Indian locomotive class WAP-7

WAP-7

Type and origin
Power type Electric
Builder Chittaranjan Locomotive Works, West Bengal, India
Total produced 279 As of August 2016
Specifications
Gauge 5 ft 6 in (1,676 mm)
Electric system(s) 25 kV 50 Hz AC Overhead
Current collection pantograph
Performance figures
Maximum speed Operational Maximum:140 km/h (87 mph)
Power output Maximum: 6,350 hp (4,735 kW)
Continuous: 6,000 hp (4,474 kW)
Career
Operators Indian Railways
Numbers 30201 onwards
Locale Northern Railways , South-Central Railway , Eastern Railway , Central Railway , Southern Railway zone , South East Central Railway

WAP 7 is a locomotive developed by Chittaranjan Locomotive Works by modifying the gear ratio of existing WAG 9 class. It is capable of hauling trains at speeds ranging between 110 to 140 kilometres per hour (68 to 87 mph) and is now largely used by Northern Railways (NR), South Central Railways (SCR), Southern Railways (SR), Eastern Railways (ER), South East Central Railway (SECR), Central Railways (CR), Western Railway (WR), West Central Railways (WCR). As of August,2016 there are 288 locomotives in service. In this all the locomotives having AAR tightlock couplers, chain link couplers are fitted.

Similarity with Freight 3-Phase Loco WAG 9

The WAP-7 locomotive is a WAG 9 freight locomotive with modified gear ratios and is set to replace the fleet of WAP 4s, the most widely used passenger locomotive today.

Performance

With a maximum speed rating of 160 km/h (99 mph),[1][2] the WAP-7 has the highest acceleration figures while hauling mail/express trains. The WAP-7 can also haul loads of 24-26 passenger coaches (1,430–1,550 t or 1,410–1,530 long tons or 1,580–1,710 short tons at 145 km/h or 90 mph).[3] At a trial conducted by Indian Railways, it clocked a speed of 187.4 km/h (116.4 mph). It is the most successful passenger locomotive on the Indian Railways roster after the WAP-4. It is used to haul premium trains like the Rajdhani Express and the Shatabdi Express apart from other regular mail/express trains.[4] It also regularly hauls other trains like the Hyderabad - New Delhi, H.Nizamuddin-Thiruvananthapuram, H.Nizamuddin-Chennai, H.Nizamuddin-Bangalore, New Delhi-Sealdah and the New Delhi - Mumbai Rajdhani Express, New Delhi- Rajendra Nagar(Patna) Patna Rajdhani Express and Nizamuddin-Ernakulam Duronto Express, Thiruvananthapuram-Chennai Super-fast Mail.

12952 Mumbai Rajdhani Express with a WAP 7 engine at New Delhi

WAP-7 locomotive can deliver 6,350 hp (4,740 kW)max, with regenerative braking being one of its salient features. The regenerative braking is deployed on down gradients conserving energy to the tune of 30-35 percent. It has an inbuilt microprocessor based fault diagnostic system to make trouble shooting easier.[5] Another feature of this locomotive is that it eliminates the need to have separate EOG sets for air-conditioning in long distance trains hence providing significant amount of savings on maintenance and running costs. This technology, called HOG or "Head On Generation", transfers electric power from the loco's pantograph to the coaches instead of "End on Generation" in which a Power Car equipped with diesel generator capable of generating adequate power of 3-phase 50 Hz 415 V / 750 V AC (called 'hotel load') is provided at either end of the train rake to supply power.[6][7][8]

Technical specifications

Manufacturers Chittaranjan Locomotive Works[9]
Traction Motors 6FRA 6068 3-phase squirrel-cage induction motors (850 kW (1,140 hp), 2180 V, 1283/2484 rpm, *270/310A; Weight- 2,100 kg (4,600 lb), forced-air ventilation, axle-hung, nose-suspended; Torque 6,330–7,140 N·m (4,670–5,270 lbf·ft). *95% efficiency.)[9]
Gear Ratio 72:20[9]
Axle load 20.5 t (20.2 long tons; 22.6 short tons)[9]
Continuous Power 6,120 hp (4,560 kW)
Wheel diameter 1,092 mm (43 in) new, 1,016 mm (40 in) worn[9]
Wheelbase 15,700 mm (51 ft 6 18 in)[9]
Bogies Co-Co, Fabricated Flexicoil Mark IV bogies; bogie wheelbase 1,850 mm (72 78 in) + 1,850 mm (72 78 in)[9]
Unsprung mass per axle 3.984 t (3.921 long tons; 4.392 short tons)[9]
Length over buffers 20,562 mm (67 ft 5 12 in)[9]
Length over headstocks 19,280 mm (63 ft 3 in)[9]
Body width 3,152 mm (10 ft 4 18 in)[9]
loco weight 123 t (121 long tons; 136 short tons)[9]
Cab length 2,434 mm (95 78 in)[9]
Pantograph locked down height 4,255 mm (13 ft 11 12 in)[9]

Locomotive Sheds

The current locomotive sheds which house this locomotive are:

  1. Ghaziabad/GZB (Zone:NR)
  2. Lallaguda/LGD (Zone:SCR)
  3. Royapuram/RPM (Zone:SR)
  4. Tughlakabad/TKD (Zone:WCR)
  5. Ajni/AQ (Zone:CR)
  6. Howrah/HWH (Zone:ER)
  7. Bhilai/BIA (Zone:SECR)
  8. Vadodara/BRC (Zone:WR)
  9. Waltair/WAT (Zone:ECoR)

Named Locos

thumb

Trains hauled by WAP-7

Southern Railway's prestigious train Vaigai Express Hauled by WAP -7
12717 Ratnachal Express hauled by WAP -7
Telangana Express with a WAP -7 loco
12713 (BZA-SC) Sathavahana Express hauled by WAP -7
GZB WAP7 in Duronto livery with 12952 Mumbai Rajdhani Express
12136 Pune Nagpur Express Hauled by Ajni WAP-7 loco.

Accidents and incidents

On 10 July 2011 Kalka Mail derailed on the Kanpur-Fatehpur line near the Fatehpur railway station , more than 72 persons died and 200 were injured,some critically. The train was hauled by Ghaziabad-based WAP 7 30221. Malfunction of the undergear of the locomotive could also be a reason. The driver of the Kalka Mail said he saw the engine shaking.[10] A post-accident diagnostic revealed that the first axle (leading) of the locomotive registered a jerk and the fourth axle (trailing bogie) showed loss of contact of the wheel with the track. The locomotive in question has been re-railed and is undergoing fault diagnostics and repairs.

On 14 December 2014 the 12381 UP Howrah - New Delhi Poorva Express derailed at 8.27 am after leaving Howrah at 8.15 am. 11 sleeper coaches and a pantry car (AC Hot Buffer Car) of the New Delhi-bound Poorva Express derailed at Liluah shortly after leaving Howrah station. There was no casualty or injury to any passenger. Like Kalka Mail this train was also hauled by Ghaziabad-based WAP 7. But the locomotive did not face much damage hence after undergoing fault diagnostics and repairs the locomotive has been re-railed.

See also

References

  1. PTI. "New energy-efficient loco introduced for high speed trains". Economic Times. Retrieved Feb 9, 2012.
  2. https://m.youtube.com/watch?v=HCzpFIKzpbs, retrieved 2015-10-31 Missing or empty |title= (help)
  3. (PDF) http://www.rdso.indianrailways.gov.in/works/uploads/File/13_10_09.pdf. Missing or empty |title= (help)
  4. "New energy-efficient loco introduced for high speed train". Economic Times. 9 Feb 2012. Retrieved 25 Aug 2012.
  5. "Southern Railway inducts fast locomotive". The Hindu. 18 Oct 2012.
  6. "Train had WAP-7 engine, 'black box' may reveal cause". Zee News. 9 Aug 2010. Retrieved 25 Aug 2012.
  7. "Recent Developments". Chittaranjan Loco works. Retrieved 25 Aug 2012.
  8. "Development of Electric locomotive with Head On Generation (HOG) facility" (PDF). Indian Railways.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 "Recent Developments". IRFCA.
  10. "Engine failure behind Kalka Mail tragedy". IBN Live. 13 July 2011. Retrieved 14 July 2011.

External links

Wikimedia Commons has media related to Indian locomotive class WAP7.
This article is issued from Wikipedia - version of the 12/3/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.