Second Beijing-Tianjin Intercity Railway

Second Beijing–Tianjin
Intercity Railway
京津第二城际铁路

A CRH3C high speed train at the Tianjin Railway Station.
Overview
Type High-speed rail
Status Under Construction
Locale Beijing
Tianjin
Termini Beijing East
Binhai
Services 1
Operation
Operator(s) China Railway High-speed
Technical
Line length 171.7 km (107 mi)
Track gauge 4 ft 8 12 in (1,435 mm)

Second Beijing-Tianjin Intercity Railway is a new high-speed railway located in China between the municipalities of Beijing and Tianjin. It will start at Beijing East Railway Station to Binhai Railway Station. The first half of this project will be built as part of the Beijing–Tangshan Intercity Railway until Baodi South Railway Station where the line branches south along new trackage to Tianjin. Together with the Beijing-Tangshan ICR, this railways forms part of a proposed regional 4 North-South lines, 4 East-West lines that form a network for fast commuter services across Beijing, Tianjin and Hebei. It is expected to be completed by 2019.[1]

Route

Starting at Beijing East Railway station, this railway goes east across Tongzhou District into Xianghe County, Hebei on to Baodi District, Tianjin. This project then deviates from Beijing-Tangshan ICR alignment to travel south through eastern Wuqing District, Ninghe District, Beichen District, Dongli District to a station at Tianjin Binhai International Airport until terminating in Binhai New Area.

History

References

  1. "京津第二城际铁路走向首次公布 起始通州到滨海". Beijing Times (in Chinese). Gaotie.cn. Retrieved January 16, 2016.
  2. 曹政 (December 30, 2015). "京唐京滨城际先期工程昨开工 明年上半年全线建设" (in Chinese). 北京日报. Retrieved December 30, 2015.

This article is issued from Wikipedia - version of the 9/25/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.