Line 3, Chengdu Metro

Line 3, Chengdu Metro
Overview
Type Rapid transit
System Chengdu Metro
Status Operational
Locale Chengdu, China
Termini Chengdu Junqu General Hospital
Taipingyuan
Stations 17
Services 1
Daily ridership 354,200 (2016 Peak)[1]
Operation
Opened 31 July 2016
Owner Chengdu
Operator(s) Chengdu Metro Limited
Character Underground
Technical
Line length 20.33 km (12.63 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 3 of the Chengdu Metro (Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn) runs in a northeast-southwest direction from Chengdu Junqu General Hospital to Taipingyuan. The total length is 20.33 km. Line 3's color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.[2]

Stations

Station name Transfer Location
English Hanzi
Chengdu Junqu General Hospital 军区总医院 Jinniu
Xiongmao Avenue 熊猫大道 Chenghua
Chengdu Zoo 动物园
Zhaojuesi Road South 昭觉寺南
Simaqiao 驷马桥  7  (under construction)
Lijiatuo 李家沱
Qianfeng Road 前锋路  6  (under construction)
Hongxing Bridge 红星桥 Jinjiang
2nd Chengdu People's Hospital 市二医院  4 
Chunxi Road 春熙路  2 
Xinnanmen 新南门
Moziqiao 磨子桥 Wuhou
Sichuan Gymnasium 省体育馆  1 
Yiguanmiao 衣冠庙
Gaoshengqiao 高升桥  5  (under construction)
Hongpailou 红牌楼
Taipingyuan 太平园  10  (under construction)

See also

References

  1. "9月30日成都地铁客流达238.11万乘次 创新高". 成都全搜索新闻网. Retrieved 2016-10-02.
  2. "3号线来了 31日8时30分正式开通". Chengdu Economic Daily. 2016-07-28. Retrieved 2016-07-28.
This article is issued from Wikipedia - version of the 11/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.