Interstate 69 in Indiana
Interstate 69 | ||||
---|---|---|---|---|
Map of I-69 within Indiana[lower-alpha 1] Completed sections of I-69
Planned and under construction sections | ||||
Route information | ||||
Maintained by INDOT | ||||
Length: | 272.00 mi (437.74 km) | |||
Existed: | 1956 – present | |||
Southern segment | ||||
Length: | 114 mi (183 km) | |||
South end: | US 41 in Evansville | |||
Major junctions: | ||||
North end: | SR 37 in Bloomington | |||
Original segment | ||||
Length: | 157.30 mi (253.15 km) | |||
South end: | I-465 / US 31 / US 52 / US 421 / SR 37 in Indianapolis | |||
Major junctions: |
| |||
North end: | I-69 at Michigan state line | |||
Location | ||||
Counties: | Vanderburgh, Warrick, Gibson, Pike, Daviess, Greene, Monroe, Morgan, Marion, Hamilton, Madison, Delaware, Grant, Huntington, Allen, DeKalb, Steuben | |||
Highway system | ||||
|
Interstate 69 (I-69) has two discontinuous segments of highway in Indiana.
The original 157.30-mile-long (253.15 km) highway, completed in November 1971, runs northeast from the state capital of Indianapolis, to the city of Fort Wayne, and then proceeds north to the state of Michigan (reaching its capital city, Lansing and beyond).
A new 114-mile (183 km) segment in Southwest Indiana presently starts at the interchange with U.S. Highway 41 (US 41) and Veterans Boulevard in Evansville and formerly temporarily ended at US 231 near Crane, Indiana. The section from US 231 to State Road 37 (SR 37) near Bloomington opened on December 9, 2015.[1] The portion of I-69 between US 41 and I-64 is also known as the Robert D. Orr Highway and originally existed as I-164. Opened in phases in 2009, 2012, and 2015, this is the first major Indiana section completed of the planned national extension of I-69 southwest from Indianapolis via Paducah, Memphis, Shreveport, and Houston to the international border with Mexico in Texas.
Route description
The original stretch of I-69 in Indiana begins with an interchange at the northeast corner of I-465, the Indianapolis outer beltway, where Binford Boulevard, a four-lane divided surface arterial that formerly carried SR 37 transitions into the I-69 freeway. Southbound at this junction, most I-69 motorists take exit 200, which was formerly known as exit 0, to remain on a freeway and reach either I-465 south (with SR 37 south and the likely routing of future extended I-69) or I-465 west. Running in a northeasterly direction and concurrent with SR 37, I-69 turns east-northeast at the end of that overlap just past mile marker 205 (formerly marker 5) in Fishers. From there, the freeway turns more easterly through the Campus Parkway/Southeastern Parkway (former Greenfield Avenue and SR 238) interchange and remains on that general heading until it reaches the Pendleton area.
After bypassing Pendleton to the west and north, SR 9 and SR 67 join I-69, which continues to the east-northeast into the Anderson area. There, SR 9 departs, and shortly thereafter I-69 begins two long curves to the northeast, and then the north. Between Daleville and Chesterfield, SR 67 departs I-69, bound for Muncie. From the Anderson–Muncie region, I-69 continues north, running concurrently with US 35 between SR 28 east of Alexandria and SR 22 near Gas City. After passing SR 18 east of Marion, I-69 then heads more northeast, straight toward the Fort Wayne metro area.
At the south junction of I-469, located at Lafayette Center Road near the General Motors truck assembly plant, US 33 joins I-69. US 24 used to be cosigned with I-69 from this point to the interchange at Jefferson Boulevard (originally known as Upper Huntington Road), even though it took travelers on that route several miles out of their way. However, in the mid-2010s, INDOT rerouted & resigned US 24 from its junction with I-469 in New Haven to use the northern leg of that beltway (concurrent with westbound US 30) to I-69, then south on the parent Interstate route to the aforementioned Jefferson Boulevard interchange. Now, eastbound US 24 joins northbound I-69 and US 33 there. US 33 continues on north to the Goshen Road interchange near Coliseum Boulevard on the northwest side of Fort Wayne, where it departs I-69, eastbound US 30 joins, and the freeway curves more to the east once again. The next junction is the US 27/SR 3 interchange at Lima Road on the north side of Fort Wayne. From the mid-1960s to 2001, US 27 was rerouted onto a concurrency with I-69 from here north to the Michigan border, but the route was thereafter truncated to this point as its national northern terminus. Past the next interchange at Coldwater Road, which was the original routing of US 27 north of town, the I-69 freeway curves back to a northerly heading. At the north junction of I-469, both US 30 and the present routing of US 24 now depart to the east along that beltway and shortly thereafter I-69 leaves the Fort Wayne metro area.
I-69 then continues north, passing just to the west of Auburn, Waterloo, and Angola, before reaching the I-80/90 Indiana East–West Toll Road near Fremont. Very shortly thereafter, the route crosses into the state of Michigan at a point just northwest of Fremont.
The portion of I-69 between Indianapolis and the Toll Road was first proposed in the seminal report Interregional Highways, released in January 1944. By March 1946, it was formally made part of the new National System of Interstate Highways by the U.S. Public Roads Administration. In 1958, its first extension was approved.[2] This took the route into Michigan in order to connect with I-94 near Marshall. It was extended yet again, north to Lansing in the 1960s, and then east — first to Flint and finally to the border with Canada at Port Huron, Michigan — in the 1980s. The extreme southern portion of I-69 from I-465 to central Indianapolis was never built, though unpaved ghost ramps and overpasses for its connection to I-65 and I-70 can still be seen at the North Split/Spaghetti Bowl interchange just northeast of downtown Indy.
Configuration
Until recent years, all of I-69 in Indiana north of the Indianapolis metro area was four lanes, but INDOT has reconstructed and widened I-69 to six lanes through most of the Fort Wayne metro area. At the north end of that section, a new Single-Point Urban Interchange (SPUI) was built in 2012 at Union Chapel Road (Exit 317) to serve the then-new Parkview Regional Medical Center campus.
Likewise, INDOT has widened I-69 from I-465 on the northeast side of Indianapolis to SR 37 in Fishers from the original six lanes to seven then eight through lanes. A complete rebuild of most of this highly congested segment was originally hoped to be completed by 2015, with project plans calling for a total of 14 lanes (eight for the mainline and six in parallel collector-distributor lanes).[3] However, plans changed with a project called Operation Indy Commute, which resulted in the adding of one travel lane each direction in the median, auxiliary lanes being built to connect all existing entry & exit ramps between 82nd Street and 116th Street, plus the braiding of ramps at the wye junction with SR 37. This project was completed by the end of 2015. In 2016, a new interchange in this section at 106th Street (Exit 204) was being constructed, with an opening to traffic now scheduled for sometime in December 2016 (with final landscaping work extending into 2017). This project is unique in that it features a large, oval-shaped roundabout centered above I-69 to replace the former simple 2-lane bridge overcrossing. Also beginning in 2016, and scheduled for completion in late fall of 2017, is a project to add a third travel lane in the median for each direction between 116th Street and SR 38 near Pendleton, as well as to totally rebuild the Campus Parkway/Southeastern Parkway junction (Exit 210) as a Divergent Diamond Interchange (DDI) without necessitating its closure to traffic.
Services
Originally, there were seven rest areas and two weigh stations located along the original length of I-69 in Indiana. Of those, only four rest areas and one weigh station remain open as of late 2012. The Pipe Creek Rest Areas serve northbound and southbound travelers in Delaware County near mile marker 250 (formerly marker 50). Totally rebuilt in 2008, these areas also serve motorists on US 35, which is concurrent with I-69 along this stretch of freeway.[4][5] Near mile marker 280 (formerly marker 80) in Huntington County, there were originally twin weigh stations for commercial vehicles; however, only the southbound facility is still used. Also in Huntington County, the northbound Flat Creek Rest Area once served those heading north near original mile marker 89 (now marker 289), but joined its southbound companion (which had closed in January 2009 and was located a couple miles to the north in Wells County, just south of the Wells–Allen county line near mile marker 292) on the list of permanently closed rest stops by late 2012.[6] These areas were closed due to their age, cost of maintenance and operation, as well as their relative proximity to the Fort Wayne metro area. Two other rest areas just north of that city in DeKalb County were also closed by 2001 for similar reasons. There the twin Cedar Creek Rest Areas once served northbound and southbound traffic near original mile marker 123 (now marker 323). In July 2011 it was reported that INDOT had begun building a new northbound facility at that location.[7] In November 2012, it replaced the aforementioned Flat Creek northbound rest area further to the south, which closed upon completion of this new facility at the Cedar Creek site. Finally, between Fort Wayne and the Michigan state line the Pigeon Creek Welcome Center serves southbound motorists in Steuben County near mile marker 345 (formerly marker 145).[8]
History
Pre-Construction (1940s-1950s)
In the 1944 study titled Interregional Highways and again, in 1947 when the original Interstate routes were first officially designated, Interstate 69 had its northern terminus listed as the Indiana East-West Toll Road. But in 1956, highway officials of the state of Michigan approached their Indiana counterparts about extending I-69 north from the Toll Road and into their state along the route of US 27 to reach the proposed I-94 near Marshall. After some further studies, both states requested this change and the U.S. Bureau of Public Roads (USBPR) approved their proposal on January 21, 1958, making the Michigan state line the new northern terminus of I-69 in Indiana and moving its national terminus permanently into the Wolverine State.[9]
The original southern termination point of I-69 was to have been located at the northeast corner of the inner loop (now known locally as the I-65/I-70 "North Split" interchange) near 13th and College Avenue in Indianapolis. Preliminary routing of the highway from SR 38 near Pendleton to Indianapolis had it generally following the SR 67 corridor southwest, joining I-70 near German Church Road on the east side of Marion County, where the two routes would then be cosigned into the city. Later route location studies in 1961 recommended a different path, heading generally west from Pendleton to SR 37 near Fishers, then southwest past the Indianapolis outer beltway concurrent with the new location of that state route (now known as Binford Boulevard). Once well into the city, it would turn south to cross Fall Creek and meet up with the inner loop at its northeast corner.[9] In fact, the grading and overpasses for this never-built connection's ramps can still be seen at that location.
However, in 1962 the USBPR ruled that it would only approve funding for I-69 to be built to the first Interstate highway connection in the Indianapolis area, which was the I-465 outer beltway near Castleton. State officials later sought to designate the proposed Northeast Freeway connecting that I-69/I-465 interchange to the North Split interchange, approximately 11 miles (18 km) in length, as Interstate 165 in order to get around this initial ruling. But after a political fight over the inner-city portions of I-70 and I-65 (part of the national freeway revolt), it was eventually decided in the late 1970s to scrap the Northeast Freeway altogether. In its place, the state was allowed to use Federal funds to widen I-70 from its original six lanes to eight and ten lanes as well as to rework its east side interchange with I-465 in order to handle the additional traffic loads from I-69 and the northeastern suburbs it serves.[9]
Construction (1960s-1970s)
Like all Interstate highways in Indiana, the original I-69 was constructed in segments which when all were complete, made up the route we know today. There were eleven segments in the Federally-approved original route between I-465 in the Castleton neighborhood of northeastern Indianapolis and the Michigan state line.[10]
The first section of Interstate 69 to be completed in Indiana was the 10.16 miles (16.35 km) stretch in {Allen County, Indiana|Allen County]] around the west and north sides of Fort Wayne between the former Upper Huntington Road (now Jefferson Boulevard), which then carried US 24 and SR 37, and Coldwater Road, which at the time was US 27 (later SR 327, but now neither). This initial portion of I-69 freeway opened to traffic on October 23, 1962. The eleventh and final segment (of the original route) to be completed was the 5.05 miles (8.13 km) stretch between the north leg of I-465 in Indy and the split with SR 37 at Fishers, which fully opened to traffic on November 16, 1971.[10]
Expansion of I-69 on a National Scale (1990s and beyond)
Long after the route's original completion, I-69 was divided into a number of sections of independent utility (SIUs) dealing with a proposed extension of the freeway to the Mexican border in Texas. The original 157.30 miles (253.15 km) section of I-69 in Indiana in its entirety is now part of SIU 1.
When the United States Congress enacted the Intermodal Surface and Transportation Efficiency Act in the mid-1990s, it established High Priority Corridors 18 and 20. Together these corridors mandate the construction of an Interstate highway from Port Huron, Michigan to Brownsville, Texas. The new highway was designated Interstate 69. The routing of the highway has proven to be controversial in Indiana, as it was to become a planned toll road in southern Indiana called Southern Indiana Toll Road, or SITR. After nearly 10 years of studies and close coordination between the Federal Highway Administration, Army Corps of Engineers, Environmental Protection Agency, and the Indiana Department of Transportation, the final route for I-69 between Indianapolis and Evansville was announced in March 2004. At that time it was still uncertain when the extension would be built, since no funds were available to construct the $1.8 billion highway. Nonetheless, the Federal Highway Administration and the Indiana Department of Transportation have been extremely methodical in the environmental studies required for the SITR to be built. State and federal highway officials opted to use a two-tier environmental study along with close coordination with the Army Corps of Engineers, the Environmental Protection Agency, and other state and federal agencies to ensure the proposed route can withstand any legal challenge that may be brought forth by opponents. While officials have performed studies on dozens of possible alignments over the past 30 years, the most recent round of environmental studies for the SITR have been ongoing since 1992.
SIU 1
SIU 1 includes the entire length of I-69 in 1998, from the I-465 interchange on the northeast side of Indianapolis north to Lansing, Michigan, then east to Port Huron, Michigan. It was built in stages between 1956 and 1992, with the final gap between Charlotte, Michigan, and Lansing being closed on October 22, 1992. When the national I-69 extension project was conceived, SIU 1 was already long completed, so all future work in this segment of the "new I-69" would be limited to mainline upgrades and operational improvements.
Post-Construction Improvements
A major project in the Fort Wayne metro area began in 2002, resulting in an additional travel lane in each direction, bridge and pavement reconstruction, and interchange reconfiguration. Plans for SIU 1 also included spot improvements and pavement rehabilitation to the I-469 loop around Fort Wayne and additional mainline and interchange improvements to I-69 northeast of Indianapolis.[3] INDOT also plans to widen 14 miles (23 km) of I-69 from four to six lanes from the SR 37 split at Fishers to the SR 38 interchange in Anderson, starting in 2015, with the project scheduled for completion in 2017.[11] A new interchange at 106th Street in Fishers is scheduled to be completed in November 2016.[12]
SIU 3
From Indianapolis, Interstate 69 is planned to follow the route of SR 37 south via Martinsville to Bloomington, Indiana, where a new terrain routing to the southwest will serve the Crane NSWC, Washington, and Oakland City, Indiana. The route will then intersect I-64 (where SIU 3 ends) and encompass most of existing I-164 through the Evansville, Indiana, area, crossing the Ohio River a few miles upstream of the existing US 41 bridges (SIU 4) near its confluence with the Green River.
Tier 1 studies
The Indiana Department of Transportation (INDOT) has been highly methodical in its analysis and mitigation of the potential environmental impacts associated with the planned I-69 extension through southwest Indiana. As such INDOT has taken a two-tier approach to completing the environmental documentation required for construction to proceed. During the Tier 1 studies, 14 route alternatives were analyzed and compared against the "No-Build" option. Of these alternatives, nine were eliminated from consideration as either having too great of an impact on the natural and human environment, failing to achieve the stated goals established for the I-69 extension, or both. The five alternatives that remained were as follows:
Alternative 1 ran from US 41 to Terre Haute and along I-70 from Terre Haute to Indianapolis. This alternative was favored heavily by Terre Haute. Alternative 2 used US 41 to Vincennes and SR 67 from Vincennes to Indianapolis; it was favored by Princeton and Vincennes. Alternative 3 was one of the two mostly overland routes along SR 57, then cutting cross country on an alignment that roughly follows SR 45, to SR 37 near Bloomington and using SR 37 to Indianapolis. This proposal was largely Supported by the Evansville area but significantly opposed by Bloomington. A modified version of Alternative 3 is the current path of I-69's construction.
Alternative 4 followed SR 57 to US 231 near Bloomfield and US 231 from there to Spencer. Next it went cross country to Martinsville, followed SR 37 from Martinsville to Indianapolis, or continuing north to I-70; I-70 to Indianapolis. This concept had more support from the Hoosier Hills Area. Alternative 5 was the last studied and used SR 57 to US 50 bypass just south of Washington. Afterwards, it followed US 50 eastward through Daviess and Martin counties to SR 37 just east of Bedford and then SR 37 from Bedford to Indianapolis. This alternative was favored mainly by Bedford.
In 2003, INDOT presented the Tier 1 EIS to the Federal Highway Administration, which identified Alternative 3C (following SR 37 between Indianapolis and Bloomington, then over new terrain to US 231 north of Crane Naval Surface Warfare Center, then following SR 57 south-southwest to the I-64/I-164 interchange northeast of Evansville) as the least environmentally damaging practical alternative. Subsequently in March 2003 the FHWA issued a Record of Decision approving the Tier 1 EIS for SIU 3.
in November 2005, Governor Mitch Daniels announced the Major Moves initiative, which would raise billions of dollars for transportation projects by leasing the Indiana East–West Toll Road. Legislation enacted in March 2006 authorized Governor Daniels to lease the Indiana Toll Road to a joint-venture between Macquarie Infrastructure Group and Cintra for $3.8 billion. The same legislation also authorized a similar public-private partnership for design, construction, and operation of 117 miles (188 km) of Interstate 69 between Martinsville and Evansville as a toll expressway. This comes following new highway legislation by Congress in January 2006 that allocated over $58 million to upgrade Indiana 37 to a full expressway from Indianapolis to Bloomington, regardless of what happens with I-69.
Nearly 15 years of environmental studies wrapped up on both the toll and free sections of the I-69 extension between Indianapolis and Evansville in 2006; the project was still being considered as a toll road by then. Project engineers and designers were by then identifying exact placement of interchanges, bridge structures, and connecting roads. In June 2006, officials revisited their decision from the Tier 1 EIS to account for the effects of tolling on the route, preparing a Tier 1 reevaluation report that concluded that the previously selected route remained the preferred alternative, even with tolls; the report was approved by the Federal Highway Administration in the fall of 2006.
In October 2006 Democratic State Representatives David Crooks and Trent Van Haaften proposed revising Major Moves legislation to make the entire 142-mile (229 km) length of I-69 between Evansville and Indianapolis as part of the Southern Indiana Toll Road. Under their proposal the SITR would be operated by either the Indiana Department of Transportation, or a public authority to be established by future legislation. Additionally, the proposal calls for the SITR construction bonds to be paid off 30–40 years following the road's completion, at which point the tolls would be removed.[13]
On November 9, 2006, Governor Daniels announced that I-69 between Evansville and Indianapolis will be built as a toll-free route, effectively canceling plans for the Southern Indiana Toll Road.[14]
Tier 2 studies and lawsuits
Studies
During Tier 2 studies, INDOT further divided SIU 3 into six smaller segments, allowing work on each subsegment to proceed at its own pace. On December 21, 2006, INDOT announced completion of the Tier 2 draft EIS[15] for the 13-mile (21 km) section between I-64 and SR 64 near Oakland City. Officials further noted that they will accelerate the final EIS and construction on the southernmost two-mile (3.2 km) section from I-64 to SR 68 to facilitate access to the Toyota's Princeton plant.[16] On April 30, Governor Daniels signed the state's two-year $26 billion budget, which includes $119 million to fund construction of the southernmost segment of I-69, ensuring that construction began as scheduled in the summer of 2008. The Final EIS for the southernmost section was issued on October 22, 2007.
On February 10, 2008, INDOT and the FHWA issued the Tier 2 Draft EIS for two sections from Oakland City to Crane, totaling 55 miles (89 km). Of the changes to the original alternative, the DEIS extends the bridge over the Patoka River from 500 to 4,400 feet (150 to 1,340 m) to minimize damage to the river and adjacent wetlands. Construction on two rural interchanges would be postponed to free up $30 million for the extended bridge. INDOT released the 5,000-page Tier 2 FEIS for Section 3 from US 50 in Washington to US 231 near Crane on December 10, 2009. The ROD for Section 3 was issued in March 2010 and construction began in April 2010. The ROD for Section 2 (Oakland City to Washington) was issued in May 2010. In May 2010, Governor Daniels announced plans for I-69 to be open from I-64 to Bloomington by 2014 (Sections 1 through 4).
Lawsuits
Opposition groups, including various community groups and local governments, cited environmental issues and the cost of extending I-69. In some instances, opponents of the Southern Indiana Toll Road have resorted to extreme democratic actions to protest the I-69 extension, including petition signing by more than 144,000 Hoosiers along the proposed I-69 corridor and mass mailings of opposition to Indiana Gov. Mitch Daniels. Other acts of protest included the vandalizing of the Indiana State Capitol by protesters who spray-painted "I-69 is the enemy" and "No I-69" on the side of the limestone building. In 2005, environmental extremists opposed to the extension set fire to I-69 project offices near Bloomington. In 2007, a group performed a mock eviction of the I-69 project office in Oakland City.
However, there have been mixed opinions of the project. The most recent routing was strongly opposed in Bloomington and Martinsville, while there is strong support in Evansville and Washington. The United States Navy also supports the current routing because it will provide access to the Crane Naval Surface Warfare Center. The proposed route has also been opposed by some national environmental groups such as Friends of the Earth, the Earth Liberation Front, and Roadless Summer. The new route was also supported by the Teamsters union, which represents many truck drivers, the American Trucking Association, and several trade unions representing the construction industry. The route has also pitted cities, towns, and counties against one another. Bloomington and Martinsville both oppose upgrading State Road 37 to Interstate 69. The greatest support for I-69 is in Indiana's far southwestern counties and Evansville, while the greatest opposition is between Bloomington and Indianapolis. Since the southwest corner is the only region not served by an interstate highway to Indianapolis, officials here allege that highway opponents are blocking I-69 construction in an attempt to further isolate this region from the remainder of the state. To the west, communities along US-41 favor the presently selected alignment in lieu of the only other feasible routing: I-70 to Terre Haute, then US-41 south to Evansville.
After the signing of Major Moves, highway opponents immediately filed two lawsuits to block the toll road lease legislation, arguing it violated the Indiana State Constitution. Among the arguments the plaintiffs contested that funds generated from the sale of a state public works asset must go to the state's General Fund (though the legislation does not sell state assets, but rather leases maintenance and operation of them). However, the underlying reason driving this lawsuit was the fact that Major Moves legislation provided the I-69 extension with a funding source, and also authorized the state of Indiana to hire a private firm to design, build, and operate the Martinsville-Evansville I-69 segment as the Southern Indiana Toll Road. In May 2006, St. Joseph County Superior Court Judge Michael Scopelitis issued a ruling declaring it a public suit (one that questions a public improvement) and as such required the plaintiffs to post a $1.9 billion bond to continue the suit. In response plaintiffs appealed the ruling to the Indiana Supreme Court, which upheld the lower court's ruling. With no means for the opposition to post the bond, Major Moves, and thus the proceeding of the Southern Indiana Toll Road, took effect with the closing of the deal at 12:00 noon (local time) on June 29, 2006.
On October 3, 2006, protest groups, citing environmental concerns, along with six individuals who live along the I-69 corridor, filed a lawsuit in federal court, alleging that state and federal agencies "rigged" environmental studies and violated several federal laws in the selection of a new-terrain route for I-69. They further pressed the court for a summary ruling directing the FHWA and INDOT to route I-69 over I-70 and US 41. Judge David Hamilton disagreed, and on December 10, 2007, he issued a 58-page ruling upholding the selected route for I-69 and the Tier 1 ROD. His ruling did, however, leave open the possibility that the FHWA and INDOT may be forced to reconsider some or all of the previously-rejected Tier 1 alternatives if there are new significant findings during the Tier 2 studies that were absent from the Tier 1 EIS. Barring any new major findings in the Tier 2 studies, Judge Hamilton's ruling paved the way for construction to begin on the southernmost segment.
These small protest groups have sworn to do everything possible to stop its construction. Especially active is a group called Roadblock Earth First which has been responsible for a number of incidents in Oakland City and at a Haubstadt asphalt yard given the contract for the first segment. [17][18]
Opponents launched a second challenge to the routing of the new I-69, filing a lawsuit with the US District Court in Indianapolis on October 3, 2006. Members of three environmental groups and six residents allege INDOT, FHWA, the Fish and Wildlife Service, and Army Corps of Engineers "rigged" the environmental studies to support the planned alignment, officially known as Alternative 3C. In fact, INDOT has already studied the proposed Evansville to Bloomington to Indianapolis corridor and they already concluded the route was not "feasible for tolling." The fact that the environmental studies are still ongoing will make opponents' case in court likely to be dismissed, since there is no Record of Decision finalizing the presently proposed route. Immediately following the filing of the lawsuit by Citizens for Appropriate Rural Roads, the Environmental Policy Center, and six residents, rumors began circulating that the Teamsters and the American Trucking Association were preparing to lead a countersuit to prevent opponents from derailing the project. While Governor Daniels withdrew toll road plans in lieu of a toll-free I-69 in late 2006, the lawsuit to block the I-69 through southwest Indiana was subsequently thrown out by U.S. District Judge David Hamilton in December 2007. Judge Hamilton ultimately dismissed the suit on October 22, 2007, allowing construction of I-69 to proceed, but by this point the SITR plan had been abandoned in lieu of a toll-free I-69 extension.
Construction begins
On December 12, 2007, the FHWA issued its ROD giving final federal approval for construction to begin on the section between I-64/I-164 and SR 64 near Oakland City.[19][20] INDOT awarded the first SIU 3 construction contract to Gohmann Asphalt and Construction Company of Sellersburg, Indiana, on February 6, 2008. This contract, completed on May 31, 2008, included the removal of buildings and vegetation from the I-69 right-of-way between I-64 and SR 68. Gohmann also won the construction contract for the first two miles (3.2 km) from I-64 to SR 68 with a $25 million bid. Construction began with a groundbreaking ceremony in Evansville on July 16, 2008. INDOT built this first section of the extension of I-69 using the design-build method.[21][22] Crews had completed most of the utilities relocation work and earthworks for I-69 between I-64 and SR 68 by September 6, 2008.
The first open segment
On September 29, 2009, the first two miles (3.2 km) of the I-69 extension opened when traffic was shifted from the short segment of SR 57 between I-64 and SR 68 to the portion of the new I-69 route mentioned above. There was some initial confusion as the shift and detour were unannounced and poorly signed initially. This resulted in numerous accidents when motorists either drove through the dead end on the old SR 57 or inadvertently ended up in opposing lanes of traffic on I-164 in the days following the I-69 opening. State troopers directed traffic through the new I-69 segment until crews could install additional signage to more clearly mark the new route.[23] The former SR 57 roadway between SR 68 and I-64 was closed off with a cul de sac and now serves as a local access road.
While the new section of I-69 continues the I-164 exit numbering (its mileage roughly coincides with that for future I-69, depending on the exact alignment of the Ohio River Bridge and its connection to I-164 in SIU 4), it is signed as I-69 and not as a northward extension of I-164.
Sixty-four additional miles opened
The remaining mileage in Section 1, along with all of Section 2 and Section 3, for a total of 64 miles (103 km) from SR 64 to US 231 near the Crane NSWC, was opened to motorists on November 19, 2012.[24]
Current construction status
Section 4, from Crane to SR 37 in Bloomington, approximately 27-mile (43 km) in length is completed, and opened to traffic on December 9, 2015.[25] Construction on Section 5 to upgrade SR 37 through Bloomington to Martinsville to Interstate standards is also underway and is scheduled to be completed by the end of 2017.[26]
Section 6
The routing of I-69 Section 6 from Martinsville to Indianapolis was under study by INDOT, with five candidate "finalist" routes having been selected from nearly two-dozen options. On March 30, 2016, INDOT announced that I-69 would complete its journey to Indianapolis following the current right-of-way of the IN-37 expressway. The interstate will be constructed along the path of IN-37 from Martinsville through the Center Grove area, connecting with Interstate 465, which would be the northern terminus of the new stretch of highway. INDOT reported that studies have shown that this routing would reduce crashes and congestion the most, impact less forest and farm acreage, and results in the greatest decrease in travel time. The SR-37 routing also reduces the cost of the project by eliminating the need for a costly bridge over the White River between Martinsville and I-465. The path also impacts the most businesses, which had been a concern raised by Martinsville residents, business owners and lawmakers.[27]
Financing construction
To fund construction of this extension, Indiana Governor Daniels introduced a proposal known as "Major Moves" in early 2006. It provided $700 million from the Indiana Toll Road lease to be used to complete nearly 20 years of environmental studies and construct about half of the proposed extension (between the I-64/164 interchange and the Crane Naval Surface Warfare Center). It also allowed for the construction of 117 miles (188 km) of the 142-mile (229 km) I-69 extension to Evansville to be constructed as the Southern Indiana Toll Road. Due to ongoing controversy over making this portion of the extension a toll-road, the governor announced in November 2006 that the entire stretch of the highway would be toll-free, subject to construction of the Indiana Commerce Connector (SIU 2).[28] Officials with the INDOT have since stated that I-69 will be toll-free regardless of whether or not the Indiana Commerce Connector is constructed.[29] Additionally, the U.S. Congress allocated an additional $14 million in the 2005 SAFETEA-LU authorization to construct I-69 Evansville to Indianapolis.[30][31]
The 2014-2015 Indiana State budget will place $400 million in a "Major Moves 2020" fund, some of which will go towards completing I-69.[32] INDOT and the Indiana Finance Authority released a request for qualifications on May 23, 2013[33][34] for a public-private partnership agreement to complete the 26 miles (42 km) of Section 5 of SIU 3, with four proposals shortlisted on July 31, 2013.[35] When SIU 3 and the Indiana portion of SIU 4 are completed, I-69 will be approximately 340 miles (547 km) in Indiana.
Designation extension
In April 2010, the Indiana Department of Transportation (INDOT) petitioned the Federal Highway Administration (FHWA) and the American Association of State Highway and Transportation Officials (AASHTO) to change the designation of the I-69 extension from "Proposed Route 69" to "Interstate 69", citing that two miles (3.2 km) of the extension is already open to traffic, and a total of 107 miles (172 km) out of 183 miles (295 km) from the southern terminus of the original I-69 to the Ohio River near Evansville will be open by the end of 2012. Such a move would allow INDOT to erect I-69 signs on portions of I-465 between the current interchange with I-69 in the northeast and the proposed interchange on the southwest, and reset reference posts (RP) and renumber exits and reference posts on the original section north of Indianapolis (starting with RP 200 instead of the then-current RP 0).[36] As of late 2012, the latter task has been accomplished.
SIU 4
I-69 follows the former I-164 south from I-64 to the Ohio River near Green River Road (exit 3 on I-164). The plan was to have I-69 continue south (instead of turning west with I-164) for approximately three miles (4.8 km) before crossing the Ohio River on a new bridge between Evansville and Henderson, Kentucky, near the mouth of the Green River. This portion of the route has not yet been funded, as construction of the new Ohio River crossing and new roadway on the Kentucky side is expected to cost approximately $800 million. Indiana and Kentucky officials had said construction on the new Ohio River Bridge would not begin until at least 2020, after two new crossings near Louisville were completed.[37] With Indiana then preparing to break ground on SIU 3, Kentucky officials indicated that collecting tolls might be the only feasible option for completing the I-69 bridge, as traditional federal and state funding for such projects were drying up. As of February 2013, neither Kentucky nor Indiana officials have yet come up with the funding for the I-69 bridge.[38]
At the October 18, 2013, AASHTO meeting, an INDOT request for redesignation of 20.70 miles (33.31 km) of I-164 to I-69 between US 41 and I-64 was approved, pending concurrence from the FHWA.[39] Signage was changed to I-69 beginning the week of November 17, 2014.[40]
Future
SIU 2
This segment will most likely incorporate the existing I-465 beltway around Indianapolis, using the east and south legs of I-465 to a point at or just west of the SR 37/Harding Street interchange on the southwest side of the Circle City. Much of this stretch of I-465 was reconstructed during the first decade of the 2000s, with additional improvements scheduled for the 2010s, totally independent of the I-69 extension project.
On November 9, 2006, Governor Mitch Daniels announced plans for a 75-mile (121 km) outer loop around Indianapolis to be known as the Indiana Commerce Corridor (ICC). As proposed, that route would have been 100% privately funded, with a portion of the revenues possibly applied to constructing I-69 from Indianapolis to the Crane Naval Surface Warfare Center (NSWC). The remaining portion of the highway to Evansville, Indiana, was already funded with funds from the Major Moves initiative.[28][41] Strong opposition from local residents and the then-Democrat-controlled House of Representatives forced Governor Daniels to abandon the ICC plan on March 24, 2007, although House Democrats assured southwest Indiana residents that this decision would not affect construction on I-69 between Indianapolis and the Crane NSWC.[42][43]
On October 24, 2007, INDOT announced a $600 million plan to reconstruct the I-69/I-465 interchange on the northeast side of Indianapolis, that includes widening about eight miles (13 km) of I-69, I-465, and Binford Boulevard. Environmental studies and design work are underway, and construction on the I-69 portion of the project was expected to begin in 2012.[44]
As of November 2014, there is no timeline for funding or construction of any new-terrain sections within SIU 2.[45]
Controversy
The routing for SIU 3 of I-69 in Indiana has been particularly controversial. The planned extension to Evansville has pitted cities, towns, and counties against one another. The greatest support for an extended I-69 is in Indiana's far southwestern counties and Evansville, while the greatest opposition is between Indianapolis and a vocal minority based in Bloomington. Some in Bloomington and Martinsville oppose upgrading SR 37 to I-69, while still several others welcome this improvement. This has led to Southwestern Indiana communities accusing highway opponents further north of trying to isolate this region from the rest of the state by blocking construction of a direct highway link to Indianapolis. To the west, communities along US 41 favor the selected alignment in lieu of the only other feasible routing: I-70 to Terre Haute, then US 41 south to Evansville. Regardless of the I-69 routing, an Interstate-quality bypass is slated to be built east of Terre Haute, which preferred the I-70/US 41 routing over the selected routing of I-69 for purely local economic reasons.
INDOT, current and past governors, and businesses and elected officials in Evansville and adjacent southwest Indiana communities, have favored a direct route via Bloomington that would be built over new terrain from Bloomington to Evansville. Supporters argued that this direct route reduces the travel time to Indianapolis as well as improves access to Bloomington for residents of southwestern Indiana, something a route via Terre Haute would not achieve. INDOT officials have also pointed out that SR 37 will eventually be upgraded from a four-lane expressway to full freeway status, with or without I-69. After extensive review of the alternative routes as well as detailed environmental studies, the state selected the new terrain route via Bloomington.
Environmentalists claimed the construction of I-69 will lead to the destruction of 1,500 acres (6.1 km2) of forest and more than 300 acres (1.2 km2) of wetlands.[46] The route selected as of 2010 passes through the Patoka River National Wildlife Refuge but on a corridor that the federal government purposely did not acquire for the refuge. This was because of an agreement with the state not to dispute the passage of a highway on this corridor.[47] Environmental groups then filed suit in federal court on October 2, 2006, to block further study and construction of the route,[48] but this lawsuit was dismissed by U.S. District Judge David F. Hamilton on December 12, 2007, clearing the way for construction to begin in 2008. Opponents had considered appealing Judge Hamilton's ruling to the U.S. Court of Appeals for the Seventh Circuit (which could have possibly sent the case to the Supreme Court of the United States), but they ultimately abandoned further legal challenges to the proposed route. Instead, opponents tried to block construction through the legislative process, when Democrats in the Indiana House of Representatives stripped funding for the I-69 extension in their version of the 2008 two-year state budget. Money for I-69 was restored after budget negotiations with the Republican-controlled Indiana Senate.
Another area of controversy arose in late 2005 when governor Mitch Daniels proposed levying tolls on the highway to finance its construction, either as a state project or a public-private partnership, in order to accelerate the project. As the route would overlay the existing SR 37 between Bloomington and Indianapolis, and there is no other free alternative route between Bloomington and Martinsville, this proposal has raised concerns among local residents and businesses. In March 2006, Daniels signed a bill known as "Major Moves" that leased the Indiana East–West Toll Road, but also included a compromise on constructing I-69 in southwest Indiana. As part of the deal, the legislation permitted the Governor to enter a similar public-private partnership for construction of 117 miles (188 km) of I-69 as the Southern Indiana Toll Road from Martinsville to the I-64/I-164 interchange, while the remaining 25 miles (40 km) from Martinsville to the I-465/SR 37 interchange in Indianapolis would remain toll-free. On June 20, 2006, the Indiana Supreme Court rejected a legal challenge brought on by I-69 opponents, upholding Major Moves legislation in a 4–0 decision. The toll road option was highly unpopular, even among many who supported the extension via Bloomington. As a result, Governor Daniels announced in December 2006 that I-69 through southwest Indiana would be toll-free.
Protests
While Citizens for Appropriate Rural Roads had continued to rally crowds of opponents to appear at public hearings until it was apparent that their voice did not reflect the wishes of the majority of impacted Hoosiers,[49] other organized protestor group conducted acts of vandalism, ranging from spray-painting graffiti on the Indiana Statehouse in June 2005;[50] to attempted arson at the I-69 regional planning office in Bloomington in July 2005;[51] to the breaking of windows of a private pro-I-69 business in Evansville in June 2008.[52] In the case of the Statehouse incident, two-dozen protesters were arrested on charges from disorderly conduct due to an assault against a police officer. In addition to incidents in Indianapolis, numerous incidents have also occurred in and around the construction sites, while it was located in Gibson County. Especially active has been a group called Roadblock Earth First which has been responsible for a number of vandalism incidents in Oakland City and at a Haubstadt asphalt yard given the contract for the first segment.[17][18] In 2009, two protesters were arrested on charges of felony racketeering for disrupting public public meetings in 2007 and 2008. These protests and acts of vandalism were widely viewed as an effort to intimidate proponents of I-69.[53]
Exit list
Exit numbers on the new southern section of I-69 are a continuation of the old I-164 exit numbering. Starting on August 6, 2012, the state of Indiana began renumbering all exits and reference posts on the original route of I-69 from I-465 to the Michigan state line by adding 200 to each value; it was decided to add an even 200 despite the fact that the new extension is only 183 miles (295 km) in order to minimize confusion.[54]
County | Location | mi[55] | km | Old exit[55] | New exit | Destinations | Notes |
---|---|---|---|---|---|---|---|
Henderson | Henderson | I-69 south – Paducah | Future I-69 south | ||||
Ohio River | 0.000 | 0.000 | Interstate 69 Ohio River Bridge Kentucky state line | ||||
Temporary southern terminus of I-69 at US 41 | |||||||
Vanderburgh | Evansville | 0 | US 41 – Vincennes, Henderson | ||||
3 | Green River Road | ||||||
Warrick | Ohio Township | 5 | SR 662 east / Covert Avenue – Newburgh | ||||
Vanderburgh | Evansville | 7 | SR 66 – Newburgh, Evansville | Signed as exits 7A (east) and 7B (west Lloyd Expressway) | |||
Knight Township | 9 | SR 62 (Morgan Avenue) – Evansville, Boonville | 38th Parallel Sign located at north end of interchange. | ||||
10 | Lynch Road | ||||||
Scott Township | 15 | Boonville–New Harmony Road | |||||
18 | SR 57 south – Evansville | Southern end of SR 57 concurrency; formerly signed as exit 19 southbound | |||||
Gibson–Warrick county line | Johnson Township | 21.494 | 34.591 | 21 | I-64 – Louisville, St. Louis | I-64 exits 29A-B; signed as exits 21A (east) and 21B (west) | |
23.231 | 37.387 | 22 | SR 57 north / SR 68 – Petersburg, Haubstadt, Lynnville | Northern end of SR 57 concurrency; northern terminus prior to November 15, 2012 | |||
Gibson | Barton Township | 27.952 | 44.984 | 27 | SR 168 – Fort Branch, Mackey | ||
Columbia Township | 33.694 | 54.225 | 33 | SR 64 – Princeton, Oakland City, Huntingburg | |||
Pike | Washington Township | 46.625 | 75.036 | 46 | SR 56 / SR 61 – Petersburg, Washington, Winslow | ||
Daviess | Washington | 62.656 | 100.835 | 62 | US 50 / US 150 – Washington, Vincennes, Shoals | ||
Elmore Township | 76.625 | 123.316 | 76 | SR 58 – Plainville, Odon | |||
Greene | Taylor Township | 87.831 | 141.350 | 87 | US 231 (SR 45 north / SR 58) – Crane, Jasper | Northern terminus from November 15, 2012, to December 9, 2015 | |
Scotland | 98 | SR 45 | Opened on December 9, 2015 | ||||
Cincinnati | 104 | SR 445 west to SR 45 / SR 54 | Opened on December 9, 2015 | ||||
Monroe | Bloomington | 114 | SR 37 south – Bedford | Opened December 9, 2015; temporary northern terminus; trumpet Interchange | |||
Temporary gap in I-69 as of December 9, 2015;[56] future route follows existing SR 37 expressway | |||||||
Monroe | Bloomington | 115 | Fullerton Pike | Interchange scheduled to open in 2017 | |||
116 | Tapp Road | Interchange scheduled to open in 2017 | |||||
117 | SR 45 south (2nd Street) | Interchange to be upgraded to Interstate standards by 2017 | |||||
118 | SR 48 (Third Street) | Interchange to be upgraded to Interstate standards by 2017 | |||||
120 | SR 45 north / SR 46 west – Spencer | Built to Interstate standards, exits to be signed as 120A (east) and 120B (west) | |||||
123 | Bus. SR 37 (Walnut Street) | Partial interchange built to Interstate standards; southbound exit only, northbound entrance from Walnut Street | |||||
Washington Township | 125 | Sample Road | Interchange scheduled to open in 2017 | ||||
Morgan | Washington Township | 134 | Liberty Church Road | Interchange scheduled to open in 2017 | |||
Temporary gap in I-69 (2017); future route follows SR 37 expressway and I-465 | |||||||
Marion | Indianapolis | 0.00– 0.40 | 0.00– 0.64 | 0 | 200 | I-465 / SR 37 south Binford Boulevard – Indianapolis | Southbound exit and northbound entrance; southern end of SR 37 concurrency; Binford Boulevard (former SR 37) is the continuation beyond I-465 |
0.84 | 1.35 | 1 | 201 | 82nd Street – Castleton | |||
Marion–Hamilton county line | Indianapolis–Fishers city line | 2.58 | 4.15 | 3 | 203 | 96th Street | |
Hamilton | Fishers | 3.74 | 6.02 | 204 | 106th Street | Scheduled to open in December 2016 | |
4.90– 5.17 | 7.89– 8.32 | 5 | 205 | 116th Street – Fishers SR 37 north – Noblesville | Complete access to 116th Street; north and southbound entrance only to SR 37 via collector-distributor lanes; northern end of SR 37 concurrency | ||
Fall Creek Township | 10.10 | 16.25 | 10 | 210 | Campus Parkway, Southeastern Parkway | Being converted into DDI (2016-2017); former SR 238 | |
Madison | Green Township | 14.41 | 23.19 | 14 | 214 | SR 13 – Fortville, Lapel | |
Pendleton | 18.66 | 30.03 | 19 | 219 | SR 38 west – Pendleton, Noblesville | Southern end of SR 38 concurrency | |
22.38 | 36.02 | 22 | 222 | SR 9 south / SR 67 south / SR 38 east – Pendleton, Anderson | Southern end of SR 9/SR 67 concurrency, northern end of SR 38 concurrency | ||
Anderson | 26.19 | 42.15 | 26 | 226 | SR 9 north / SR 109 south – Anderson | Northern end of SR 9 concurrency | |
Delaware | Daleville | 33.43– 33.74 | 53.80– 54.30 | 34 | 234 | SR 67 north – Muncie SR 32 – Anderson, Muncie | Northern end of SR 67 concurrency; SR 32 ramps are a folded diamond design using north half of the diamond interchange with SR 67 as partial collector-distributor lanes[57] |
Mount Pleasant–Harrison township line | 40.49 | 65.16 | 41 | 241 | SR 332 east / McGalliard Road – Frankton, Muncie | ||
Harrison Township | 44.71 | 71.95 | 45 | 245 | US 35 south / SR 28 – Muncie, Alexandria, Albany | Southern end of US 35 concurrency | |
Grant | Jefferson Township | 54.94 | 88.42 | 55 | 255 | SR 26 – Fairmount, Hartford City | |
Monroe Township | 59.06 | 95.05 | 59 | 259 | US 35 north / SR 22 – Gas City, Upland | Northern end of US 35 concurrency | |
64.04 | 103.06 | 64 | 264 | SR 18 – Marion, Montpelier | |||
Huntington | Jefferson Township | 72.70 | 117.00 | 73 | 273 | SR 5 / SR 218 – Warren | |
Salamonie Township | 77.38 | 124.53 | 78 | 278 | SR 5 – Huntington, Warren | ||
Markle | 86.22 | 138.76 | 86 | 286 | US 224 – Huntington, Decatur | ||
Allen | Lafayette Township | 96.29 | 154.96 | 96 | 296 | I-469 east / US 33 Lafayette Center Road west – Roanoke | Signed as exits 296A (I-469/US 33) and 296B (Lafayette Center Road); southern terminus of I-469, exit 0; southern end of US 33 concurrency |
98.83 | 159.05 | 99 | 299 | Airport Expressway, Lower Huntington Road | To Fort Wayne International Airport | ||
Fort Wayne | 101.80 | 163.83 | 102 | 302 | US 24 west / Jefferson Boulevard – Huntington, Fort Wayne | Southern end of US 24 concurrency | |
105.01 | 169.00 | 105 | 305 | SR 14 west / Illinois Road – South Whitley | Signed as exits 305A (Illinois Road east) and 305B (SR 14/Illinois Road west), eastern terminus of SR 14 | ||
108.98 | 175.39 | 109 | 309 | SR 930 east / Goshen Road – Fort Wayne US 30 west / US 33 north / Goshen Road – Columbia City, Elkhart | Signed as exits 309A (SR 930) and 309B (US 30, US 33); western terminus of SR 930; northern end of US 33 concurrency; southern end of US 30 concurrency | ||
110.64 | 178.06 | 111 | 311 | US 27 south / Lima Road – Fort Wayne SR 3 north / Lima Road – Kendallville | Signed as exits 311A (US 27) and 311B (SR 3); northern terminus of US 27 and southern terminus of SR 3 | ||
111.97 | 180.20 | 112 | 312 | Coldwater Road | Signed as exits 312A (south) and 312B (north) northbound | ||
114.72 | 184.62 | 115 | 315 | I-469 / US 24 east / US 30 east | Northern terminus of I-469, exit 31; northern end of US 24 and US 30 concurrency | ||
115.45 | 185.80 | 116 | 316 | SR 1 north / Dupont Rd | Diverging diamond interchange | ||
Perry Township | 117.23 | 188.66 | 317 | Union Chapel Road | |||
DeKalb | Keyser Township | 125.92 | 202.65 | 126 | 326 | CR 11-A | |
Auburn | 129.56 | 208.51 | 129 | 329 | SR 8 – Garrett, Auburn | ||
Grant–Smithfield township line | 133.91 | 215.51 | 134 | 334 | US 6 – Kendallville, Waterloo | ||
DeKalb–Steuben county line | Smithfield–Steuben township line | 139.77 | 224.94 | 140 | 340 | SR 4 – Ashley, Hudson, Hamilton | |
Steuben | Pleasant Township | 147.47 | 237.33 | 148 | 348 | US 20 – Lagrange, Angola | |
149.90 | 241.24 | 150 | 350 | CR 200 West – Lake James, Crooked Lake | |||
Jamestown Township | 153.54 | 247.10 | 154 | 354 | SR 127 to SR 120 / SR 727 – Orland, Fremont, Angola, Pokagon State Park | ||
155.47 | 250.20 | 156 | 356 | I-80 / I-90 / Indiana Toll Road – Chicago, Toledo | Double trumpet design in southeast quadrant of junction; additional ramps connect SR 120 and SR 127 with Toll Road; actual junction (I-69 under Toll Road) at milepoint 355.62[58] | ||
156.50 | 251.86 | 157 | 357 | To SR 120 / Lake George Road – Jamestown, Fremont, Orland | |||
157.30 | 253.15 | I-69 north – Lansing | Continuation into Michigan | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Related routes
Auxiliary route
There is one auxiliary Interstate Highway in Indiana, I-469, the beltway around the south and east sides of Fort Wayne.
Indiana Commerce Connector
The Indiana Commerce Connector (ICC) was a proposed 75-mile (121 km) partial outer beltway on the south and east sides of Indianapolis that was put forward by Governor Mitch Daniels in November 2006.[59] The proposed road segment would have connected four Interstate highways at six locations. Proposed as a privately built toll road, it would have extended southward from Pendleton at I-69, through Greenfield at I-70, Shelbyville at I-74, Franklin at I-65, Martinsville at SR 37 (future I-69), to a southern terminus at I-70 near Mooresville. On March 24, 2007, Governor Daniels withdrew the proposal for the ICC due to lack of public support.[60] It has been suggested that the ICC be signed as either I-269 or I-470.
In April 2014 the logistics group Connexus Indiana and others came out in favor of reactivating the proposal for the Indiana Commerce Connector.[61] However, the Indy Chamber (formerly the Indianapolis Chamber of Commerce) is among those who have stated opposition to the plan.[62]
See also
- U.S. Roads portal
- Indiana portal
Notes
- ↑ As of December 9, 2015
References
- ↑ "New I-69 Segment Running to Bloomington Set to Open". Indianapolis: WISH-TV. December 9, 2015. Retrieved December 9, 2015.
- ↑ Ripple, D. A (1975). "Chapters I–IV: Development of the National Program". History of the Interstate System in Indiana. Volume 1. West Lafayette, IN: Joint Highway Research Project, Indiana Department of Transportation and Purdue University. doi:10.5703/1288284313909. Publication FHWA/IN/JHRP-75/26.
- 1 2 Indiana Department of Transportation. "Home". Major Moves: 465-69 Northeast. Indiana Department of Transportation. Retrieved August 16, 2011.
- ↑ Indiana Department of Transportation. "Pipe Creek Rest Area Northbound". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
- ↑ Indiana Department of Transportation. "Pipe Creek Rest Area Southbound". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
- ↑ Indiana Department of Transportation. "Flat Creek Rest Area Northbound". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
- ↑ "Construction next to I-69 is for a new rest stop". Fort Wayne, IN: WANE-TV. July 14, 2011. Retrieved August 16, 2011.
- ↑ Indiana Department of Transportation. "Pigeon Creek Welcome Center". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
- 1 2 3 Ripple, D. A. (1975). "Chapter VI: Route History". History of the Interstate System in Indiana. Volume 3, Part 2. West Lafayette, IN: Joint Highway Research Project, Indiana Department of Transportation and Purdue University. p. 582. doi:10.5703/1288284314561. Publication FHWA/IN/JHRP-75/28-2.
- 1 2 Ripple, David Alan. "History of the Interstate System in Indiana", Purdue University, 1975.
- ↑ "INDOT Plans to Add I-69 Lanes from Fishers to Anderson". Indianapolis Star. Associated Press. February 10, 2014. Retrieved October 4, 2014.
- ↑ "106th Street & I-69 Interchange". Indiana Department of Transportation. Retrieved March 30, 2016.
- ↑ "Daniels Leery of I-69 Toll Plan". Indiana Economic Digest. October 7, 2006. Retrieved October 8, 2014.
- ↑ "Daniels: No Tolls on I-69". Indiana Economic Digest. November 9, 2006. Retrieved October 8, 2014.
- ↑ Indiana Department of Transportation. "Tier 2 Draft EIS for SIU 3, Segment 1". Indiana Department of Transportation.
- ↑ "Officials Finish Draft Study of I-69 Leg". Indianapolis Star. December 21, 2006.
- 1 2 Corbin, Bryan (July 3, 2008). "Invitation-Only Groundbreaking Set for I-69 Segment". Evansville Courier & Press.
- 1 2 Corbin, Bryan (July 17, 2008). "Long-Awaited I-69 bBegins". Evansville Courier & Press.
- ↑ Corbin, Bryan (December 11, 2007). "Judge Gives I-69 Plan Nod in Suit". Evansville Courier & Press.
- ↑ Hoosier Environmental Council v. U.S. Department of Transportation, 1:06-cv-1442 (S.D. Ind. 2001). Retrieved December 11, 2007. Archived September 17, 2008, at the Wayback Machine.
- ↑ Indiana Department of Transportation (June 1, 2007). "18 Months Construction Letting List (Major Moves Projects)" (PDF). Indiana Department of Transportation. Archived from the original (PDF) on June 25, 2007.
- ↑ Martin, John; Corbin, Bryan (March 13, 2008). "Clearing Way for Interstate Leg". Evansville Courier & Press.
- ↑ Lyman, Jill (September 29, 2009). "Detour at SR 57 and SR 68". Evansville, IN: WFIE-TV.
- ↑ Gootee, Richard (November 19, 2012). "I-69 Opens to Public at 5 P.M.". Evansville Courier & Press. Retrieved November 20, 2012.
- ↑ "Mayors: Next Section of I-69 to Open Next Week". Evansville Courier & Press. December 2, 2015. Retrieved December 2, 2013.
- ↑ "Officials Mark Start of Next I-69 Section". Archived from the original on May 5, 2015. Retrieved April 5, 2015.
- ↑ "Final decision: I-69 to be built through Johnson County". Martinsville Daily Journal. March 30, 2016. Retrieved March 30, 2016.
- 1 2 "The I-69 Freeway". Evansville Courier & Press. November 10, 2006. Retrieved November 25, 2006.
- ↑ "No Tolls". Evansville Courier & Press. January 17, 2007. Retrieved January 17, 2007.
- ↑ Lawrence, Chris (October 3, 2006). "I-69 Newsline". I-69 Newsline.
- ↑ Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), Pub.L. 109–59
- ↑ "Pence Signs Two-Year, $30 Billion State Budget". Indiana Economic Digest. Retrieved September 2, 2013.
- ↑ http://www.sfgate.com/news/article/Indiana-presses-ahead-with-I-69-s-next-section-4539902.php ]
- ↑ "Indiana Finance Authority" (PDF). State of Indiana. Retrieved February 7, 2014.
- ↑ "Indiana Finance Authority Shortlists 4 Proposers for its I-69 Section 5 Project". Infra Insight Blog. July 31, 2013. Retrieved September 2, 2013.
- ↑ Horsley, John (April 16, 2010). "Request to Extend I-69" (PDF) (Letter). Letter to Victor M. Mendez. American Association of State Highway and Transportation Officials. Retrieved August 16, 2011.
- ↑ Stinnett, Chuck (December 9, 2007). "Don't Get in Rush for I-69 Bridge". Evansville Courier & Press.
- ↑ Tate, Curtis; Gordon, Greg (February 2, 2013). "After Millions of Dollars, I-66 and I-69 are Kentucky's Interstates to Nowhere". Lexington Herald-Leader. Retrieved March 2, 2015.
- ↑ Vitale, Marty (October 28, 2013). "Special Committee on US Route Numbering Meeting Minutes for October 17, 2013 and Report to SCOH October 18, 2013" (PDF) (Report). Denver, CO: American Association of State Highway and Transportation Officials. Retrieved October 25, 2013.
- ↑ Indiana Department of Transportation (November 18, 2014). "I-164 Renamed to I-69 by End of Year" (Press release). Indiana Department of Transportation. Retrieved November 18, 2014.
- ↑ "Gov Wants Toll Road Loop Around Indy". Indianapolis Star. November 10, 2006. Archived from the original on February 10, 2007. Retrieved November 10, 2006.
- ↑ "Daniels Abandons Indy-Area Toll Road". Indianapolis Star. March 25, 2007. Archived from the original on October 14, 2007.
- ↑ Lesnick, Gavin (March 25, 2007). "Commerce Connector Scrapped,". Evansville Courier & Press.
- ↑ "INDOT Reveals Plans for Major Construction on I-465 & I-69". Indianapolis: WISH-TV. October 24, 2007. Archived from the original on May 14, 2008.
- ↑ Bradner, Eric (November 19, 2012). "What's Next: Construction of Northern End of I-69 Remains Uncertain". Evansville Courier & Press. Retrieved November 20, 2012.
- ↑ Sprout. "NAFTA Superhighway". Earth First! Journal.
- ↑ Indiana Department of Transportation. "Appendix U, I-69 and Patoka National Wildlife Refuge : History of Joint Development," (PDF). Section 2 DEIS. Indiana Department of Transportation. Archived from the original (PDF) on July 26, 2011.
- ↑ "Groups Sue to Halt I-69 Project". Fort Wayne Journal Gazette. October 3, 2006. Retrieved November 25, 2006.
- ↑ Mullins, Christy (August 27, 2010). "Public Input at Greene County INDOT Hearing: 'Stop I-69'". Bloomington Herald-Times. (subscription required (help)).
- ↑ Boyd, James (June 5, 2005). "Two Dozen Arrested at I-69 Protest". Bloomington Herald-Times. Retrieved August 5, 2009. (subscription required (help)).
- ↑ Van der Dussen, Kurt (July 19, 2005). "Vandals Hit Local I-69 Office". Bloomington Herald-Times. Retrieved August 5, 2009. (subscription required (help)).
- ↑ Lesnick, Gavin (June 25, 2008). "I-69 Protest Group Breaks Windows at Business". Evansville Courier & Press. Retrieved August 5, 2009.
- ↑ Greene, Linda (August 19, 2010). "I-69 Charges Resolved, SLAPP Suits Remain". Bloomington Alternative.
- ↑ Lanka, Benjamin (July 26, 2012). "State's Plus-200 Marker Revamp Not Quite Exact". The Journal Gazette. Fort Wayne, IN. Retrieved July 26, 2012.
- 1 2 Indiana Department of Transportation. "INDOT Roadway Referencing System" (PDF). Indiana Department of Transportation. Retrieved March 27, 2012.
- ↑ "Ceremony Marks Opening of I-69 Section in Southern Indiana". Indianapolis: WISH-TV. Associated Press. December 9, 2015. Retrieved December 10, 2015.
- ↑ Indiana Department of Transportation (December 3, 2001). Interchange 34 on I-69 (PDF) (Map). Indiana Department of Transportation.
- ↑ Indiana Department of Transportation (December 3, 2001). Interchange 156 on I-69 (PDF) (Map). Indiana Department of Transportation.
- ↑ "Governor proposes Indiana Commerce Connector, no tolls on I-69". State of Indiana. November 9, 2006. Retrieved December 29, 2015.
- ↑ "Governor Withdraws Support For Indiana Commerce Connector". TheIndyChannel.com. March 25, 2007. Retrieved December 29, 2015.
- ↑ "Groups hope to revive Indiana Commerce Connector". The Washington Times. April 6, 2014. Retrieved December 29, 2015.
- ↑ "Indy Chamber 2015 Legislative Agenda" (PDF). Indy Chamber. p. 8. Retrieved December 29, 2015.
External links
Wikimedia Commons has media related to Interstate 69 in Indiana. |
- INDOT I-69 Evansville to Indianapolis project
- Indiana Highway Ends: Interstate 69
- Central Indiana Suburban Transportation and Mobility Study (CISTMS) web page.
Interstate 69 | ||
---|---|---|
Previous state: Kentucky |
Indiana | Next state: Michigan |