Sukhumvit Line

BTS Sukhumvit line
รถไฟฟ้าบีทีเอส สายสุขุมวิท

Sukhumvit line trains at Nana Station
Overview
Type Rapid transit
System BTS Skytrain
Status Operational
Locale Bangkok, Thailand
Termini Mo Chit
Bearing
Stations 22
Daily ridership 600,000 (2012)
Operation
Opened 5 December 1999
Owner Bangkok Metropolitan Administration (BMA)
Operator(s) Bangkok Mass Transit System
Public Company Limited
Depot(s) Mo Chit
Rolling stock Siemens Modular Metro
CNR Changchun Bombardier Movia
4 cars per trainset
Technical
Line length 22.25 km (13.83 mi)
(32 km under construction)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750V DC Third rail
Operating speed 80 km/h (49.71 mph)
Route map
Legend
Khu Khot
Km. 25
Royal Air Force Museum
Bhumibol Hospital
Saphan Mai
Sai Yut
Lak Si
Wat Phra Si
11th Infantry Reg.
Bang Bua
Krom Pai Mai
Kasetsart
Sena Nikhom
Ratchayothin
Satri Woranat
 MRT  Blue Line (Down arrow Bang Sue  Hua Lamphong Right arrow)

Lat Phrao ( MRT : Phahon Yothin)
Don Mueang Tollway
Main depot

Mo Chit ( MRT :Chatuchak Park)
Saphan Khwai
Ari
Sanam Pao
Si Rat Expressway
Victory Monument

Phaya Thai

 ARL  (Suvarnabhumi Right arrow)

SRT Eastern Line (Left arrow Bangkok  Chachoengsao Right arrow)
Ratchathewi
 BTS  Silom Line (Up arrow National Stadium  Saphan Taksin Down arrow)

Siam
Chit Lom
Phloen Chit
Chaloem Maha Nakhon Expressway
Nana

Asok

 MRT  Blue Line: Sukhumvit (Left arrow Hua Lamphong  Bang Sue Right arrow)
Phrom Phong
Thong Lo
Ekkamai
Phra Khanong
Chalong Rat Expressway
On Nut
Bang Chak
Punnawithi
Udom Suk
Chaloem Maha Nakhon Expressway
Third stage Expressway System
Bang Na
Bearing
Samrong
Pu Chao Saming Plai
Kanjanapisek Expressway
Erawan Museum
Navy Academy
Samutprakarn City Hall
Srinakarindra
Prak Sa
Sai Luad
Keha Samutprakarn

The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday First line (Sukhumvit) or Sukhumvit line (Thai: รถไฟฟ้าบีทีเอส สายสุขุมวิท) is an elevated metro rail line of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom line, the line runs both northwards along Phaya Thai and Phahon Yothin Roads to Mo Chit station in Chatuchak District, and eastwards along Rama I, Phloen Chit and Sukhumvit Roads to Bearing station in Bang Na District.

When the BTS first opened in December 1999 the line consisted of seventeen stations (from Mo Chit to On Nut), currently there are 22 stations in operation.

The line is represented on the official BTS map in light green.

Stations

A planned station at N6 has never been built.

Code Station Name
English
Station Name
Thai
Transfers Location
N8 Mo Chit หมอชิต  MRT  Bangkok Chatuchak
N7 Saphan Khwai สะพานควาย Phaya Thai
N5 Ari อารีย์
N4 Sanam Pao สนามเป้า
N3 Victory Monument อนุสาวรีย์ชัยสมรภูมิ  SRT  (2019) Ratchathewi
N2 Phaya Thai พญาไท  ARL   SRT  (2019)
N1 Ratchathewi ราชเทวี
CEN Siam สยาม  BTS   BTS  (2029) Pathum Wan
E1 Chit Lom ชิดลม
E2 Phloen Chit เพลินจิต  BMA  (2029)
E3 Nana นานา Watthana
Khlong Toei
E4 Asok อโศก  MRT 
E5 Phrom Phong พร้อมพงษ์
E6 Thong Lo ทองหล่อ
E7 Ekkamai เอกมัย
E8 Phra Khanong พระโขนง
E9 On Nut อ่อนนุช
E10 Bang Chak บางจาก Phra Khanong
E11 Punnawithi ปุณณวิถี
E12 Udom Suk อุดมสุข  BTS  (proposed) Bang Na
E13 Bang Na บางนา
E14 Bearing แบริ่ง

Extensions and current construction

East

1st extension, in operation - Construction started in August 2006 on a four billion baht, 5.25 km extension from On Nut (E9) to Bearing.[1] The extension was funded by the BMA.[2] The original scheduled opening date was mid-2009. However, a delay in tendering of the contract for the electrical and signals resulted in a two-year delay. Deputy governor Teerachon Manomaiphibul commented: "The senior City Hall official responsible for making the purchase has apparently stalled the scheme over fears of being investigated if something went wrong with the purchase. The official in question is due to retire and does not want to take risks despite being told the scheme is strictly in line with regulations".[3] The extension did not open until over two years later on 12 August 2011. The delay in opening prompted the BMA to offer free travel for this extension until the end of 2011 as compensation. An additional flat fee is charged additionally to the distance-based fare of the rest of the BTS network.

2nd extension, currently under construction - Construction started in April 2012 on a 12.6 km, seven station extension from Bearing station to Samut Prakan station. Two stations (E18 and E22) will be built at a later date. The extension is funded by the MRTA as it is outside BMA city limits, Bangkok Province. Construction is contracted to take 1,350 days and the extension is planned to open in 2017. In April 2013, the MRTA awarded Ch Karnchang the contract for track laying and electrical systems.[4] As of June 2014, civil works were stated to be 28.3 percent complete. In August 2016 the BMA agreed to take over the operation of the extension from MRTA. Delays over the agreement of how much the BMA should pay MRTA caused a four month delay in the commencement of test runs on the extension, now planned for March 1 2017. Trackwork was 98% complete by November 2016. The total cost of the extension was estimated at 21.4 billion baht.[5]

Code Station Name
English
Station Name
Thai
Transfers Location
E15 Samrong สำโรง  MRT  (2019) Samut Prakan Mueang Samut Prakan
E16 Pu Chao Saming Phrai ปู่เจ้าสมิงพราย
E17 Erawan Museum พิพิธภัณฑ์ช้างเอราวัณ
E18 Naval Academy โรงเรียนนายเรือ
E19 Samut Prakan City Hall ศาลากลางจังหวัดสมุทรปราการ
E20 Srinagarindra ศรีนครินทร์
E21 Phraek Sa แพรกษา
E22 Sai Luat สายลวด
E23 Kheha Samut Prakan เคหะสมุทรปราการ

North

1st and 2nd extension, currently under construction

A 11.4 km, 11 station northern extension from Mo Chit station to Saphan Mai in Don Mueang District has been planned since the Sukhumvit line opened. Originally, this extension was scheduled to be completed by 2008. However, due to a combination of changes in government, a prolonged environmental study, and problems with locating a suitable train depot the extension has been continually delayed. A further 16.5 km, nine station extension from Saphan Mai to Lam Lukka was also planned once the extension to Saphan Mai had been completed.

After many delays, in mid-2013 it was decided to tender extension (1) and (2) at the same time by the end of 2013. However, the dissolution of parliament in November 2013 delayed this yet again. A tender was finally released in January 2014 [6] with an April deadline before being delayed until late May 2014 due to concerns from bidders.[7] A military coup in late-May 2014 suspended the bidding process whilst the military administration reviewed all major projects. In late June, the military administration affirmed the tender which will proceed before the end of 2014. In mid-August, the MRTA announced that the new tender deadline will be 30 September 2014.[8] Five bidders qualified and successful bids were due to be announced by December 2014.[9] The tender specifies a construction period of 1,350 days.

On 3 April 2015, MRTA signed four contracts for this extension:[10]

The MRTA, contactors and Thai Traffic Police met on 2 September 2015 and confirmed construction would begin on 8 September 2015. A flyover at Kasetsart will need be demolished, which commenced on 12 September 2015.[11]

Code Station Name
English
Station Name
Thai
Transfers Location
N24 Khu Khot คูคต Pathum Thani Lam Luk Ka
N23 km 25 กม. 25 Bangkok Don Mueang
N22 Royal Air Force Museum พิพิธภัณฑ์กองทัพอากาศ Sai Mai
N21 Bhumibol Hospital โรงพยาบาลภูมิพลอดุลยเดช
N20 Saphan Mai สะพานใหม่ Bang Khen
N19 Sai Yut สายหยุด
N18 Wongwian Lak Si วงเวียนหลักสี่
N17 Wat Phra Sri Maha That วัดพระศรีมหาธาตุ  MRT  (2019)
N16 11th Infantry Regiment กรมทหารราบที่ 11
N15 Bang Bua บางบัว Chatuchak
N14 Krom Pa Mai กรมป่าไม้
N13 Kaset Sart เกษตรศาสตร์  MRT  (2019)
N12 Sena Nikhom เสนานิคม
N11 Ratchayothin รัชโยธิน
N10 Phaholyothin 24 พหลโยธิน 24
N9 Lat Phrao Intersection ห้าแยกลาดพร้าว  MRT 

Future extension plans

East:

Code Station Name
English
Station Name
Thai
Transfers Location
E24 Sawangkhaniwat สวางคนิวาส
E25 Mueang Boran เมืองโบราณ
E26 Sichanpradit ศรีจันทร์ประดิษฐ์
E27 Bang Pu บางปู

North:

Code Station Name
English
Station Name
Thai
Transfers Location
N28 Eastern Outer Ring วงแหวนรอบนอกตะวันออก Pathum Thani Lam Luk Ka
N27 Khlong Ha คลองห้า
N26 Khlong Si คลองสี่
N25 Khlong Sam คลองสาม

See also

References

  1. Groundbreaking starts on new BTS extension, Daily News, 15 August 2006
  2. BTS extension budget cut, Bangkok Post, 15 December 2006
  3. Skytrain link tests delayed, Bangkok Post, 19 September 2009
  4. "Ch Karnchang gets Phase 2 of Bearing-Samut Prakan route" The Nation, 13 April 2013
  5. "BMA to postpone test run of Bearing-Samrong skytrain". Bangkok Post. Retrieved 2016-11-22.
  6. http://www.mrta.co.th/sysRegister/register131217/proc17122556.pdf
  7. http://www.prachachat.net/news_detail.php?newsid=1401076541 "รฟม.ปรับทีโออาร์หมอชิต-คูคต กลางปี59 เปิดให้บริการสายสีม่วง" Prachachat News, 26 May 2014
  8. http://www.prachachat.net/news_detail.php?newsid=1408439328
  9. http://www.matichon.co.th/news_detail.php?newsid=1412581507
  10. http://www.ryt9.com/s/iq03/2130477
  11. http://www.manager.co.th/iBizchannel/ViewNews.aspx?NewsID=9580000099688
This article is issued from Wikipedia - version of the 11/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.