Line 2, Hangzhou Metro

Line 2, Hangzhou Metro

Overview
Type Rapid transit
System Hangzhou Metro
Status Operating
Locale Hangzhou, Zhejiang, China
Termini Qianjiang Road
Chaoyang
Stations 13
Daily ridership 81,900 (2015 peak)[1]
Operation
Opened November 24, 2014[2]
Owner Hangzhou
Operator(s) Hangzhou Metro Corporation
MTR Corporation (Hangzhou)
Character Underground
Elevated
Technical
Line length 18.3 km (11.37 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě ÈrHào Xiàn) a rapid transit line under construction in Hangzhou.[3][4] Its construction started in 2008,[5] and it is finished in 2018.[4][5]

Stations

Station Name
English
Station Name
Hanzi
Transfer
Location
Liangzhu 良渚 Yuahng
Xinliang Road 新良路
Xinyue Road 新月路
Gouzhuang 勾庄
Dongjia Road 董家路
Sandun 三墩 Xihu
Yuying Road 育英路
Sanbacun 三坝村
Wenhua Road 文华路
Fengtan Road 丰潭路
Gucui Road 古翠路
Xueyuan Road 学院路
Xiaxingqiao 下宁桥
Shentangqiao 沈塘桥
Wulinmen 武林门 Xihu
Xiacheng
Fengqi Road 凤起路
  Line 1
Xiacheng
Zhonghe Noreh Road 中河北路
Jianguo North Road 建国北路
Qingling Road 庆菱路 Jianggan
Qinchun Square 庆春广场
Qianjiang Road 钱江路
  Line 4
Jianggan
Qianjiang Century City 钱江世纪城 Xiaoshan
Yingfeng Road 盈丰路
Feihong Road 飞虹路
Zhenning Road 振宁路
Jianshe Third Road 建设三路
Jianshe First Road 建设一路
People Square 人民广场
Hangzhou Power Plant 杭发厂
Renmin Road 人民路
Panshui 潘水
Caojiaqiao 曹家桥
Chaoyang 朝阳

References

Wikimedia Commons has media related to Line 2, Hangzhou Metro.
This article is issued from Wikipedia - version of the 10/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.