Arthur Kill (Staten Island Railway station)

Arthur Kill
Staten Island Railway rapid transit station

Rendering of the future station
Station statistics
Borough Staten Island
Locale Tottenville
Coordinates 40°31′00″N 74°14′30″W / 40.5168°N 74.2416°W / 40.5168; -74.2416 (Arthur Kill Road)Coordinates: 40°31′00″N 74°14′30″W / 40.5168°N 74.2416°W / 40.5168; -74.2416 (Arthur Kill Road)
Services SIR Main Line
Structure At-grade
Platforms 2 side platforms
Tracks 2
Other information
Opened January 2017 (Planned)
Accessible
Station succession

Preceding station   Staten Island Railway   Following station
toward St. George
Main Line
future
Terminus
toward St. George
Main Line
current
toward Tottenville

Arthur Kill is a future station on the Staten Island Railway (SIR) that will replace the Atlantic and Nassau stations.

Station layout

M Mezzanine Crossover between platforms
G
Ground/
Platforms
Side platform, under construction
Southbound Main (planned) toward Tottenville (Terminus)
Northbound Main (planned) toward St. George (Richmond Valley)
Side platform, under construction

This station will be accessible to disabled persons via ramps and include a 150-car parking lot on property owned by SIR. It will have two tracks and two side platforms, with an overpass connecting the platforms.

History

Station site in October 2013

The station was expected to be complete by 2010, but was delayed due to a lack of funding in the capital program.[1][2][3] A groundbreaking ceremony was held on October 18, 2013, with a projected opening date of sometime in 2015.[4] The opening date was then pushed back to August 2016, with delays caused in part by the addition of storm resiliency measures.[5] The station's opening was pushed back once again to November 2016 due to changes in the Electric Distribution Room.[6] In October 2016, yet again, it was pushed back to January 2017, because of the redesign of the electrical distribution room, the exterior wall panel, and various communications issues.[7]

Bus connection

References

  1. "MTA Capital Program 2008–2013" (PDF). February 2008. p. 176. Retrieved January 4, 2015.
  2. "Partial Closure of the Staten Island Railway Nassau Station" (Press release). MTA New York City Transit. August 30, 2010. Retrieved January 4, 2015.
  3. Yates, Maura (April 30, 2010). "Sorry, SIR: No new cars for Staten Island Railway". Staten Island Advance. Archived from the original on May 3, 2010. Retrieved May 6, 2010.
  4. Stein, Mark D. (October 18, 2013). "Groundbreaking for new Arthur Kill Staten Island Railway station, set to open in 2015". Staten Island Advance. Retrieved January 4, 2015.
  5. "Untitled Document". web.mta.info. Retrieved 2016-06-17.
  6. "Capital Program Oversight Committee Meeting June 2016" (PDF). www.mta.info. Metropolitan Transportation Authority. June 17, 2016. Retrieved June 17, 2016.
  7. "Capital Program Oversight Committee Meeting" (PDF). mta.info. Metropolitan Transportation Authority. October 2016. Retrieved November 6, 2016.

External links

Wikimedia Commons has media related to Arthur Kill (Staten Island Railway station).
This article is issued from Wikipedia - version of the 12/1/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.