature, with the highway passing through remote, open fields, and for the most part avoiding highly populated areas. Along this stretch, it connects to two cities, both located well to the south of the Thruway: Geneva by way of exit 42 for NY 14 and Canandaigua by way of exit 43 via NY 21. The next exit along the highway, exit 44 for NY 332, also serves Canandaigua; the junction is the primary exit for Canandaigua-bound travelers from the Rochester area. Here, the Thruway temporarily widens from four to six lanes as it continues generally westward to meet I-490 at exit 45 near Victor. Like in the vicinity of Schenectady and Utica, an auxiliary route of I-90—here I-490—directly serves a city (Rochester) while the Thruway bypasses it.[9]

It heads northwestward through the city's southern, mostly rural suburbs to Henrietta, where it meets I-390 at exit 46. Henrietta is as close as the Thruway gets to downtown as it proceeds west to Le Roy, where I-490 reconnects to I-90 at exit 47. I-90 continues onward into Genesee County, intersecting with NY 98 at exit 48 north of Batavia and NY 77 at exit 48A in Pembroke. The latter exit provides access to Darien Lake, a large amusement park located in the town of Darien. I-90 and the Thruway continue into Erie County and the Buffalo area. It meets NY 78 at exit 49 near Depew before passing through the Williamsville toll barrier, the northwestern end of the major closed ticket system.[9]

West of Buffalo

Just west of the toll barrier, I-90 and the Thruway—now toll-free—connect to I-290 via exit 50, a semi-directional T interchange. At this point, the Thruway turns southward, passing through the immediate eastern suburbs of Buffalo. As it heads south, it meets the Kensington Expressway (NY 33) at exit 51 and Walden Avenue at exit 52, both cloverleaf interchanges. At exit 52, it passes to the west of the Walden Galleria, a shopping mall situated at the nearby junction of Walden Avenue and NY 277. Two exits later in southern Cheektowaga, I-90 meets I-190, a spur route leading to downtown Buffalo and Niagara Falls, at exit 53.[9]

NYS Thruway near Silver Creek

South of the city, the Thruway meets the Aurora Expressway (NY 400) and the Southern Expressway (US 219) at exits 54 and 55, respectively, in West Seneca. Just southwest of exit 55, I-90 and the Thruway pass through the Lackawanna toll barrier, which serves as the northeast end of the minor closed ticket system. Once again a toll road, the Thruway heads southwestward, roughly paralleling the shoreline of Lake Erie to Blasdell, where it connects to NY 179 (the Milestrip Expressway). Farther southwestward, the Thruway is joined by US 20, which follows a parallel routing to that of the Thruway to the Pennsylvania state line.[9]

As the route passes from Erie County to Chautauqua County, the last on its routing, it cuts through the northwestern portion of the Cattaraugus Indian Reservation, situated on Cattaraugus Creek. The Thruway continues alongside US 20 past Dunkirk and Westfield to the Ripley toll barrier, the southwestern end of the minor closed ticket system just northeast of exit 61 for Shortman Road. The Thruway ends about 1 mile (1.6 km) after exit 61 at the Pennsylvania state line. I-90, however, continues onward into Pennsylvania as a toll-free highway.[9]

Berkshire Connector

The Berkshire Connector is a 24.28-mile (39.07 km) east–west spur connecting the Thruway mainline in Coeymans to the Massachusetts Turnpike at the Massachusetts state line in Canaan.[1] It is tolled as part of the closed ticket system in place on the mainline between exits 16 and 50. The highway begins at exit 21A off the Thruway southwest of Selkirk in the town of Coeymans (south of Albany)[11] as NY 912M, an unsigned reference route.[5] It proceeds eastward over the Hudson River and into Rensselaer County by way of the Castleton-on-Hudson Bridge. It navigates through the southern, rural portion of the county to exit B1 in Schodack, where the connector meets I-90.[11] The unsigned NY 912M designation terminates here while I-90 joins the Berkshire Connector and follows the spur east into Columbia County.[5][11]

While the Rensselaer County segment follows a mostly east–west routing, the Berkshire Connector in Columbia County takes on a northwest-southeast alignment as the roadway heads towards exit B2 in East Chatham. The junction serves as the northern terminus of the Taconic State Parkway, which connects the spur to the New York City area. About 2 miles (3.2 km) to the southeast is the Canaan toll barrier, which marks the end of the Thruway ticket system. The last exit on the Berkshire Connector is exit B3 for NY 22 just west of the Massachusetts state line in Canaan. The spur continues east to the state line, where it becomes the Massachusetts Turnpike.[11]

Garden State Parkway Connector

The Garden State Parkway Connector is a 2.40-mile (3.86 km) highway that connects the Thruway mainline with the Garden State Parkway at the New Jersey state line at Ramapo via exit 14A.[1] It is designated as NY 982L, an unsigned reference route.[5] The highway begins, in terms of mileposts, at Thruway (I-87 and I-287) exit 14A in Ramapo and heads generally southwestward as a toll-free highway toward the state line. Just north of the state line, the southbound connector meets Red Schoolhouse Road (County Route 41 or CR 41) at a partial diamond interchange.[12] All southbound commercial traffic is forced to exit here as the Garden State Parkway prohibits commercial traffic north of exit 105. Thus, the final 0.31 miles (0.50 km) of the road south of the Schoolhouse Road exit is the only part of the Thruway system that prohibits commercial vehicles.[1][13] The connector continues to the state line, where it becomes the tolled Garden State Parkway.[12]

Other components

The New York State Thruway system also consists of three other components: the Cross-Westchester Expressway, the New England Thruway and the Niagara Thruway. The Cross-Westchester Expressway, part of I-287, begins at I-87 exit 8 in Elmsford, where I-287 splits from the Thruway mainline, and travels east across Westchester County to I-95, with connections to both the New England Thruway and the Connecticut Turnpike at exit 12 in Rye. The New England Thruway (NET) is a 15.01-mile (24.16 km) section of I-95 under the operation and maintenance of the New York State Thruway Authority. It begins at the Pelham Parkway interchange (exit 8) in the Co-Op City section of the Bronx and continues northeastward into Westchester County to the Connecticut state line, where it connects to the Connecticut Turnpike. The Niagara Thruway comprises the first 21.24 miles (34.18 km) of I-190 from I-90 in Buffalo to NY 384 in Niagara Falls.[1]

History

Origins and construction

A toll superhighway connecting the major cities of the state of New York that would become part of a larger nationwide highway network was proposed as early as 1949. The following year, the New York State Legislature passed the Thruway Authority Act creating the New York State Thruway Authority (NYSTA), an independent public corporation, which would build and manage the turnpike. The project was to be financed through toll revenue bonds and self-liquidating by receipt of tolls, rents, concessions, and other income. The act also stipulated NYSTA adopt a hybrid system of tolls, with barrier tolls collected in urban areas, and long-distance tickets issued in rural areas.[14]

The first section of the Thruway, between Utica and Rochester, opened on June 24, 1954.[2] Other sections of the 426-mile (686 km) mainline between Buffalo and the Bronx were completed and opened throughout 1954 and 1955. The last segment, from Yonkers south to the Bronx, was completed on August 31, 1956. The total cost was $600 million (equivalent to $5.23 billion in 2016), financed by the sale of $972 million in bonds (equivalent to $8.47 billion in 2016).[14][15] At the time, it was the longest toll road in the world. In 1957, the mainline was extended 70 miles (113 km) west from Buffalo along Lake Erie to the Pennsylvania state line. From 1957 to 1960, several spurs of the road were built to connect the road to turnpikes in adjacent states. These were the Berkshire Connector which opened on May 26, 1959, which linked to the Massachusetts Turnpike (itself opening eastwards from close to the New York state line on May 15, 1957), the New England Thruway, which connected to the Connecticut Turnpike, and the Niagara Thruway, a spur leading to Niagara Falls.[14]

On August 14, 1957, the Interstate Highway System was established. The segment of the mainline between the Pennsylvania border and the Adirondack Northway in Albany became part of I-90 while the portions from the Northway south to Newburgh and from Elmsford south to the New York City line were included in I-87. The eastern half of the Berkshire Connector also became part of I-90, creating a gap in the I-90 designation around Albany. The entirety of the New England Thruway became part of I-95 while the Niagara Thruway became I-90N, and later I-190.[16][17] The Elmsford–Suffern section of the mainline was designated as part of I-287 by 1960.[17] The last section of the mainline to receive a designation—from Suffern to Newburgh—finally received one on January 1, 1970, when I-87 was realigned to follow the Thruway between the two locations.[18] The highway was unique in that original signage utilized dark blue backgrounds, the same color blue as displayed on the New York state flag. Over time, these signs were replaced with Federal Highway Administration (FHWA)-approved green backgrounds.[14]

System expansion

After the New Jersey Turnpike was built in 1952, the New Jersey Turnpike Authority (NJTA) and NYSTA proposed a 13-mile (21 km) extension of the New Jersey Turnpike that would go from its end (at US 46 in Ridgefield Park, New Jersey, at the time) up to West Nyack at the Thruway. The portion through New Jersey was to be constructed and maintained by NJTA, while the portion in New York was to be built and maintained by NYSTA. The purpose of this extension was to give motorists a "more direct bypass of the New York City area" to New England by using the Tappan Zee Bridge. The extension was to parallel NY 303 and the Conrail-owned River Line, and have limited interchanges, one of which would be with the Palisades Interstate Parkway. By 1970, it became too expensive to buy right-of-way access, and community opposition was fierce. Therefore, both the NJTA and NYSTA cancelled the project.[19]

In 1990, the state of New York sold the Cross-Westchester Expressway (part of I-287) to NYSTA for $20 million (equivalent to $36.3 million in 2016) in an effort to balance the state's budget.[20][21][15] Similarly, in 1991, the Authority was directed to assume the cost of operating and maintaining the 71-mile (114 km) segment of I-84 in New York, which runs east–west from the Pennsylvania state line at Port Jervis to the Connecticut state line at Brewster.[22] The agreement made at this time between NYSTA and the New York State Department of Transportation (NYSDOT) allowed NYSTA to transfer I-84 back to the state at any point after 1996 provided that the Thruway Authority gave NYSDOT a one-year notice.[23] Around this time, state officials also investigated the possibility of having NYSTA take over ownership and maintenance of all or part of New York's Interstate Highways.[24]

Toll elimination and I-84

All tolls along the Thruway were supposed to be abolished when the construction bonds used to build it had been paid off.[24] The last of the bonds were paid off in 1996; however, the tolls remained in place after the New York State Legislature transferred ownership of the New York State Canal System to NYSTA in 1992.[25]

Thruway Authority maintenance sign at onramps on I-84

Roughly one week before the November 2006 elections, NYSTA accepted $14 million from the State Senate in exchange for agreeing to cease the collection of tolls at the Black Rock and City Line toll barriers on the Niagara Thruway (I-190) in Buffalo for one year.[26] On October 30, 2006, NYSTA voted to permanently remove the tolls. Both major candidates in the 2006 gubernatorial election, Democrat and eventual victor Eliot Spitzer and Republican John Faso, had pledged to remove the tolls on I-190 if elected. In order to offset the lost toll revenue, NYSTA also voted to return maintenance of I-84 to NYSDOT,[27] as the annual maintenance cost of I-84 was considered to be equal to the amount of annual revenue generated from the Buffalo toll barriers—approximately $14 million.[28] Under the terms of the 1991 agreement between NYSTA and NYSDOT, maintenance of I-84 would become the responsibility of the DOT on October 30, 2007.[22]

In January 2007, State Senator John Bonacic of Mount Hope began drafting legislation to halt the planned transfer of maintenance of I-84. Bonacic asserted that the Thruway Authority had better maintenance practices than NYSDOT, most notably in the field of snow removal. He also claimed that the DOT lacked the time and money needed to match the quality of maintenance that NYSTA performed on I-84.[26] The senator eventually prevailed as the 2007–2008 budget was modified to allocate additional funding to NYSDOT, which would then pay the Thruway Authority to maintain I-84.[29] A formal agreement between the two agencies was reached on September 19. The one-year agreement cost NYSDOT $11.5 million and took effect October 30, the date I-84 was to become DOT-maintained.[22] The agreement was renewed in April 2008 at a cost of $10.3 million, extending the arrangement through October 31, 2009.[30] It remained in place until October 11, 2010, when NYSDOT re-assumed maintenance of the highway. The change was made in the 2010–2011 state budget in an effort to reduce the cost of maintaining I-84.[31] Governor David Paterson—who included the change in the budget—expected that the state would save $3.9 million annually on maintenance costs.[32]

Other developments

In the late 1970s, NYSTA experimented with all-metric signage in the Syracuse area, such as these signs at exit 35.

In 1964, the New York State Legislature officially renamed the Thruway in honor of Thomas E. Dewey, the Governor of New York at the time of the Thruway's opening. The official designation is, however, rarely used in reference to the road.[33]

In August 1993, NYSTA became the first agency to implement the E-ZPass electronic toll collection system.[14] By December 1996, it was implemented at all of the Thruway's fixed-toll barriers and at exits along the Berkshire Connector and the New York City–Buffalo section of the mainline.[34] E-ZPass was installed at all of the mainline exits by March 1998.[35] On May 14, 2010, a new E-ZPass configuration, consisting of two highway speed E-ZPass lanes in each direction, became operational at the Woodbury toll plaza, with concrete barriers separating the faster traffic from the staffed toll lanes necessary for vehicles not equipped for E-ZPass.[36] A similar project is in development at the Williamsville toll plaza.[37]

In 1999 NYSDOT, the Federal Highway Administration and NYSTA discussed redesignating the Berkshire Connector as I-90 and redesignating the non-toll part of I-90 from Thruway exit 24 to exit B1 as I-88. The Thruway main line would be designated as both I-90 and I-88 between exits 25A and 24, and as I-90 and I-87 from exit 24 to exit 21A. This was never implemented.[38]

When I-84 was built through the Newburgh area in the early 1960s,[39][40] no interchange was built between I-84 and the Thruway. Instead, the connection was made via a short segment of NY 300, which both I-84 and I-87 meet via interchanges.[41] Construction on a direct connection between the Thruway mainline and I-84 began in August 2003.[42] The portion of the exit carrying traffic from I-84 to the Thruway was opened in July 2009. The opposite direction was opened two months later on September 23.[43] The connection allows cars to travel between I-87, I-84 and NY 300 via splits in the ramp.[44]

Services

All of I-90 within New York is designated as the "AMVETS Memorial Highway", as indicated by this sign at the Port Byron service area.[5]

There are 27 service areas along the Thruway, all on the New York–Ripley mainline. The service areas, called "travel plazas" by the New York State Thruway Authority (NYSTA), are spaced roughly 30 miles (48 km) apart and are open at all hours of the day. Two plazas—the Angola service area at milepost 447 and the New Baltimore plaza at milepost 127—are accessible from both directions of the Thruway; the remainder are accessible from only one direction. Each plaza features a gas station and a variety of restaurants, at least one of which is open 24 hours.[45] Free Wi-Fi service was added to all 27 service areas on March 1, 2007.[46]

NYSTA also operates the Thruway Authority Highway Advisory Radio (HAR) system, a network of radio stations across the state that broadcast information on traffic conditions along the Thruway. The system broadcasts at 1610 AM in the Buffalo, Rochester, Albany, Kingston, and Newburgh areas, 1620 AM in the Finger Lakes and Syracuse areas, 530 AM in the New York City metropolitan area, 540 AM in the vicinity of Utica, and at 98.7 FM in Chautauqua County. HAR is also used to broadcast Amber Alerts if one is issued.[47]

Tolls

Collection methods

A New York State Thruway toll ticket obtained at exit 25A

All components of the New York State Thruway system except for the Garden State Parkway Connector and the Cross-Westchester Expressway are tolled in some capacity. The New YorkRipley mainline employs both an open, barrier-based tolling system and a closed, ticket-based tolling system. From the New York City line to the NY 17 exit near Harriman, there are three toll barriers.[48][49] From there northward, a closed system is employed where drivers must obtain tickets which show their point of entry and the cost of traveling from there to their desired point of exit. Upon exiting the Thruway, the ticket must be surrendered and the appropriate toll must be paid.[48][50] Two separate closed systems are used on the Thruway mainline, encompassing all of the mainline between Harriman and the Pennsylvania state line except for a section in and around Buffalo.[48]

The southernmost of the three toll barriers is the Yonkers toll barrier, a bi-directional barrier between exits 6A and 7 in Yonkers. In Tarrytown, there is a southbound-only barrier for the Tappan Zee Bridge. Lastly, there is a northbound, commercial traffic-only barrier in Spring Valley.[49] The closed ticket system originally began at the Spring Valley toll barrier[50] but was moved to exit 16 on March 3, 1974, allowing interchanges along the Thruway in Rockland County to be free of tolls. The toll plaza at Suffern was dismantled along with this change.[51] At Harriman, the longer of the two closed, ticket-based systems begins and extends from NY 17 to just east of exit 50 in Amherst. The Berkshire Connector is enclosed within this ticket system, so traveling between the mainline and the connector via exit 21A does not involve crossing a toll barrier, and the connector's exits up to the toll barrier at exit B3 are listed with the mainline exits on tickets for the major closed system. The other system encompasses the portion of the mainline between exit 56 south of Buffalo and exit 61 near the Pennsylvania state line.[48]

To distinguish between exit 16 and the Woodbury toll barrier, Thruway tickets list the NY 17 interchange as exit 16 and the Woodbury toll plaza as exit 15, although the actual exit 15 is situated almost 15 miles (24 km) to the south.[48] Northbound traffic on I-87 traveling through the Woodbury toll barrier is given a ticket while travelers on southbound I-87 must surrender their ticket and pay the appropriate toll. Traffic heading south on I-87 and exiting at exit 16 must pay the appropriate toll for exit 16 at the Harriman toll plaza. Similarly, traffic heading north on I-87 and exiting at exit 16 must pay a fixed-rate toll at the Harriman plaza. Traffic entering the Thruway from NY 17 east must pay a fixed-rate toll at the Harriman barrier and, if traveling north, collect a ticket at the Woodbury barrier.[51] (However, this latter situation is less likely to occur because traffic on 17 eastbound is most likely headed south towards New York City, because of 17's south-east gradient beyond Binghamton.) The ticket is identical to that given for exit 15 with the exception that the toll for exit 16 is subtracted from all of the prices.[52][53]

Approaching the Williamsville toll barrier on I-90 / Thruway westbound

The other components of the system that are tolled have far fewer tolls. On the New England Thruway (I-95), there is a single, fixed-rate toll barrier on I-95 northbound in New Rochelle. Meanwhile, the only tolls along the Niagara Thruway (I-190) are those for major bridges along the highway, namely the North and South Grand Island Bridges.[49]

Cost

When the Thruway opened in the mid-1950s, the cost to travel from Buffalo to New York City was $5.60 (equivalent to $49.00 in 2016). The closed ticket system, which at the time extended from Spring Valley to Williamsville, accounted for $5 of the toll, while the remaining $0.60 was charged at the Yonkers ($0.10) and Tappan Zee ($0.50) toll barriers.[50][15] As of April 2010, this trip costs $24.60: $18.35 for the closed ticket system from Williamsville to Woodbury, $5 for the Tappan Zee Bridge, and $1.25 for the Yonkers toll barrier.[54] After the south end of the major closed ticket system was moved from Spring Valley to Woodbury, the Spring Valley toll barrier became a fixed-rate toll for both cars and trucks.[51] The toll for cars was removed in July 1997. At the time, the toll was $0.40 (equivalent to $1.00 in 2016).[15][55]

As of April 2010, the Berkshire Connector costs $0.85 to travel between the Massachusetts state line and exit B1. Tolls west of exit B1 vary based on which direction a motorist travels on I-87.[56] The toll on the minor closed ticket system from Pennsylvania to exit 55 south of Buffalo is $3.15.[57] On I-190, the Grand Island Bridges cost $1 to cross while the New Rochelle toll barrier on I-95 costs $1.75 to pass through.[49] The Black Rock and City Line toll barriers on the Niagara Thruway in Buffalo charged $0.75 at the time of their removal on October 30, 2006.[27]

Travel Plazas

The following is a list of travel plazas located on the New York State Thruway. They are open 24 hours daily offering food and fuel:

Angola (East/West Mile-Post 447 between exits 58 and 57A, Erie County)

Ardsley (Mile-Post 6 Northbound, between exits 6A and 7, Westchester County)

Clarance (Westbound Mile-Post 412, Erie County)

Pembroke (Eastbound Mile-Post 397 between exits 48a and 48, Genesee County)

Sloatsburg (Mile-Post 33 Northbound and Southbound, Rockland County)

Modena (Mile-Post 66 between Exits 18 and 17, Ulster County)

Ulster (Mile-Post 96 between exits 19 and 20, Ulster County)

New Baltimore (Mile-Post 127 between Exits 21A and 21B, Greene County)

Malden (Mile-Post 103 Northbound between exits 20 and 21, Ulster County)

Plattekill (Mile-Post 65 Northbound between exits 17 and 18, Ulster County)

Ontario (Mile-Post 376 Westbound between exits 46 and 47, Genesee County)

Seneca (Mile-Post 350 Westbound between exits 44 and 45, Ontario County)

Junius Ponds (Mile-Post 324 between exits 41 and 42, Ontario County)

Warners (Mile-Post 292 Westbound between exits 39 and 40, Onondaga County)

Chittenango (Mile-Post 266 Westbound between exits 34 and 34A, Madison County)

Schuyler (Mile-Post 227 between exits 30 and 31, Herkimer County)

Iroquois (Mile-Post 210 between exits 29 and 29A, Herkimer County)

Pattersonville (Mile-Post 168 between exits 26 and 27, Schenectady County)

Guilderland (Mile-Post 153 between Exits 24 and 25, Schenectady County)

Mohawk (Mile-Post 172 between exits 27 and 26, Montgomery County)

Scottsville (Mile-Post 366 between exits 47 and 46, Monroe County)

Clifton Springs (Mile-Post 337 between exits 43 and 42, Ontario County)

Port Byron (Mile-Post 310 between exits 41 and 40, Cayuga County)

DeWitt (Mile-Post 280 between exits 36 and 35, Onondaga County

Oneida (Mile-Post 244 between exits 33 and 32, Oneida County)

Park/Rest Areas

Park/Rest areas mainly consist of parking lots with some locations having picnic tables.

Exit list

For exits on the Cross-Westchester Expressway, the New England Thruway, or the Niagara Thruway, see the articles on those highways.

Mainline

CountyLocation[58]mi[1]kmExit[1]Destinations[1]Notes
WestchesterYonkers0.000.00 I-87 south (Major Deegan Expressway)Continuation from New York City; southern end of concurrency with I-87
0.480.771Hall Place / McLean AvenueMcLean Avenue only appears on southbound signage
0.921.482Yonkers Avenue Yonkers RacewayNorthbound exit and southbound entrance
1.772.853Mile Square RoadNorthbound exit and southbound entrance
2.183.514 Cross County Parkway / Mile Square RoadMile Square Road only appears on southbound signage
2.704.355 NY 100 north (Central Park Avenue) White PlainsNorthbound exit and southbound entrance; southern terminus of NY 100
4.006.446Tuckahoe Road Bronxville, YonkersSigned as Exits 6E (east) and 6W (west) southbound
5.148.276ARidge Hill Boulevard / Stew Leonard Drive
5.478.80Yonkers Toll Barrier ($1.25 Cash or E-ZPass)[59]
Ardsley7.5812.207 NY 9A ArdsleyNorthbound exit and southbound entrance
Greenburgh10.3316.627A Saw Mill to Taconic ParkwayNorthbound signage; exit to northbound Parkway only; passenger cars only
Saw Mill southSouthbound signage; no southbound entrance; passenger cars only
11.3118.208 I-287 east (Cross Westchester Expressway) White Plains, RyeSouthern end of concurrency with I-287; Rye only appears on southbound signage; left exit southbound
11.8018.998A NY 119 / Saw Mill north ElmsfordSouthbound exit and northbound entrance
Tarrytown12.6520.369 US 9 Tarrytown, Sleepy Hollow
13.0721.03Tappan Zee Bridge Toll Barrier (E-ZPass or Toll-By-Mail, southbound only)[59]
Hudson River14.76[58]23.75Tappan Zee Bridge
RocklandSouth Nyack16.4926.5410 US 9W Nyack, South NyackNo southbound exit
Nyack17.6328.3711 US 9W / NY 59 Nyack, South NyackSouth Nyack only appears on southbound signage
Clarkstown18.7630.1912 NY 303 / Palisades Center Drive West NyackPalisades Center Drive only appears on southbound signage
20.9433.7013N Palisades Parkway north Bear MountainPassenger cars only
13S Palisades Parkway south New Jersey
22.8036.6914 NY 59 Spring Valley, Nanuet
Chestnut Ridge23.5337.8714A Garden State Parkway New Jersey
24.3139.12Spring Valley Toll Barrier ($3.00+, northbound commercial vehicles only)[59]
Ramapo27.6244.4514B Airmont Road (CR 89) Airmont, MontebelloAccess to Good Samaritan Regional Medical Center
Suffern30.1748.5515 I-287 south / Route 17 south New JerseyNorthern end of concurrency with I-287; southern end of concurrency with NY 17
Hillburn31.3550.4515A NY 17 north / NY 59 Sloatsburg, SuffernNorthern end of concurrency with NY 17
OrangeWoodbury45.0372.47Woodbury Toll Barrier
Southern end of ticketed system
45.2072.7416 US 6 / NY 17 HarrimanHarriman Toll Barrier ($1.25 Cash or E-ZPass)[59]
Town of Newburgh60.1096.7217 I-84 / NY 300 / NY 17K Scranton, Newburgh
UlsterTown of New Paltz76.01122.3318 NY 299 Mid-Hudson Bridge, New Paltz, Poughkeepsie
Ulster91.37147.0519 NY 28 Kingston, Rhinecliff Bridge
Town of Saugerties101.25162.9520 NY 32 Saugerties, WoodstockWoodstock only appears on southbound signage
GreeneTown of Catskill113.89183.2921 NY 23 Cairo, Catskill
New Baltimore124.53200.4121B US 9W to NY 81 Coxsackie, Ravena
AlbanyCoeymans133.60215.0121A Berkshire Connector to I-90 east Massachusetts Turnpike, BostonWestern terminus of the Berkshire Connector
Bethlehem134.93217.1522 NY 144 to NY 396 Selkirk
Albany141.92228.4023 I-787 / US 9W Albany, Troy, Rensselaer
148.15238.4224 I-87 north / I-90 east Albany, MontrealLeft exit eastbound; northern end of concurrency with I-87; eastern end of concurrency with I-90
Guilderland153.83247.5725 I-890 / NY 7 / NY 146 Schenectady
SchenectadyRotterdam158.82255.6025A I-88 / NY 7 Schenectady, Binghamton
162.22261.0726 I-890 / NY 5 / NY 5S Schenectady, Scotia
MontgomeryAmsterdam173.59279.3727 NY 30 Amsterdam
Glen182.17293.1728 NY 30A Fultonville, Fonda
Town of Canajoharie194.10312.3729 NY 10 Canajoharie, Sharon Springs
HerkimerDanube210.62338.9629A NY 169 Little Falls, Dolgeville
Village of Herkimer219.70353.5730 NY 28 Herkimer, Mohawk
OneidaUtica232.85374.7431 I-790 / NY 8 / NY 12 UticaRome only appears on westbound signage
Westmoreland243.37391.6732 NY 233 Westmoreland, RomeRome only appears on westbound signage
Verona252.71406.7033 NY 365 Verona, Oneida, RomeRome only appears on eastbound signage; Oneida only appears on westbound signage
MadisonCanastota261.50420.8434 NY 13 Canastota, Chittenango, OneidaOneida only appears on eastbound signage; Chittenango only appears on westbound signage
OnondagaDeWitt276.58445.1134A I-481 Syracuse, Oswego, ChittenangoExit 6 on I-481; Chittenango only appears on eastbound signage; Oswego only appears on westbound signage
278.93448.8935 NY 298 Syracuse, East Syracuse
Salina282.93455.3336 I-81 Watertown, BinghamtonExit 25A on I-81
283.79456.7237Electronics Parkway Liverpool, SyracuseSyracuse only appears on eastbound signage; Liverpool only appears on westbound signage
285.95460.1938 CR 57 Liverpool, Syracuse
Van Buren289.53465.9539 I-690 / NY 690 Syracuse, Fulton
CayugaBrutus304.19489.5540 NY 34 Weedsport, Auburn
SenecaTyre320.41515.6541 NY 414 Waterloo, Clyde
OntarioTown of Phelps327.10526.4242 NY 14 Geneva, Lyons
Town of Manchester340.15547.4243 NY 21 Manchester, Palmyra
Farmington347.13558.6544 NY 332 Canandaigua, VictorVictor only appears on westbound signage
Town of Victor350.99564.8645 I-490 Rochester, VictorVictor only appears on eastbound signage
MonroeHenrietta362.44583.2946 I-390 Rochester, Corning
GeneseeTown of Le Roy378.56609.2347 I-490 / NY 19 Le Roy, Rochester
Town of Batavia390.13627.8548 NY 98 Batavia
Pembroke401.72646.5148A NY 77 Pembroke, Medina
ErieCheektowaga417.27671.5349 NY 78 Depew, Lockport
Amherst419.69675.43Williamsville Toll Barrier
Western end of ticketed system
420.34676.4750 I-290 Niagara Falls
Cheektowaga420.93677.4250ACleveland DriveEastbound exit and westbound entrance
421.57678.4551W NY 33 west Buffalo
51E NY 33 east Buffalo Niagara International Airport
423.19681.0652WWalden Avenue West (NY 952Q) Buffalo
52EWalden Avenue East (NY 952Q) Cheektowaga
424.92683.8452AWilliam Street
West Seneca426.17685.8553 I-190 Downtown Buffalo, Canada, Niagara Falls
427.94688.7054 NY 400 / NY 16 West Seneca, East Aurora
429.47691.1655 US 219 Orchard Park, SpringvilleWestbound signage
Ridge Road Lackwanna, West SenecaEastbound signage
430.51692.84Lackawanna Toll Barrier
Eastern end of ticketed system
Town of Hamburg432.45695.9656 NY 179 (Mile Strip Rd) Blasdell, Orchard ParkOrchard Park only appears on eastbound signage
436.22702.0357 NY 75 Hamburg, East AuroraEast Aurora only appears on eastbound signage
Evans444.87715.9557AEden, Angola
ChautauquaHanover455.54733.1258 US 20 / NY 5 Silver Creek, IrvingAccess to Lakeshore Hospital
Dunkirk467.74752.7559 NY 60 Dunkirk, Fredonia
Town of Westfield485.00780.5360 NY 394 Westfield, Mayville
Ripley494.51795.84Ripley Toll Barrier
Western end of ticketed system
494.92796.5061Shortman Road (NY 950D) Ripley
496.00798.23 I-90 west ErieContinuation into Pennsylvania; western end of concurrency with I-90
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Berkshire Connector

The Berkshire Connector is a closed-ticket system that extends east from the Thruway mainline to the Canaan Toll Barrier.

CountyLocation[58]mi[1]kmExit[1]Destinations[1]Notes
AlbanyCoeymans0.000.00 I-87 north to I-90 Albany, Buffalo
I-87 south New York City
Western terminus
Hudson River0.95[58]1.53Castleton Bridge
RensselaerSchodack6.5810.59B1 I-90 west / US 9 Albany, HudsonWestern end of concurrency with I-90
ColumbiaTown of Chatham15.0924.29B2 Taconic Parkway south to NY 295Northern terminus of the Taconic Parkway
Canaan17.8328.69Canaan Toll Barrier
Eastern end of ticketed system
23.2737.45B3 NY 22 Austerlitz, New Lebanon
24.2839.07 I90 / Mass Pike east BostonContinuation into Massachusetts; eastern end of concurrency with I-90
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Garden State Parkway Connector

The entire route is in Chestnut Ridge, Rockland County. [58]All exits are unnumbered.

mi[1]kmDestinations[1]Notes
0.000.00 I-87 south / I-287 east / New York Thruway south New York City
I-87 north / I-287 west / New York Thruway north Albany
Exit 14A on the Thruway (mainline); access to Nanuet
2.093.36School House Road (CR 41) Chestnut RidgeSouthbound exit and northbound entrance
2.403.86 G.S. Parkway southContinuation into New Jersey
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 "Interchange/Exit Listing with Mileposts". New York State Thruway Authority. Retrieved July 25, 2015.
  2. 1 2 Dales, Douglas (June 20, 1954). "Across The Map". The New York Times. pp. XX21.
  3. Cauchon, Dennis (February 5, 2008). "Drivers to see major toll hikes". USA Today. Retrieved May 31, 2010.
  4. "New York State Thruway Authority". New York State Thruway Authority. Retrieved October 20, 2010.
  5. 1 2 3 4 5 New York State Department of Transportation (January 2012). Official Description of Highway Touring Routes, Bicycling Touring Routes, Scenic Byways, & Commemorative/Memorial Designations in New York State (PDF). Retrieved February 16, 2012.
  6. "History of NY Thruway 1991-2000". Retrieved June 30, 2016.
  7. Wing, J.P. (September 8, 2009). "Improved Thruway Guidance, Part 2: Coinciding with the Interstate Designations". Upstate N.Y. Roads. Retrieved November 18, 2010.
  8. Reference Marker Manual (PDF). New York State Department of Transportation. January 1996. pp. 3–5. Retrieved November 18, 2010.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 14  Template:Yahoo maps is deprecated.Yahoo!; Navteq (April 18, 2010). "overview map of the New York State Thruway mainline" (Map). Yahoo! Maps. Yahoo!. Retrieved April 18, 2010.
  10. "At a transportation crossroad". Times Union. Albany, New York. October 26, 2007. p. 56. Retrieved April 17, 2010.
  11. 1 2 3 4  Template:Yahoo maps is deprecated.Yahoo!; Navteq (April 19, 2010). "overview map of the Berkshire Connector" (Map). Yahoo! Maps. Yahoo!. Retrieved April 19, 2010.
  12. 1 2  Template:Yahoo maps is deprecated.Yahoo!; Navteq (April 19, 2010). "overview map of the Garden State Parkway Connector" (Map). Yahoo! Maps. Yahoo!. Retrieved April 19, 2010.
  13. "Commercial Services: TOPS: Invalid Routes". New York State Thruway Authority. February 15, 2002. Retrieved April 19, 2010.
  14. 1 2 3 4 5 Anderson, Steve. "New York State Thruway". NYCRoads. Retrieved April 21, 2010.
  15. 1 2 3 4 Federal Reserve Bank of Minneapolis Community Development Project. "Consumer Price Index (estimate) 1800–". Federal Reserve Bank of Minneapolis. Retrieved October 21, 2016.
  16. Official route numbering for the National System of Interstate and Defense Highways (Map). American Association of State Highway Officials. August 14, 1957.
  17. 1 2 New York and New Jersey Tourgide Map (Map). Cartography by Rand McNally and Company. Gulf Oil Company. 1960.
  18. State of New York Department of Transportation (January 1, 1970). Official Description of Touring Routes in New York State (PDF). Retrieved April 19, 2010.
  19. Anderson, Steve. "New Jersey Turnpike (I-95)". NYCRoads. Retrieved April 19, 2010.
  20. "Panel Studies New Role For Thruway Authority". The New York Times. Associated Press. May 1, 1991. Retrieved April 19, 2010.
  21. Lynn, Frank (April 7, 1991). "Political Talk". The New York Times. Retrieved April 19, 2010.
  22. 1 2 3 Rife, Judy (September 20, 2007). "Thruway retains I-84 upkeep". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  23. Rife, Judy (October 30, 2006). "I-84 maintenance could be at stake". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  24. 1 2 "Panel Studies New Role For Thruway Authority". The New York Times. Associated Press. May 1, 1991. Retrieved April 22, 2010.
  25. "Highway Robbery on the Thruway". Daily News. New York City. August 20, 1996. Retrieved April 22, 2010.
  26. 1 2 Rife, Judy (January 6, 2007). "Senator Bonacic fights move on I-84 maintenance". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  27. 1 2 Fink, James (October 30, 2006). "I-190 tolls in rear-view mirror". Business First of Buffalo. Retrieved April 22, 2010.
  28. "Don't mince words on I-84 deal". Times Herald-Record. Middletown, Orange County, New York. October 27, 2006. Retrieved April 22, 2010.
  29. Rife, Judy (March 31, 2007). "Bonacic wins war over I-84; Thruway Authority to remain in charge". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  30. Rife, Judy (April 14, 2008). "Thruway Authority gets $10.3M to maintain I-84". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  31. "State DOT to take over maintenance of I-84". Poughkeepsie Journal. August 25, 2010.
  32. Rife, Judy (August 24, 2010). "DOT prepares to resume Interstate 84 care". Times Herald-Record. Middletown, Orange County, New York. Retrieved August 30, 2010.
  33. "Thruway Named for Gov. Dewey; Rockefeller Signs Bill – It Takes Effect in September". The New York Times. February 18, 1964. p. 1. Retrieved August 9, 2009.
  34. "The New York State Thruway: 1991–2000". Thruway Chronology. New York State Thruway Authority. 2002. Retrieved November 18, 2010.
  35. Preston, Jennifer (March 12, 1998). "Installation of E-Z Pass System on Turnpike and Parkway Is Expected to Take 2 Years". The New York Times. Retrieved November 18, 2010.
  36. "Woodbury Mobility Improvement Project". New York State Thruway Authority. Retrieved June 1, 2010.
  37. "About the Project". Williamsville Toll Barrier Improvement Project. New York State Thruway Authority. Retrieved November 18, 2010.
  38. Bergman Associates (February 13, 2008). "Hudson River Crossing Study" (PDF). Capital District Transportation Committee and New York State Department of Transportation. p. 22. Retrieved December 25, 2009.
  39. New York with Sight-Seeing Guide (Map) (1962 ed.). Cartography by General Drafting. Esso. 1962.
  40. New York and Metropolitan New York (Map). Cartography by Rand McNally and Company. Sinclair. 1964.
  41. Newburgh Digital Raster Quadrangle (Map). 1:24,000. New York State Department of Transportation. 1991. Retrieved April 19, 2010.
  42. Rife, Judy (August 27, 2003). "Project to unite I-84, Thruway gets in gear". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  43. Rife, Judy (September 22, 2009). "I-84/87 interchange 90% done". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  44. Rife, Judy (April 13, 2008). "I-84, Thruway soon to meet". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
  45. "Thruway Travel Plazas". New York State Thruway Authority. Retrieved April 19, 2010.
  46. "Thruway Authority Announces Wi-Fi Availability at Travel Plazas" (Press release). New York State Thruway Authority. March 1, 2007. Archived from the original on October 10, 2007. Retrieved April 19, 2010.
  47. "Highway Advisory Radio (HAR) Coverage". New York State Thruway Authority. Retrieved April 19, 2010.
  48. 1 2 3 4 5 "New York State Thruway Toll Schedule" (PDF). New York State Thruway Authority. 2010. Retrieved April 22, 2010.
  49. 1 2 3 4 "Schedule Of Cash Tolls at Fixed Toll Barriers". New York State Thruway Authority. Retrieved April 21, 2010.
  50. 1 2 3 "Collecting The Tolls". The New York Times. June 20, 1954. p. XX10.
  51. 1 2 3 "The New York State Thruway: 1971–1980". Thruway Chronology. New York State Thruway Authority. 2002. Retrieved November 18, 2010.
  52. "Toll and Distance Calculator – From Exit 15A to Exit 19". New York State Thruway Authority. Retrieved November 18, 2010.
  53. "Toll and Distance Calculator – From Exit 16 to Exit 19". New York State Thruway Authority. Retrieved November 18, 2010.
  54. "Toll and Distance Calculator – From Exit 50 to New York City Line". New York State Thruway Authority. Retrieved April 21, 2010.
  55. "Tappan Zee Car Toll To Rise to $3 in July". The New York Times. January 28, 1997. Retrieved April 13, 2010.
  56. "Toll and Distance Calculator – From Massachusetts State Line to Exit B1". New York State Thruway Authority. Retrieved April 21, 2010.
  57. "Toll and Distance Calculator – From Pennsylvania State Line to Exit 55". New York State Thruway Authority. Retrieved April 21, 2010.
  58. 1 2 3 4 5 Office of Technical Services (2014). "Inventory Listing". Engineering Division, New York State Department of Transportation. Retrieved July 25, 2015.
  59. 1 2 3 4 "Fixed Barrier Cash Toll Rates". New York State Thruway Authority. Retrieved October 6, 2014.

External links

Wikimedia Commons has media related to New York State Thruway.

Route map: Bing / Google

KML is from Wikidata
This article is issued from Wikipedia - version of the 11/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.